PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 70 Relinquishment must be by blocks or sub-blocks
PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 70
Relinquishment must be by blocks or sub-blocks70 Relinquishment must be by blocks or sub-blocks
(1) A relinquishment under the relinquishment condition—(a) may be by blocks or sub-blocks; and(b) must be of at least 1 block.
(2) However, if a block contains an area that, under section 67 , can not be counted as a relinquishment, subsection (1) (b) is complied with if all of the rest of the land within the block is relinquished.