New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER SHARING PLAN FOR THE WYBONG CREEK WATER SOURCE 2003 - REG 76
Amendment of flow levels, pool protection provisions and TDELs
76 Amendment of flow levels, pool protection provisions and TDELs
(1) The Minister may, under section 45 (1) (b) of the Act and by notice
published in the NSW Government Gazette: (a) vary the very low flow levels,
and the bottom of B class flows established in clause 17, following field
verification,
(b) vary the initial pool control levels and key sites
established in clause 22 (3) (f),
(c) vary the TDEL for any flow class as
specified in clause 46, following a study of water usage and a study of the
connectivity of surface water and groundwater, and/or
(d) vary the
environmental health water specified in clause 22 as a result of any variation
to a TDEL arising from subclause (1) (c).
(2) Any variation made under
subclause (1) (a) should not result in the very low flow class being greater
than 1 ML/day or less than 0.5 ML/day on a falling river.
(3) Any variation
made under subclause (1) (c) should be limited to: (a) for B class, no more
than 60% of the surface flow assessed in subclause (8) at the 50th percentile
flow of all days at the flow reference point, but not less than 4 ML/day,
(b)
for C class, no more than 60% of the surface flow assessed in subclause (8) at
the 30th percentile flow (of all days) at the flow reference point, but not
less than 11.5 ML/day,
(c) for D class a maximum of 6.5 ML/day above the TDEL
for C class, but not less than 20 ML/day, and
(d) for E class a maximum of 50
ML/day, but not less than 37 ML/day.
(4) The Minister should undertake the
field verification in subclause (1) (a) as soon as practical, but before the
review of this Plan under section 43 (2) of the Act.
(5) The Minister should
review the pool control levels and key sites in subclause (1) (b) in
conjunction with the field verification in subclause (4).
(6) The Minister
should cause the studies established in subclause (1) (c) to be undertaken
after at least 3 years of measurement of use, but before the review of this
Plan under section 43 (2) of the Act.
(7) The field verification established
in subclauses (1) (a) and the pool control level review in subclause (1) (b)
should assess: (a) whether the flow level meets the objectives at clause 11
(a) and (b) of this Plan, and
(b) whether the pool control levels and key
sites meet the objectives specified in clauses 11 (a) and (i), and
specifically consider the following: (i) the suitability of the location of
the key sites used in assessing pool health upstream of the site,
(ii) the
drawdown of the water levels within the pools upstream of the key sites during
periods of extraction, and
(iii) the significance of pools that are impacted
by drawdown.
(8) The studies established in subclause (1) (c) shall: (a)
assess whether existing and proposed TDELs meet the objectives specified in
clause 11 (e) and (f), and
(b) specifically determine the assessed surface
flow at the flow reference point by developing the relationship between the
flow reference point flow and daily extracted volumes, including consideration
of the following matters: (i) summation of surface flow and extraction on any
day,
(ii) development of a theoretical flow duration curve for the period of
the study based on the summation of surface flow and extraction,
(iii)
calibration of the theoretical flow duration curve using historical rainfall
data and by using a control site in another water source,
(iv) reassessment
of the river and groundwater connectivity and specifically, review of the
groundwater sustainable yield,
(v) the relationship of river flow at various
sites within this water source for different flow classes, determined by
information from any or all river flow gauging stations, and
(vi) the water
level behaviour of groundwater monitoring bores.
(9) In undertaking the field
verification and studies of water usage and connectivity of surface water and
groundwater in this clause, the Minister should: (a) consult with the NSW
Environment Protection Authority, NSW Fisheries, NSW Agriculture and the NSW
National Parks and Wildlife Service, and
(b) prepare a report documenting:
(i) the methodology adopted,
(ii) the hypotheses tested,
(iii) the field
results and conclusions in terms of the degree to which the objectives in
subclauses (7) and (8) are met,
(iv) the flow levels, pool control levels and
key sites and TDELs recommended to meet the objectives, and
(v) the
socio-economic impacts of recommended changes to the flow levels, pool control
levels and key sites, and changes to TDELs.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]