Tasmanian Consolidated Regulations
- (S.R. 2002, NO. 78)
TABLE OF PROVISIONS
Long Title
PART 1 - Preliminary
1. 1. Short title
2. 2. Commencement
3. 3. Interpretation
4. 4. Penalties
PART 2 - Technical and safety requirements
5. 5. General requirements for safe operation standards
6. 6. Adoption of standards
7. 7. Information and training
8. 8. Provision of training
9. 9. Gas quality
10. 10. Measurement of gas quality
11. 11. Operating pressure and heating value of gas
12. 12. Requirements as to change in gas
13. 13. Testing of gas for heating value, pressure, &c.
14. 14. Odour of gas
PART 3 - Design and construction of facilities
15. 15. Design of facilities
16. 16. Construction safety management plan
PART 4 - Safety and operating plans
17. 17. Plan to include details of manager of facility
18. 18. Person responsible for safety and operating plan
19. 19. Description of facility
20. 20. Formal safety assessment
21. 21. Address where records kept
22. 22. Schedule of reports
23. 23. Availability of safety and operating plans
24. 24. Initial audits of safety and operating plans
25. 25. Periodical audits of safety and operating plans
26. 26. Safety system records
PART 5 - Content of safety management system
27. 27. Minimum requirements of safety management system
28. 28. Safety policy
29. 29. Organisational structure and responsibilities
30. 30. Published technical standards
31. 31. Design, construction, installation, operation, maintenance and
modification
32. 32. Control systems
33. 33. Machinery and equipment
34. 34. Permit-to-work system
35. 35. Emergency preparedness
36. 36. Emergency communication systems
37. 37. Internal monitoring, auditing and reviewing
38. 38. Key performance indicators
39. 39. Gas incident recording, investigation and reviewing
40. 40. Training and qualification
PART 6 - Reporting of incidents
41. 41. Mandatory reporting of incidents
42. 42. Reporting of incidents
PART 7 - Gas installations and gas fitting work
43. 43. Standard gas installations
44. 44. Standard gas installation maximum gas consumption and
piping length
45. 45. Prescribed class of standard gas installation
46. 46. Application for acceptance of gas installation
47. 47. Statement of compliance
48. 48. Connection of gas to installation
49. 49. Owner of Type B appliance to keep records
50. 50. Certificate of compliance
51. 51. Installation of Type A appliances
52. 52. Requirements for Type A compliance plates
53. 53. Compliance plates for Type B appliances
54. 54. Work on gas installations
55. 55. General responsibilities of person carrying out gas fitting
work
55A. 55A. Commissioning gas fitting work
56. 56. Reporting of gas installation or gas storage system incidents
57. 57. Dangerous gas installations
58. 58. Clearance of consumer piping
59. 59. Gas pressureraising devices in consumer piping
60. 60. Notice of proposal to carry out certain gas fitting work
61. 61. Hot-tapping work
62. 62. Special requirements for highpressure consumer piping
63. 63. Notice of defects
64. 64. Notice of rectification
65. 65. Appeal against notice of defects
PART 7A - Automotive Gas Fitting Work
65A. 65A. Interpretation
65B. 65B. Installation of automotive gas fuel system
65C. 65C. Service and repair of automotive gas fuel system
65D. 65D. Sale of vehicle and industrial equipment with automotive gas
fuel system
65E. 65E. Automotive gas containers
PART 8 - Miscellaneous
66. 66. Emergency work on public land
67. 67. Information on location of gas infrastructure
68. 68. Sale of caravan with LPG systems
69. 69. Gas fitting work on boat
70. 70. Interstate compliance plates
SCHEDULE 1
SCHEDULE 2
[ Note: This table has been automatically generated and may be incomplete. ]