Western Australian Consolidated Regulations A person shall not
enter a trench or other excavation made in connection with the construction or
maintenance of a pipeline where —
(a) the
nature of the environment and properties and conditions of the soil in which
the trench or excavation is made are such that the walls of the trench or
excavation are likely to collapse; or
(b) the
depth of the trench or excavation is greater than
5 feet —
unless the walls of
the trench or excavation —
(c) have
been provided with shoring; or
(d) have
been battered —
in such a manner so as
to prevent the collapse of the walls.