Victorian Consolidated Legislation
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
Crown Land (Reserves) Act 1978 - SECT 29G
Control and management of water authority structures etc. in Bendigo and Macedon Regional Parks
29G. Control and management of water authority structures etc. in Bendigo and
Macedon Regional Parks
(1) The Minister, with the agreement of the Minister administering the
Water Act 1989, may enter into an agreement with an authority (within the
meaning of that Act) to manage and control any structures and installations in
the reserve described in Division 1 or Division 3 of Part 4A of the Fifth
Schedule, or to construct any new structures or installations on that land,
and that are specified in the agreement.
(2) For the purposes of giving effect to an agreement under subsection (1),
the authority may operate, repair, replace, maintain, remove, connect,
disconnect or do any other thing necessary to manage or control any structure
or installation specified in the agreement.
(3) In this section, structures and installations includes, but is not limited
to, weirs, channels, pipelines, buildings, water gauging stations, and survey
and geotechnical monitoring points.
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]