South Australian Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Download] [Help]

WATERWORKS REGULATIONS 1996 - SCHEDULE 3

Schedule 3—Water efficiency plans

1—Preparation of water efficiency plans

A draft water efficiency plan must be prepared and submitted to the Minister for approval—

            (a)         in the case of a new water efficiency plan—not later than the date specified by the Minister by notice in the Gazette; or

            (b)         in the case of a water efficiency plan that is to replace an expiring plan—not later than the day on which the existing water efficiency plan expires.

2—Contents of water efficiency plans

A draft water efficiency plan must include the following information:

            (a)         a description of the person’s current water usage;

            (b)         a list of water savings measures (expressed in terms of water saved, cost effectiveness and potential benefits) that the person proposes to implement in the 5 year period following approval of the water efficiency plan (including initial set up costs and annual costs for each measure and time frames for implementation);

            (c)         any other information required by the Minister by notice in the Gazette, or by notice in writing given to the person.



[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Download] [Help]