Queensland Consolidated Regulations

[Index] [Search] [Search this Act] [Notes] [Noteup] [Download] [Help]

WORKPLACE HEALTH AND SAFETY REGULATION 2008


TABLE OF PROVISIONS

           Contents

           Part 1--Preliminary

   1.      Short title
   2.      Commencement
   3.      Definitions—the dictionary
   4.      References to standards
   5.      Reference to the doing of work by relevant person who is an employer

           Part 2--Registrable plant and registrable plant design

           Division 1--Registration of registrable plant

   6.      Registrable plant not to be used before registration
   7.      Registration of registrable plant
   8.      Notification of change of ownership of registered plant
   9.      Cessation of registration of registered plant
   10.     Refund of fees because of change of ownership of registrable plant

           Division 2--Registration of registrable plant design

   11.     Application of div 2
   12.     Plant not to be installed or used unless certificate of registration is in force
   13.     When certificate of registration is in force
   14.     Certificate number to be given
   15.     Certificate number to be marked on plant

           Part 3--High risk work and operation of earthmoving equipment and particular crane

           Division 1--Definitions

   16.     Meaning of assessment instrument
   17.     Meaning of unit of competency

           Division 2--Performing high risk work

   18.     Authority to perform high risk work
   19.     Work incidental to high risk work
   20.     Application for licence to perform a class of high risk work or for variation of licence
   21.     Application for exemption from holding licence
   22.     Decision on application for exemption
   23.     Licence holder to notify change of address
   24.     Holder to make licence issued by recognised official available for inspection

           Division 3--Performing work in an earthmoving or particular crane occupation

   25.     Authority to perform work in an earthmoving or particular crane occupation
   26.     Work incidental to earthmoving or particular crane operation
   27.     Application for earthmoving or particular crane work certificate
   28.     Application for exemption from holding certificate
   29.     Decision on application for exemption
   30.     Holder to make certificate issued by recognised official available for inspection

           Division 4--Training in work in an earthmoving or particular crane occupation or high risk work

   31.     Meaning of trainee
   32.     Duties of relevant person who is an employer for training
   33.     What training plan must state
   34.     Supervisor's duty for training
   35.     Trainee's duty for training
   36.     Supervisor to sign entry in training record

           Division 5--Obligation of relevant person who is an employer if worker is undergoing assessment for suitability to perform work

   37.     Supervision of worker and record keeping

           Division 6--Other obligations

   38.     Relevant person who is an employer must reasonably believe worker is competent
   39.     Holder of certificate or licence must reasonably believe he or she is competent
   40.     Holder of certificate or licence must take reasonable precautions and exercise proper diligence

           Division 7--Revival of authority formerly conferred by certificate of competency for work in an occupation

   41.     Revival of authority

           Division 8--Expiry of licences to perform class of high risk work issued before July 2008 unless holder converts licence to a renewable licence

   42.     Pre-July 2008 licence to perform a class of high risk work will end unless converted to a renewable licence
   43.     How to convert a pre-July 2008 licence to perform a class of high risk work to a renewable licence
   44.     Decision on application to convert to a renewable licence
   45.     Notice about ending of pre-July 2008 licence to perform a class of high risk work to be given to holder

           Part 4--Prescribed activities

           Division 1--Certificate to perform prescribed activity

   46.     Certificate to perform prescribed activity
   47.     Application for certificate to perform prescribed activity
   48.     Conditions

           Division 2--Training and supervision in prescribed activities

   49.     Duty of relevant person who is an employer for training in prescribed activity
   50.     Supervision of performance of prescribed activity by competent person

           Part 5--Bonded asbestos removal certificate

   51.     Application of pt 5
   52.     Authority to perform work to remove bonded asbestos containing material
   53.     Application for bonded asbestos removal certificate
   54.     Term of certificate
   55.     Certificate holder to notify change of address

           Part 6--Workplace health and safety officers

   56.     Workplaces requiring a workplace health and safety officer—Act, s 93
   57.     Application for certificate of authority of appointment
   58.     Approval of workplace health and safety officer course

           Part 7--Accredited providers, registered training organisations, approvals and related matters

