New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER SHARING PLAN FOR THE MURRUMBIDGEE REGULATED RIVER WATER SOURCE 2003 - REG 14
Planned environmental water
14 Planned environmental water
(1) This Plan establishes the following planned environmental water rules: (a)
water volume in excess of the long-term extraction limit established in clause
32 of this Plan may not be taken from this water source and used for any
purpose, and
(b) access to water is to be managed as specified in clause 34
of this Plan to ensure water volume in excess of the long-term extraction
limit is not being taken.
Note: At the time of gazettal, it is estimated that
long-term extractions at the commencement of this Plan will be limited to
around 1,925,000 megalitres per year. By doing this, this Plan will ensure
that approximately 56% of the long-term average annual flow in this water
source (estimated to be 4,360,000 megalitres per year) will be preserved and
contribute to the maintenance of basic ecosystem health.
Note: At the time of
gazettal, it is estimated that long term extractions after the 5 th year of
this Plan will be limited to around 1,890,000 megalitres per year. By doing
this, this Plan will ensure that approximately 57% of the long-term average
annual flow in this water source (estimated to be 4,360,000 megalitres per
year) will be preserved and contribute to the maintenance of basic ecosystem
health.
(2) Until 1 July 2008 a minimum daily flow of 200 megalitres per day
shall be maintained in the Murrumbidgee River at Balranald, when the sum of
available water determinations to regulated river (general security) access
licences plus water allocations carried over in water allocation accounts, is
less than 80% of share components, which cannot be used to meet access licence
water requirements or basic landholder rights requirements below Balranald.
(3) Until 1 July 2008 a minimum daily flow of 300 megalitres per day shall be
maintained in the Murrumbidgee River at Balranald, when the sum of available
water determinations to regulated river (general security) access licences
plus water allocations carried over in water allocation accounts, is equal to
or greater than 80% of share components, which cannot be used to meet access
licence water requirements or basic landholder rights requirements below
Balranald.
(4) From 1 July 2008 a minimum daily flow shall be maintained in
the Murrumbidgee River at Balranald, throughout the water year, which cannot
be used to meet access licence water requirements or basic landholder rights
requirements below Balranald and is calculated using the following formula:
"95th percentile natural daily flow"
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]