Tasmanian Consolidated Regulations
- (S.R. 2004, NO. 44)
TABLE OF PROVISIONS
Long Title
PART 1 - Preliminary
1. 1. Short title
2. 2. Commencement
3. 3. Interpretation
4. 4. Certain plumbing and plumbing work exempt
5. 5. Prescribed plumbing work
6. 6. Mandatory notification stages
PART 2 - Restrictions
7. 7. Non-complying products and materials
8. 8.
9. 9. Trade waste
10. 10. Swimming pool discharge
11. 11. Backflow prevention devices
12. 12. Installation of on-site waste water management systems
13. 13. Sewerage inlets and flood levels
PART 3 - Permits Division 1 - Consideration of application for
plumbing permits
14. 14. Reliance on certificate from other person
15. 15. Permit for staged works
16. 16. Modifications to permit application
17. 17. Granting of plumbing permits
18. 18. Distribution of documents
19. 19. Review of decision
20. 20. Variations to permit
21. 21. Variations to special plumbing permit trade waste
22. 22. Suspension of special plumbing permit
23. 23. Cancellation of special plumbing permit
24. 24. Transfer of special plumbing permit
25. 25. Change of owner, agent of owner, designer or plumber
Division 2 - Special plumbing permit conditions
26. 26. Conditions on permit in relation to declared drainage flood
level
27. 27. Conditions on permit for trade waste system or on-site waste
water management system
28. 28. Conditions on permit for discharge of trade waste
29. 29. Conditions on permit for swimming pool
30. 30. Conditions on permit for backflow prevention device
31. 31. Conditions on permit for basement plumbing work
32. 32. Condition on permit for connection to water supply system,
sewerage installation or stormwater system
PART 4 - Carrying out plumbing work
33. 33. Standard of plumbing work
34. 34. Plumbing work over service easement
35. 35. Products and materials
36. 36. Plumbing work in unregistrable relocatable buildings
37. 37. Responsibility for plumbing work and materials
38. 38. Authorisation to start work
39. 39. Issue and refusal of start-work authorisations
40. 40. Connections to stormwater systems
41. 41. Disconnection of services
PART 5 - Inspection and enforcement
42. 42. Inspection and testing materials
43. 43. Non-inspection at a mandatory notification stage
44. 44. Consent to proceed
45. 45. Direction to demolish, open, cut into or test
46. 46. Written inspection directions
47. 47. Infringement notices
PART 6 - Use of on-site waste water management system
48. 48. Use of on-site waste water management system
PART 7 - Maintenance and Management
49. 49. Maintenance and management of plumbing installations
50. 50. Maintenance and management of on-site waste water management
systems
51. 51. Random inspections
52. 52. Service rate
53. 53. Backflow prevention devices
54. 54. Water temperature control devices
PART 8 - Miscellaneous
55. 55. Appeal under regulations
56. 56. Fees
57. 57. Transitional and savings provisions
58. 58.
SCHEDULE 1
SCHEDULE 2
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 6
[ Note: This table has been automatically generated and may be incomplete. ]