           Division 1--Accredited providers

   59.     Application for appointment as an accredited provider
   60.     Authorised accredited provider to make record of assessment and give a copy to applicant
   61.     Record of assessment by authorised accredited provider before 1 July 2007

           Division 2--Duties, and monitoring, of registered training organisations

   62.     Registered training organisation's duty for assessing competency
   63.     When registered training organisation must not make practical assessment
   64.     Registered training organisation's duties before issuing statement of attainment
   65.     Record of assessment by registered training organisation
   66.     Other duties of registered training organisation
   67.     Monitoring of registered training organisation's compliance

           Division 3--False documents

   68.     Person must not sign false assessment summary
   69.     Making available document purporting to be statement of attainment

           Division 4--Approval of individual to provide training and assessment

   70.     Approval of individual to provide training and assessment
   71.     Chief executive to decide application for training and assessment approval within 28 days
   72.     Grant of approval
   73.     Notice of refusal of application

           Division 5--Suspension and cancellation of training and assessment approval

   74.     Grounds for suspension or cancellation of approval
   75.     Procedure for suspension or cancellation
   76.     Immediate suspension of approval
   77.     When immediate suspension has effect until

           Part 8--Certificates and licences

           Division 1--Definitions

   78.     Definitions for pt 8

           Division 2--Applications for certificates, licences and variations of licences
           Subdivision 1--Certificates, licences and variations of licences generally

   79.     How to apply for a certificate, other than an earthmoving or particular crane work certificate
   80.     How to apply for an earthmoving or particular crane work certificate
   81.     Eligibility to obtain particular licence classes
   82.     How to apply for a licence or variation of a licence to endorse another class of high risk work
   83.     If applicant for licence or variation of a licence holds a corresponding authority to licence or licence class
   84.     How to apply for a variation of a licence to remove a class of high risk work
   85.     Refusal to grant licence or variation for applicant's misconduct
   86.     Refusal to grant certificate, licence or variation—false assessment summary
   87.     Refusal to grant earthmoving or particular crane work certificate for applicant's misconduct
   88.     Refusal of application for lack of competence or for misconduct
   89.     Refusal of applications for particular certificates
   90.     Chief executive to decide application within 28 days
   91.     Grant of certificate, licence or variation of a licence
   92.     Notice of refusal of application
   93.     Grant of certificate, licence or variation of licence on conditions
   94.     Term of licence
           Subdivision 2--Renewal of licences
   95.     When licence may be renewed
   96.     How to apply for renewal of a licence
   97.     Renewal of licences
   98.     Refusal to renew licence for lack of competence
   99.     Notice of refusal of application
           Subdivision 3--Provisions about certificates of registration of registrable plant design
   100.    Application of sdiv 3
   101.    Definitions for sdiv 3
   102.    Application for certificate of registration of registrable plant design
   103.    Prohibitions relating to design verification statements
   104.    Chief executive may ask for additional information for registration
   105.    Chief executive may require information from certificate holder
           Subdivision 4--Provisions about certificates of registration of registrable plant that is mobile crane or tower crane
   106.    Application of sdiv 4
   107.    Definitions for sdiv 4
   108.    Application for certificate of registration of a mobile crane or tower crane
   109.    Application under s 108 if engineer can not inspect because of unforeseeable circumstances

           Division 3--Renewal of particular certificates

   110.    Definition for div 3
   111.    Renewal of certificate
   112.    Application for renewal before registration ends
   113.    Div 2 applies to application for renewal

           Division 4--Replacement and surrender of certificates and licences

   114.    Replacement of certificate or licence
   115.    Surrender of certificate or licence

           Division 5--Suspension and cancellation of certificates and licences

   116.    Grounds for suspension or cancellation
   117.    Procedure for suspension or cancellation
   118.    Immediate suspension of earthmoving or particular crane work certificate, licence or licence class
   119.    Further provision about immediate suspension
   120.    Suspension or cancellation of earthmoving or particular crane work certificate, licence or licence class on recommendation of recognised official
   121.    Ending of licence if application for corresponding authority
   122.    Chief executive may advise recognised official of particular matters
   123.    Requirement for retraining
   124.    Certificate or licence to be returned
   125.    Replacement licence to be issued for remaining licence class

