PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 66 Part usually required to be relinquished
PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 66
Part usually required to be relinquished66 Part usually required to be relinquished
(1) This section is subject to sections 66A , 68 and 69 .
(2) The holder must relinquish 50% of the original notional sub-blocks of the authority to prospect by the end of the relinquishment day.
(3) The sub-blocks required to be relinquished under this section is the
"usual relinquishment" .