(d) be certified as accurate by a surveyor under the
Surveyors Act 2003.
(4) The operator of the levyable wastedisposal site
must ensure that a copy of the results of the volumetric survey is kept as a
document in hard copy form at the levyable wastedisposal site for 5 years
after the survey is performed.
Penalty—
Maximum penalty—200 penalty
units.
(5) Subsections (6) and (7) apply if the operator of a levyable
wastedisposal site fails to comply with subsection (1) .
(6) The chief
executive may arrange for the volumetric survey to be carried out at the site
and for that purpose may direct an authorised person to enter the site and
carry out the survey.
(7) The chief executive may recover the cost of the
survey from the operator as a debt payable by the operator to the State.