           Division 6--Obligation of relevant person

   126.    Way to prevent or minimise risk prescribed

           Division 7--Miscellaneous

   127.    Giving information for administering Act
   128.    Particular work encompassed in licence classes

           Part 9--Notifiable building and construction work

   129.    Notification of building and construction work
   130.    Exemption from payment of fees
   131.    Recovering unpaid fees
   132.    Refund of fees
   133.    Start and finish of building and construction work

           Part 10--Injuries, illnesses and dangerous events

   134.    Notifying of particular workplace incidents
   135.    Recording particular workplace incidents
   136.    Scene not to be interfered with
           Part 11 Access--relevant person who is an employer doing work that is not construction work
   137.    Access

           Part 12--Noise

   138.    What is excessive noise
   139.    Preventing risk from exposure to excessive noise

           Part 13--Asbestos management and removal

           Division 1--Interpretation

   140.    Definitions for pt 13

           Division 2--Prohibitions relating to asbestos

   141.    Prohibited substances and prohibited ACM
   142.    Performing work on ACM
   143.    Cleaning ACM

           Division 3--On-site management of ACM

   144.    Application of div 3
   145.    Compliance with asbestos management code

           Division 4--Removing ACM

   146.    Removing ACM

           Part 14--Underwater diving work

           Division 1--Definitions for part 14

   147.    Meaning of underwater diving work
   148.    Meaning of construction diving work
           Division 2 All underwater diving work--medical fitness to dive
   149.    Requirements about certificate of medical fitness to dive
   150.    Contents of certificate of medical fitness to dive

           Division 3--Underwater diving work other than conducting recreational diving or recreational technical diving
           Subdivision 1--Preliminary

   151.    Application of div 3
   152.    Meaning of competent person for construction diving work
   153.    Meaning of competent person for other underwater diving work
   154.    Competent person for s 153—holder of ADAS diving certificate for the diving
   155.    Competent person for s 153—holder of certification under Australian Qualifications Framework
   156.    Competent person for s 153—holder of certificate for AS 4005.2 subject areas
   157.    Competent person for s 153—person doing underwater diving work on no more than 28 days in the last 6 months
           Subdivision 2--Proof of competency for underwater diving work other than construction diving work
   159.    Proof of competency
           Subdivision 3--Risk assessment and control measure process at particular stages
   160.    Process to be carried out before work starts
   161.    Process to be carried out each time there is a significant change
   162.    Work not to start or restart unless diver has read, understood and signed record of process
   163.    Record to be kept for each time process is carried out
   164.    Control measure to be in place and monitored and reviewed
           Subdivision 4--Dive safety log
   165.    Dive safety log—log must be kept
   166.    Dive safety log—required information about dives
   167.    Dive safety log—diver must sign log
   168.    Dive safety log—further signing of log
   169.    Dive safety log—log to be kept for at least 1 year
           Subdivision 5--Provisions relating only to construction diving work
   170.    ADAS diving certificate for the diving is required
   171.    Dive supervisor
   172.    Stand-by diver
   173.    Recompression chamber and qualified operator
   174.    Recompression chamber not to be operated without appropriate qualifications
   175.    When using open circuit scuba is prohibited
   176.    Work below 50m using SSBA supplying compressed air prohibited

           Division 4--Conducting recreational diving or recreational technical diving

   177.    Ways to prevent or minimise risks prescribed
   178.    Count of all persons on board to be made and recorded
   179.    Medical conditions of resort divers
   180.    Lookout and rescuer
   181.    Supervision of resort divers
   182.    Dive safety log

           Part 15--Conducting recreational snorkelling

   183.    Ways to prevent or minimise risks prescribed
   184.    Count of all persons on board to be made and recorded
   185.    Advice about medical conditions
   186.    Lookout, guide and rescuer

           Part 16--Hazardous substances

           Division 1--Definitions

   187.    Meaning of exposed
   188.    Meaning of hazardous substance

           Division 2--Manufacturers and importers

   189.    Who division applies to
   190.    Preparing, amending and reviewing MSDS
   191.    Providing MSDS
   192.    Disclosing ingredient's chemical name
   193.    Providing NICNAS summary report and other information

