WATER SUPPLY (SAFETY AND RELIABILITY) ACT 2008 - SECT 371C Requirement to prepare flood mitigation manual
WATER SUPPLY (SAFETY AND RELIABILITY) ACT 2008 - SECT 371C
Requirement to prepare flood mitigation manual371C Requirement to prepare flood mitigation manual
The owner of the dam must prepare a flood mitigation manual for the dam under this division and give it to the Minister for approval within 6 months after the dam is prescribed under section 371A (1) .
Penalty—Maximum penalty—1,665 penalty units.