Queensland Consolidated Regulations
[Index]
[Search]
[Search this Act]
[Notes]
[Noteup]
[Download]
[Help]
STANDARD PLUMBING AND DRAINAGE REGULATION 2003
TABLE OF PROVISIONS
Contents
Part 1--Preliminary
Division 1--Introduction
1. Short title
2. Commencement
Division 2--Status of regulation
3. Status
Division 3--Interpretation
4. Definitions
4A. What is the Queensland Plumbing and Wastewater Code (or QPW code)
5. What are the applied provisions and glossary
6. Interpretation of applied provisions
Part 1A--Prescribed matters for Act
6B. Criteria for deciding application for compliance permit for greywater use facility in a sewered area
7. Minor work—Act, sch, definition minor work
8. Unregulated work—Act, sch, definition unregulated work
Part 2--Compliance with particular codes and standards
8A. Compliance with Plumbing Code of Australia
8B. Compliance with QPW code
8C. Relationship between PCA and QPW code
9. Regulated work and on-site sewerage work
10. Minor work and unregulated work
11. Limited application of AS/NZS 3500.1:2003
12. Limited application of AS/NZS 3500.4:2003
Part 3--Compliance assessment
Division 1--Preliminary
13. Application of pt 3
Division 2--Assessing plans
14. General requirements for plans the subject of a compliance request
14A. Additional requirements for plans for regulated work
14B. Additional requirements for plans for greywater use facilities in a sewered area
14C. Additional requirements for plans for greywater use facilities not in a sewered area
14D. Additional requirements for plans for on-site sewerage facilities
15. Certificates for plan given by competent person
16. Requirement for additional documents for particular plans
Division 3--Assessing plumbing and drainage work or on-site sewerage work
17. Definitions for div 3
18. Request for compliance assessment of regulated work or
19. Stages for assessment of regulated work
19A. Stages for assessment of on-site sewerage work
19B. Obligations of responsible person for on-site sewerage work
20. Assessment of stages of work by local government
21. Covering plumbing and drainage or on-site sewerage facility
22. Testing and commissioning plumbing and drainage
23. General requirements for plans for assessed work
23A. Additional requirements for plans for assessed regulated work
23B. Additional requirements for plans for assessed greywater use facilities in a sewered area
23C. Additional requirements for plans for assessed greywater use facilities not in a sewered area
23D. Additional requirements for plans for assessed on-site sewerage work
Division 4--Assessing regulated work or on-site sewerage work in remote areas
24. Application of div 4
25. Meaning of remote area
26. Request for compliance assessment of regulated work or
27. Testing and commissioning plumbing and drainage
28. Plan of completed work
29. Notice of compliance
Part 4--Product certification
30. Certified items to be used
31. Non-certified items allowed for fire service
32. Unsuitable apparatus, fittings, materials and pipes
Part 5--Installations on premises
Division 1--Supply pipes and drains
33. Disconnection of supply pipes and sanitary drains
34. Building supply pipe to water main standard
35. Building sanitary drain to sewerage system standard
Division 2--Backflow prevention devices
36. Installing backflow prevention devices
37. Inspection and testing of backflow prevention devices
38. Testable backflow prevention devices
Division 3--Arrestors
39. Requirements for grease arrestors
40. Connection of appliances and fixtures to grease arrestors
Division 4--Other installations for plumbing
41. Air cooling equipment
42. Engines
43. Fire services
44. Hydraulic powered equipment
45. Water storage tanks
Division 5--Other installations for drainage
46. Bedpan washers and sanitisers
47. Fixtures in basements and cellars
48. Floor type urinals
49. Flushing bowl and pan room sinks
50. Urinal installations
51. Vent pipes to be covered
52. Vents in adjoining buildings
Part 6--Appointment of inspectors
53. Qualifications and experience
Part 7--Miscellaneous provisions
54. Maintenance of existing combined sanitary drains
54A. Notice to water service provider about installation of meters
55. Evidentiary aids
Part 8--Transitional provisions for Plumbing and Drainage Legislation Amendment Regulation (No. 1) 2005
56. Definitions for pt 8
57. Existing requests for compliance assessment of plans for regulated work
58. Existing requests for compliance assessment of regulated work
59. Plumbing and drainage work
SCHEDULE 1 -- APPLIED PROVISIONS
SCHEDULE 1A -- REFERENCES TO PARTS OF QPW CODE
SCHEDULE 2 -- MINOR WORK
SCHEDULE 3 -- UNREGULATED WORK
SCHEDULE 4 -- WORK FOR WHICH APPROVED PERSON MAY GIVE COMPLIANCE REPORTS
SCHEDULE 5 -- LOCAL GOVERNMENTS FOR REMOTE AREAS
SCHEDULE 6 -- DICTIONARY
Endnotes
[Index]
[Search]
[Search this Act]
[Notes]
[Noteup]
[Download]
[Help]