           Division 3--Suppliers

   194.    Who division applies to
   195.    Providing MSDS
   196.    Labelling containers

           Division 4--Relevant persons

   197.    Who division applies to
   198.    Meaning of hazardous substance for division
   199.    Obtaining MSDS
   200.    Recording and displaying MSDS
   201.    Labelling containers
   202.    Hazardous substances in enclosed systems
   203.    Risk assessments
   204.    Risk assessment records
   205.    Controlling exposure
   206.    Monitoring
   207.    Health surveillance
   208.    Confidentiality of worker's medical record
   209.    Keeping register
   210.    Keeping records
   211.    Induction and training about hazardous substances

           Division 5--Spray painting with hazardous substances

   212.    Ways to prevent or minimise risk prescribed
   213.    Manufacturing or importing a spray painting booth
   214.    Supplying a spray painting booth
   215.    Protecting persons from spray painting
   216.    Spray painting to be done in spray painting booth
   217.    Controlling exposure from spray painting
   218.    Maintaining a spray painting booth
   219.    Minimum air movement for booths

           Part 17--Lead

           Division 1--Interpretation

   220.    Meaning of exposed
   221.    Meaning of lead hazardous substance

           Division 2--Manufacturers and importers

   222.    Who division applies to
   223.    Preparing, amending and reviewing MSDS
   224.    Providing MSDS
   225.    Providing NICNAS summary report and other information

           Division 3--Suppliers

   226.    Who division applies to
   227.    Providing MSDS
   228.    Labelling containers

           Division 4--Relevant persons

   229.    Who division applies to
   230.    Obtaining MSDS
   231.    Keeping registers
   232.    Labelling containers
   233.    Risk assessment
   234.    Risk assessment records
   235.    Controlling exposure
   236.    Atmospheric monitoring
   237.    Health surveillance
   238.    Reviewing control measures
   239.    Removal of worker from a lead-risk job
   240.    Removal of relevant person from a lead-risk job
   241.    Return to a lead-risk job
   242.    Confidentiality of worker's medical record
   243.    Induction and training about lead
   244.    Keeping records

           Division 5--Workers

   245.    Who division applies to
   246.    Health surveillance
   247.    Advising of pregnancy or breast feeding

           Part 18--Confined spaces

   248.    Designing, manufacturing or supplying a confined space
   249.    Modifying a confined space
   250.    Using a confined space

           Part 19--Roll-over protective structures for wheeled tractors

           Division 1--Interpretation

   251.    Definitions for pt 19
   252.    Meaning of tractor
   253.    Demonstrator tractor is taken to be new

           Division 2--Ways to prevent or minimise risk from wheeled tractor rolling over

   254.    Ways to prevent or minimise risk prescribed
   255.    Roll-over protective structure to be fitted to wheeled tractor used by relevant person
   256.    Roll-over protective structure to be fitted to wheeled tractor used by worker

           Division 3--Obligation of prospective supplier of wheeled tractor not fitted with a roll-over protective structure

   257.    Obligation of prospective supplier of wheeled tractor not fitted with a roll-over protective structure

           Part 20--Construction work

           Division 1--Definitions

   258.    Definitions for pt 20
   259.    Meaning of high risk construction activity
   260.    Meaning of work method statement for high risk construction activity other than prescribed activity
   261.    Meaning of work method statement for high risk construction activity that is prescribed activity

