NATIONAL THIRD PARTY ACCESS CODE FOR NATURAL GAS PIPELINE SYSTEMS - REG 6.11

NATIONAL THIRD PARTY ACCESS CODE FOR NATURAL GAS PIPELINE SYSTEMS - REG 6.11

6.11

                The Arbitrator must provide a final decision under section 6.7 within three months of requiring parties to make submissions under section 6.4. The Arbitrator must also ensure that there is a period of at least 14 days:

            (a)         between requiring parties to make submissions under section 6.4 and the last day for such submissions specified by the Arbitrator; and

            (b)         between providing a draft decision to the parties under section 6.9(b) and the last day for submissions on the draft decision specified by the Arbitrator.

                In all other respects the timing for the taking of each of the steps set out in section 6.9 is a matter for the Arbitrator to determine.