• Specific Year
    Any

PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 285 Operation of div 3

PETROLEUM AND GAS (PRODUCTION AND SAFETY) ACT 2004 - SECT 285

Operation of div 3

285 Operation of div 3

(1) This division permits, in particular circumstances, the transfer of the following in relation to a petroleum well, water injection bore, water observation bore or water supply bore—
(a) the control of, and responsibility for, the well or bore;
(b) the ownership of any works constructed in connection with the well or bore.
Note—
For the ownership of works mentioned in paragraph (b) generally, see section 542 .
(2) In this division, a
"transfer" of a petroleum well, water injection bore, water observation bore or water supply bore is a reference to a transfer in relation to the well or bore mentioned in subsection (1) .