           Division 2--Principal contractors
           Subdivision 1--Preliminary

   262.    Application of div 2
           Subdivision 2--Obligation to prepare construction safety plan
   263.    Principal contractor must prepare construction safety plan
   264.    When principal contractor not to allow relevant person to start housing construction work
   265.    When principal contractor not to allow relevant person to start construction work, other than housing construction work
   266.    Availability of current construction safety plan
   267.    Amendment of construction safety plan
           Subdivision 3--Principal contractor's obligation for work method statements
   268.    Principal contractor not to allow relevant person to start high risk construction activity unless work method statement prepared
   269.    Work method statement or amended work method statement to be kept with construction safety plan
   270.    Principal contractor not to allow person to perform prescribed activity unless in compliance with work method statement
   271.    Principal contractor to monitor use of work method statement
           Subdivision 4--Principal contractor's obligation to sight induction evidence and conduct site-specific workplace health and safety inductions
   272.    Principal contractor to sight general induction evidence before construction work starts
   273.    Site-specific induction to be given
           Subdivision 5--Principal contractor's obligation for others
   274.    Authority to perform work for prescribed activities, work in an earthmoving or particular crane occupation or high risk work
           Subdivision 6--Principal contractor's obligation to erect signs
   275.    Signs
           Subdivision 7--Principal contractor's obligation about safe housekeeping practices
   276.    Purpose of sdiv 7
   277.    Safe housekeeping practices
           Subdivision 8--Principal contractor's obligation for common plant
   278.    Common plant
           Subdivision 9--Principal contractor's obligation for hazardous substances
   279.    Register of hazardous substances
           Subdivision 10--Principal contractor's obligation for underground services
   280.    Information about underground services
           Subdivision 11--Principal contractor's obligation for falling objects
   281.    Application of sdiv 11
   282.    What is mesh for sdiv 11
   283.    Risk assessment and control measures for civil construction work and housing construction work
   284.    Control measures for construction work that is not civil construction work or housing construction work
   285.    Additional control measures if measured angle is 75° or more, other than for demolition work or work erecting or dismantling formwork
   286.    Control measures for demolition work or work erecting or dismantling formwork
   287.    Perimeter containment screening as control measure
   288.    Catch platform as control measure
   289.    Gantry as control measure
   290.    Load lifted over adjoining area
   291.    Closure of part or all of adjoining area
           Subdivision 12--Principal contractor's obligation for amenities
   292.    Amenities

           Division 3--Relevant persons
           Subdivision 1--Preliminary

   293.    Application of div 3
           Subdivision 2--Relevant person's obligation for work method statements
   294.    Relevant person to prepare work method statement before starting high risk construction activity
   295.    When relevant person not to allow another relevant person to start prescribed activity
   296.    When relevant person who is an employer not to allow worker to start high risk construction activity
   297.    High risk construction activity not to be performed unless in compliance with work method statement
   298.    Amendment of work method statement
   299.    Availability and review of work method statement
           Subdivision 3--Relevant person's obligation for general induction evidence
   300.    Definition for sdiv 3
   301.    Relevant person to hold general induction evidence before starting construction work
   302.    Relevant person who is an employer to ensure worker holds general induction evidence before worker starts construction work
           Subdivision 4--Relevant person's obligation for safe housekeeping practices
   303.    Safe housekeeping practices
           Subdivision 5--Relevant person's obligation for common plant
   304.    Common plant
           Subdivision 6--Relevant person's obligation for hazardous substances
   305.    Relevant person to give principal contractor details of hazardous substances to be used
           Subdivision 7--Relevant person's obligation for underground services
   306.    Risk from contact with underground services—construction work for which there is principal contractor
   307.    Risk from contact with underground services—construction work for which there is no principal contractor
           Subdivision 8--Relevant person's obligation for excavation work that could reduce the stability of a structure
   308.    Obligation before excavation work starts
   309.    Obligation during excavation work
           Subdivision 9--Relevant person's obligation for risk from excavations
   310.    Meaning of competent person for sdiv 9
   311.    Risk from all excavations
   312.    Risk from working in trench at least 1m deep
   313.    Risk from working in trench more than 1.5m deep
   314.    Access by ladders to trench more than 1.5m deep
   315.    Events in trench more than 1.5m deep that is not shored, benched or battered
           Subdivision 10--Relevant person's obligation for risk of a person falling
   316.    Definition for sdiv 10
   317.    Risk of fall of less than 3m in housing construction work or less than 2m in other construction work or construction work on roof with slope not over 26°
   318.    Risk of fall of at least 3m in housing construction work or at least 2m in other construction work or construction work on roof with a slope over 26°
   319.    Edge protection as control measure
   320.    Fall protection cover as control measure
   321.    Travel restraint system as control measure
   322.    Fall arresting platform as control measure
   323.    Fall-arrest harness system as control measure
   324.    Industrial safety net as control measure
           Subdivision 11--Relevant person's obligation for ladders
   325.    What work may be done from single or extension ladder
   326.    Work on a ladder
   327.    Ladders generally
           Subdivision 12--Relevant person's obligation for platforms supported by trestle ladders
   328.    Work on platform supported by trestle ladders
   329.    Platform supported by trestle ladders
           Subdivision 13--Relevant person's obligation for scaffolding
   330.    Obligations before starting to erect or dismantle
   331.    Erecting scaffolding
   332.    Dismantling scaffolding
           Subdivision 14--Relevant person's obligation for falling objects
   333.    Application of sdiv 14
   334.    Relevant person's obligation if no principal contractor
           Subdivision 15--Relevant person's obligation for first aid
   335.    First aid

