24 .         Extension of time during which permit has effect (s. 32(3))

        (1)         The relevant permit authority may extend the time during which a permit has effect if the permit authority is satisfied that —

            (a)         the work, or stage of work, for which the permit was granted has not been completed; or

            (b)         the extension is necessary to allow rectification of defects in the work, or the stage of work, for which the permit was granted.

        (2)         If a relevant permit authority extends the time during which a permit has effect the permit authority may impose any condition on the permit that the permit authority could have imposed under section 27.