PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 468 Criteria for decision
PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 468
Criteria for decision468 Criteria for decision
(1) The Minister may grant the part 5 permission only if satisfied of each of the following—(a) the applicant has given each owner of the land a consultation notice and the applicant has shown that each owner of the land has received the notice;(b) either—(i) the consultation period has ended and the Minister is reasonably satisfied the applicant has made reasonable attempts to consult with each owner of the land; or(ii) before the end of the consultation period each owner of the land has—(A) agreed to the grant of the part 5 permission; or(B) given the applicant permission to enter the land;(c) the applicant has decided the site of the pipeline or facility;(d) it is reasonable to site the pipeline or petroleum facility on the land;(e) the land the subject of the part 5 permission is the minimum area needed for the permission;(f) the granting of the part 5 permission is in the public interest.
(2) In deciding the application any submissions lodged by an owner of the land during the consultation period must be considered.