           Division 4--Workers

   336.    Application of div 4
   337.    Worker to hold general induction evidence before starting construction work

           Division 5--General provisions about control measures and plant for this part

   338.    Control measure to be in place and monitored and reviewed
   339.    Plant not to be used as control measure unless it has been maintained
   340.    Plant erected or installed after construction work starts
   341.    Written evidence about plant from engineer or competent person may be relied on

           Division 6--Chief executive may ask for information from Queensland Building Services Authority

   342.    Definitions for div 6
   343.    Chief executive may ask general manager of Queensland Building Services Authority for relevant information
           Part 21 Amenities--work that is not construction work
   344.    Amenities for rural industry work
   345.    Amenities for work that is not construction work or rural industry work
   346.    Maintenance of amenities
           Part 22 Relevant persons who are employers--requirements for building provided for worker to occupy
   347.    Ventilation, lighting, floor area and air space for building
           Part 23 Relevant persons who are employers--atmospheric contaminants
   348.    Level of atmospheric contaminants

           Part 24--First aid

   349.    Relevant persons who are employers—work other than construction work
   350.    Relevant persons who are employers—workers performing rural industry work

           Part 25--Workplace health and safety contributions

   351.    Purpose of pt 25
   352.    Amount of workplace health and safety contribution

           Part 26--Miscellaneous

   353.    Rural industry exemption
   354.    Time for giving workplace health and safety undertaking
   355.    Workplace health and safety representative training course
   356.    Appeal against decision of Authority
   357.    Fees

           Part 27--Repeal

   358.    Repeal of Workplace Health and Safety Regulation 1997

           Part 28--Transitional provisions

           Division 1--Transitional provision for Workplace Health and Safety Amendment Regulation (No. 1) 2004

   359.    Certificate of registration of registrable plant design

           Division 2--Transitional provisions for Workplace Health and Safety Amendment Regulation (No. 3) 2004

   360.    Definitions for div 2
   361.    Persons to whom this division applies
   362.    Lunch room
   363.    Dressing room
   364.    Toilets

           Division 3--Transitional provision for Workers' Compensation and Rehabilitation and Other Legislation Amendment Regulation (No. 1) 2005

   365.    Construction work—construction safety plans

           Division 4--Transitional provisions for Workplace Health and Safety and Other Legislation Amendment Regulation (No. 1) 2007, part 2, division 2

   366.    Application for certificate of authority of appointment of a workplace health and safety officer—assessment made but no application made before 1 July 2007
   367.    Application for certificate of authority of appointment of a workplace health and safety officer—unfinished training or assessment
   368.    Application for certificate of authority of appointment of a workplace health and safety officer—undecided application made before 1 July 2007

           Division 5--Transitional provision for Workplace Health and Safety Legislation Amendment Regulation (No. 1) 2007

   369.    Application for certificate of registration of mobile crane or tower crane

           Division 6--Transitional provisions for Workplace Health and Safety and Other Legislation Amendment Regulation (No. 1) 2007, part 2, division 3

   370.    Applications for certificates to work in a prescribed occupation
   371.    Unfinalised proposed action

           Division 7--Transitional provision for Workplace Health and Safety and Other Legislation Amendment Regulation (No. 1) 2008

   372.    Statement in assessment summary for unit of competency that person is competent

           Division 8--Transitional provision for Workplace Health and Safety Regulation 2008

