Western Australian Consolidated Regulations A pipeline management
plan must include a comprehensive description of —
(a) the
design for the pipeline, the route corridor in which the pipeline is or is to
be constructed, the pipeline’s interface start and end positions, and
the way in which the pipeline is or is to be constructed; and
(b) the
matters agreed under regulations 10(a) and 16(a); and
(c) the
compositions of petroleum that are to be conveyed through the pipeline when it
is operating; and
(d) the
safe operating limits for conveying those compositions through the pipeline.