New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER SHARING PLAN FOR THE LOWER MURRUMBIDGEE GROUNDWATER SOURCES 2003 - REG 38
Protection of groundwater dependent ecosystems
38 Protection of groundwater dependent ecosystems
(1) High priority groundwater dependent ecosystems are listed in Schedule 4.
(2) Pursuant to section 45 (1) (b) of the Act, the Minister may identify
further high priority groundwater dependent ecosystems and include them in
Schedule 4 after 30 June 2011, based on further studies of groundwater
ecosystem dependency undertaken by the Minister.
(3) The Minister should
consult with the Minister for the Environment before adding further high
priority groundwater dependent ecosystems to Schedule 4.
(4) Extraction of
groundwater from a new or replacement water supply work (bore) is excluded
within 200 metres of designated high priority groundwater dependent
ecosystems, or any creek or river, for those exercising basic landholder
rights, and 1,000 metres for extraction authorised by all other access
licences, unless the water supply work (bore): (a) only draws water from an
aquifer at depths as approved by the Minister, and
(b) has an impermeable
seal constructed within the annulus of the bore to isolate aquifers preventing
water ingress from the restricted aquifer, as specified by the Minister.
(5)
Subclause (4) will not apply to extraction from an existing water supply work
(bore) until such time as the work is replaced.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]