   373.    Continuation of converted certificates
   374.    References to repealed regulation

           Division 9--Transitional provision for Workplace Health and Safety and Another Regulation Amendment Regulation (No. 1) 2009

   375.    General induction training course completed before 1 July 2009
           SCHEDULE 1 -- FEES
           SCHEDULE 2 -- ACCREDITED COURSES
           SCHEDULE 3 -- REGISTRABLE PLANT
           SCHEDULE 4 -- REGISTRABLE PLANT DESIGN
           SCHEDULE 5 -- CLASSES OF HIGH RISK WORK AND UNITS OF COMPETENCY FOR THE CLASSES

           Part 1--Scaffolding work
           1. Basic scaffolder
           2. Intermediate scaffolder
           3. Advanced scaffolder

           Part 2--Rigging work
           4. Dogger
           5. Basic rigger
           6. Intermediate rigger
           7. Advanced rigger

           Part 3--Crane and hoist operation
           8. Tower crane
           9. Self-erecting tower crane
           10. Derrick crane
           11. Portal boom crane
           12. Bridge and gantry crane (open)
           13. Vehicle loading crane
           14. Non-slewing mobile crane
           15. Slewing mobile crane with a capacity of 20t or less
           16. Slewing mobile crane with a capacity of 60t or less
           17. Slewing mobile crane with a capacity of 100t or less
           18. Slewing mobile crane with a capacity of more than 100t
           19. Materials hoist
           20. Materials or personnel hoist
           21. Boom-type elevating work platform
           22. Mobile truck-mounted concrete placing boom

           Part 4--Forklift operation
           23. Forklift truck
           24. Order picking forklift truck

           Part 5--Pressure equipment operation
           25. Basic boiler operator
           26. Intermediate boiler operator
           27. Advanced boiler operator
           28. Turbine operator
           29. Reciprocating steam engine operator
           SCHEDULE 5A -- CLASSES OF HIGH RISK WORK AND UNITS OF COMPETENCY FOR THE CLASSES UNDER NATIONAL STANDARD

           Part 1--Scaffolding work
           1. Basic scaffolder
           2. Intermediate scaffolder
           3. Advanced scaffolder

           Part 2--Rigging work
           4. Dogger
           5. Basic rigger
           6. Intermediate rigger
           7. Advanced rigger

           Part 3--Crane and hoist operation
           8. Tower crane
           9. Self-erecting tower crane
           10. Derrick crane
           11. Portal boom crane
           12. Bridge and gantry crane (open)
           13. Vehicle loading crane
           14. Non-slewing mobile crane
           15. Slewing mobile crane with a capacity of 20t or less
           16. Slewing mobile crane with a capacity of 60t or less
           17. Slewing mobile crane with a capacity of 100t or less
           18. Slewing mobile crane with a capacity of more than 100t
           19. Materials hoist
           20. Materials or personnel hoist
           21. Boom-type elevating work platform
           22. Mobile truck-mounted concrete placing boom

           Part 4--Forklift operation
           23. Forklift truck
           24. Order picking forklift truck

           Part 5--Pressure equipment operation
           25. Turbine operator
           26. Reciprocating steam engine operator
           SCHEDULE 6 -- EARTHMOVING OR PARTICULAR CRANE OCCUPATIONS AND UNITS OF COMPETENCY FOR THE OCCUPATIONS
           1. Bridge and gantry crane (remote control only)
           2. Dozer
           3. Excavator having an engine capacity of more than 2L
           4. Front-end loader having an engine capacity of more than 2L
           5. Front-end loader or backhoe having an engine capacity of more than 2L
           6. Grader
           7. Road roller having an engine capacity of more than 2L
           8. Skid steer loader having an engine capacity of more than 2L
           9. Scraper

           SCHEDULE 7 -- PARTICULAR WORK ENCOMPASSED IN LICENCE CLASSES
           SCHEDULE 8 -- HAZARDOUS SUBSTANCES FOR WHICH HEALTH SURVEILLANCE MUST BE SUPPLIED
           SCHEDULE 9 -- PROHIBITED SUBSTANCES, PROHIBITED ACM AND PROHIBITED PURPOSES
           1. Amosite, crocidolite, fibrous anthophyllite, tremolite or actinolite
           2. Chrysotile
           SCHEDULE 10 -- LEAD HAZARDOUS SUBSTANCES

