PLUMBING REGULATIONS 2004 (S.R. 2004, NO. 44)
- (S.R. 2004, NO. 44)Table of Provisions
Long TitlePART 1 - Preliminary
- 1 Short title
- 2 Commencement
- 3 Interpretation
- 4 Certain plumbing and plumbing work exempt
- 5 Prescribed plumbing work
- 6 Mandatory notification stages
PART 2 - Restrictions
- 7 Non-complying products and materials
- 8 Substances not to be discharged into sewerage system
- 9 Trade waste
- 10 Swimming pool discharge
- 11 Backflow prevention devices
- 12 Installation of on-site waste water management systems
- 13 Sewerage inlets and flood levels
PART 3 - Permits Division 1 - Consideration of application for
plumbing permits- 14 Reliance on certificate from other person
- 15 Permit for staged works
- 16 Modifications to permit application
- 17 Granting of plumbing permits
- 18 Distribution of documents
- 19 Review of decision
- 20 Variations to permit
- 21 Variations to special plumbing permit trade waste
- 22 Suspension of special plumbing permit
- 23 Cancellation of special plumbing permit
- 24 Transfer of special plumbing permit
- 25 Change of owner, agent of owner, designer or plumber
Division 2 - Special plumbing permit conditions
- 26 Conditions on permit in relation to declared drainage flood level
- 27 Conditions on permit for trade waste system or on-site waste water management system
- 28 Conditions on permit for discharge of trade waste
- 29 Conditions on permit for swimming pool
- 30 Conditions on permit for backflow prevention device
- 31 Conditions on permit for basement plumbing work
- 32 Condition on permit for connection to water supply system, sewerage system or stormwater system
PART 4 - Carrying out plumbing work
- 33 Standard of plumbing work
- 34 Plumbing work over service easement
- 35 Products and materials
- 36 Plumbing work in unregistrable relocatable buildings
- 37 Responsibility for plumbing work and materials
- 38 Authorisation to start work
- 39 Issue and refusal of start-work authorisations
- 40 Connections to council systems
- 41 Disconnection of services
PART 5 - Inspection and enforcement
- 42 Inspection and testing materials
- 43 Non-inspection at a mandatory notification stage
- 44 Consent to proceed
- 45 Direction to demolish, open, cut into or test
- 46 Written inspection directions
- 47 Infringement notices
PART 6 - Use of on-site waste water management system
- 48 Use of on-site waste water management system
PART 7 - Maintenance and Management
- 49 Maintenance and management of plumbing installations
- 50 Maintenance and management of on-site waste water management systems
- 51 Random inspections
- 52 Service rate
- 53 Backflow prevention devices
- 54 Water temperature control devices
PART 8 - Miscellaneous
- 55 Appeal under regulations
- 56 Fees
- 57 Transitional and savings provisions
- 58 Statutory Rules rescinded SCHEDULE 1 SCHEDULE 2 SCHEDULE 3 SCHEDULE 4 SCHEDULE 5 SCHEDULE 6
[ Note: This table has been automatically generated and may be incomplete. ]