Queensland Consolidated Regulations
[Index]
[Search]
[Search this Act]
[Notes]
[Noteup]
[Download]
[Help]
WATER RESOURCE (MITCHELL) PLAN 2007
TABLE OF PROVISIONS
Long Title
Contents
CHAPTER 1--PRELIMINARY
1. Short title
2. Purposes of plan
3. Definitions
CHAPTER 2--PLAN AREA AND WATER TO WHICH PLAN APPLIES
4. Plan area
5. Groundwater management areas
6. Subcatchment area
7. Declaration about watercourse—Act, s 1006(2)
8. Information about areas
9. Nodes
10. Water to which plan applies
CHAPTER 3--OUTCOMES FOR SUSTAINABLE MANAGEMENT OF WATER
11. Outcomes for water in plan area
12. General outcomes
13. General ecological outcomes for both surface water and groundwater
14. General ecological outcomes for groundwater only
15. Specific ecological outcomes
CHAPTER 4--STRATEGIES FOR ACHIEVING OUTCOMES
Part 1--Strategies for both surface water and groundwater
Division 1--Preliminary
16. Application of pt 1
17. Measuring devices
18. Matters to be considered for environmental management rules
19. Matters to be considered for water sharing rules
Division 2--Unallocated water
Subdivision 1--Continued moratorium and interim arrangements
20. Continued effect of moratorium notice—Act, s 46(3)
21. Interim arrangements for applications about unallocated water
Subdivision 2--Project of regional significance
22. Projects that may be considered to be of regional significance
Subdivision 3--Dealing with unallocated water under resource operations plan generally
23. Unallocated water held as indigenous, strategic or general reserve
24. Granting unallocated water
25. Preparing and implementing process in resource operations plan generally
26. Additional requirements for dealing with unallocated water that is groundwater
Subdivision 4--Limitations on granting unallocated water from indigenous reserve
27. Purpose for which indigenous unallocated water may be granted
28. Volumetric limits for indigenous unallocated water
Subdivision 5--Limitations on granting unallocated water from strategic reserve
29. Purpose for which strategic unallocated water may be granted
30. Volumetric limits for strategic unallocated water
31. Period for which strategic unallocated water is granted for particular State purpose
Subdivision 6--Limitations on granting unallocated water from general reserve
32. Purpose for which general unallocated water may be granted
33. Volumetric limits for general unallocated water in Mitchell River upstream of node 1
34. Volumetric limits for general unallocated water in other parts of plan area
Part 2--Additional strategies for surface water
Division 1--Preliminary
35. Application of pt 2
36. Accepting and deciding particular applications to interfere with water
37. Restrictions on taking water from waterhole or lake
Division 2--Surface water that was groundwater in aquifers
38. Application of div 2
39. Existing water licences for declared water
40. Taking declared water using existing water bores authorised
41. Granting water licences for authorities under s 40
Division 3--Replacing authority with water licence
42. Water licences to replace local government authority
43. Conditions for water licences granted under s 42
Division 4--Water licences to take or interfere with surface water
44. Application of div 4
45. Water licence to take surface water
46. Purpose to be stated on water licence
47. Maximum rates for taking surface water
48. Daily volumetric limit for taking surface water
49. Annual volumetric limit for taking surface water
50. Conditions for taking surface water generally
51. Condition that must be imposed on upper Mitchell water licences
52. Condition about storing unsupplemented water taken under a water licence
53. Conditions giving effect to rules
Division 5--Regulation of overland flow water
54. Limitation on taking overland flow water—Act, s 20(6)
55. Taking water using particular existing overland flow works authorised
56. Granting or amending water licences under the resource operations plan
57. Relationship with Integrated Planning Act 1997
Part 3--Additional strategies for groundwater
Division 1--Preliminary
58. Application of pt 3
59. Relationship with Integrated Planning Act 1997
Division 2--Strategies for Chillagoe groundwater management area
60. Limitation on taking or interfering with water—Act, s 20(6)
61. Water licence to take groundwater
62. Purpose to be stated on water licence
63. Amendment of water licences to state annual volumetric limit
64. Conditions for taking groundwater
65. Taking water using existing water bores authorised
66. Granting water licences for authorities under s 65
CHAPTER 5--MONITORING AND REPORTING REQUIREMENTS
67. Monitoring
68. Monitoring programs undertaken by operators of infrastructure
69. Operators of infrastructure to give reports
70. Minister's report on plan—Act, s 53
CHAPTER 6--IMPLEMENTING AND AMENDING THIS PLAN
71. Implementation schedule
72. Minor or stated amendment of plan—Act, s 57
73. Amending or replacing plan
SCHEDULE 1 -- PLAN AREA
SCHEDULE 2 -- GROUNDWATER MANAGEMENT AREAS
SCHEDULE 3 -- SUBCATCHMENT AREA
SCHEDULE 4 -- NODES
SCHEDULE 5 -- WATER LICENCES TO REPLACE LOCAL GOVERNMENT AUTHORITY
SCHEDULE 6 -- RATES, VOLUMETRIC LIMITS AND PUMP SIZES
SCHEDULE 7 -- DICTIONARY
Endnotes
[Index]
[Search]
[Search this Act]
[Notes]
[Noteup]
[Download]
[Help]