           SCHEDULE 11 -- PRINCIPAL CONTRACTORS--PARTICULAR AMENITIES FOR CONSTRUCTION WORK

           Part 1--Definition for schedule 11
           1. Definition

           Part 2--Toilets
           2. Toilets
           3. When toilet must be connected toilet or portable toilet
           4. Privacy, ventilation and toilet paper

           Part 3--Other amenities
           5. Room, or sheltered area, to eat meals in
           6. Hands and face washing facilities
           7. Drinking water

           SCHEDULE 12 -- RELEVANT PERSONS WHO ARE EMPLOYERS--PARTICULAR AMENITIES FOR RURAL INDUSTRY WORK

           Part 1--Toilets for workers and relevant person
           1. Toilets

           Part 2--Other amenities for workers
           2. Application of pt 2
           3. Sheltered area to eat meals in
           4. Hands washing facilities
           5. Drinking water

           SCHEDULE 13 -- RELEVANT PERSONS WHO ARE EMPLOYERS--PARTICULAR AMENITIES FOR WORK THAT IS NOT CONSTRUCTION WORK OR RURAL INDUSTRY WORK

           Part 1--Application of schedule 13
           1. Application of sch 13

           Part 2--Explanation of applied BCA provisions or applied QDC provisions used for part 3 or schedule 14
           2. Definitions for pt 2
           3. Purpose of applied BCA or applied QDC provisions
           4. Changes to the text of BCA or QDC in modified provision
           5. Interpretation of applied BCA or applied QDC provisions

           Part 3--If worker is at workplace where non-class 10 building is provided for workers to occupy

           Division 1--Application of part 3
           6. Application of pt 3

           Division 2--Toilets, and hands and face washing facilities
           Subdivision 1--If the building is a class 1b building or relevant person's domestic premises
           7. Toilets
           8. Hands and face washing facilities
           Subdivision 2--If the building is a particular class of building and not relevant person's domestic premises
           9. Application of sdiv 2
           10. Toilets, and hands and face washing facilities
           11. Performance requirements to be complied with
           12. How to comply with performance requirements
           13. Location of toilet
           14. Toilet paper and disposal of female sanitary items
           15. Hands and face washing facilities to include soap, water and hands drying facilities

           Division 3--Dining facilities
           16. Dining facilities
           17. Performance criteria to be complied with
           18. How to comply with performance criteria mentioned in this part or sch 14
           19. If worker is able to eat in work area

           Division 4--Dressing room facilities
           20. Dressing room facilities
           21. Performance criteria to be complied with

           Division 5--Drinking water
           22. Drinking water
           23. Performance criteria that may be complied with

           Division 6--Other amenities
           24. Hands and face washing facilities
           25. Showers

           Division 7--Approval to use alternative solution to performance requirement or performance criteria
           26. Application for approval to use alternative solution
           27. Decision on application

           Part 4--If worker is not at workplace where non-class 10 building is provided for workers to occupy
           28. Application of pt 4
           29. Toilets
           30. Sheltered area to eat meals in
           31. Drinking water
           32. Hands washing facilities
           33. Showers
           SCHEDULE 14 -- RELEVANT PERSONS WHO ARE EMPLOYERS--REQUIREMENTS FOR BUILDING PROVIDED FOR WORKER TO OCCUPY WHEN PERFORMING PARTICULAR WORK

           Part 1--Application of schedule 14
           1. Application of sch 14

           Part 2--Ventilation
           2. Ventilation
           3. How to comply with performance requirements

           Part 3--Lighting
           4. Lighting

           Part 4--Floor area and air space
           5. Floor area and air space
           SCHEDULE 15 -- APPLIED BCA PROVISIONS
           SCHEDULE 16 -- APPLIED QDC PROVISIONS
           SCHEDULE 18 -- DICTIONARY
           Endnotes


[Index] [Search] [Search this Act] [Notes] [Noteup] [Download] [Help]