Victorian Consolidated Regulations

[Index] [Search] [Notes] [Noteup] [Download] [Help]

VICTORIAN ENERGY EFFICIENCY TARGET REGULATIONS 2008

S.R. No. 158/2008
Version incorporating amendments as at  1 January 2012

TABLE OF PROVISIONS

           Regulation Page

   PART 1-PRELIMINARY

   1.      Objectives
   2.      Authorising provisions
   3.      Commencement
   4.      Definitions
   5.      Standards

   PART 2-PRESCRIBED ACTIVITIES

   6.      Prescribed activities undertaken in residential premises for which certificates may be created
   6AA.    Prescribed activities undertaken in business and non-residential premises for which certificates may be created
   6A.     Manner in which right to create a certificate may be assigned
           in certain cases
   6B.     Record keeping in relation to assignments of rights made by oral notice
   7.      Time at which prescribed activity is undertaken
   8.      Certificate not to be created more than once for same product
           or activity in residential premises
   8A.     Certificate not to be created more than once for same product installed in business or non-residential premises
   9.      Register to be kept by the ESC
   10.     Conditions and circumstances under which a certificate cannot be created
   10A.    Discount factor

   PART 3-GENERAL

   11.     Shortfall penalty rate
   12.     Scheme acquisition
   13.     VEET scheme target
           __________________
           SCHEDULE 1-Water Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 2-Solar Retrofit Kit

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 3-Solar Water Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 4-Solar Pre-Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 5-High Efficiency Ducted Gas Heater Replacing a Ducted Gas Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 6-High Efficiency Ducted Gas Heater Replacing a Central Electric Resistance Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 7-High Efficiency Ducted Air to Air Heat Pump Replacing a Ducted Air to Air Heat Pump

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 8-High Efficiency Ducted Air to Air Heat Pump Replacing Central Electric Resistance Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 9-Gas or Liquefied Petroleum Gas Space Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 10-Space Air to Air Heat Pump

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 11-Ceiling Insulation

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 12-Under Floor Insulation

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 13-Thermally Efficient Window

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 14-Installation of Product on Single Glazed Window Raising Thermal Efficiency

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 15-Weather Sealing

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 16-Revoked
           SCHEDULE 17-Low Flow Shower Rose

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 18-Revoked
           SCHEDULE 19-Destruction of Pre-1996 Refrigerator or Freezer

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 20-High Efficiency Ducted Gas Heater

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 21-Lighting

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 22-High Efficiency Refrigerators and Freezers

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 23-Replacement of Refrigerative Air Conditioner with Ducted Evaporative Cooler

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 24-Installation of High Efficiency Television

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 25-Installation of Energy Efficient (Low Greenhouse Intensity) Clothes Dryer

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 26-Installation of High Efficiency Pool Pump

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 27-Data Table
           SCHEDULE 28-Replacement of Gas Heating Ductwork

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
           SCHEDULE 29-Installation of Standby Power Controller

   PART A-CRITERIA

   PART B-CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

   PART C-TIME AT WHICH ACTIVITY UNDERTAKEN
   _______________
           ENDNOTES
           1. General Information
           2. Table of Amendments
           3. Explanatory Details


[Index] [Search] [Notes] [Noteup] [Download] [Help]