New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER SHARING PLAN FOR THE TOMAGO TOMAREE STOCKTON GROUNDWATER SOURCES 2003 - REG 38
Protection of groundwater dependent ecosystems
38 Protection of groundwater dependent ecosystems
(1) Extraction of groundwater from a new or replacement water supply work
(bore), except for a replacement water supply work (bore) that is part of a
bore network, is excluded within 40 metres of high priority groundwater
dependent ecosystems, or any river.
(2) The location and rate of extraction
from a new or replacement water supply work (bore) outside of high priority
groundwater dependent ecosystems, except for a replacement water supply work
(bore) that is part of a bore network, shall be such that there is negligible
drawdown at the outside edge of the 40 metre buffer zone as determined by the
Minister.
(3) High priority groundwater dependent ecosystems include the
following, as shown in Schedule 5: (a) swamp forest,
(b) swamp
heath-woodland, and
(c) wetlands, including those that provide habitat for
threatened species, such as Litoria aurea.
(4) Pursuant to section 45 (1) (b)
of the Act, the Minister may identify further high priority groundwater
dependent ecosystems and include them in Schedule 5 after July 1 2008 based on
further studies of groundwater ecosystem dependency undertaken by the
Minister.
(5) The Minister should consult with the Minister for the
Environment before adding further high priority groundwater dependent
ecosystems to Schedule 5.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]