New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER SHARING PLAN FOR THE NSW GREAT ARTESIAN BASIN GROUNDWATER SOURCES 2008 - REG 15
Planned environmental water
15 Planned environmental water
(1) Planned environmental water in the Eastern Recharge and the Southern
Recharge Groundwater Sources is as follows: (a) the long-term average storage
component of the respective groundwater source,
(b) plus 30% of the long-term
average annual net recharge to the respective groundwater source.
(2) Planned
environmental water in the Surat, Warrego and Central Groundwater Sources is:
(a) sustainable pressure estimate equivalant,
(b) minus the increased
extraction from 1990 until the commencement of this Plan,
(c) plus the water
savings made through the capping and piping of any water bores from 1990 to 30
June 1999,
(d) plus 70% of the water savings made through the capping and
piping of any water bores from 1 July 1999.
(3) The Minister may vary the
proportion of long-term average annual net recharge and/or the percentage of
water savings made available through the capping and piping of any water bores
that is reserved as planned environmental water in subclause (1) and (2) after
year 5 of this Plan, based on further studies of groundwater ecosystem
dependency, acceptable to the Minister. The extent of any variation will be
determined by the Minister after considering the needs of the environment and
socio-economic impacts of the proposed variation.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]