PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 392AY Proposed geothermal or GHG lease declared a coordinated project
PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 392AY
Proposed geothermal or GHG lease declared a coordinated project392AY Proposed geothermal or GHG lease declared a coordinated project
(1) This section applies for a petroleum lease application if—(a) before the making of the application, a coordinated project was declared; and(b) the project is, or includes, a proposed geothermal lease or GHG lease (the
"proposed lease" ) for land the subject of the application.
(2) The application must not be decided until—(a) if no application is made for the proposed lease within 1 year after the making of the declaration—the end of that year; or(b) if an application is made for the proposed lease within that year—that application is decided.