New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER SHARING PLAN FOR THE GWYDIR REGULATED RIVER WATER SOURCE 2002 - REG 63
Dam operation during floods and spills
63 Dam operation during floods and spills
(1) The operation of Copeton Dam during times of flood and spilling of water
is to be undertaken in a manner that maintains the safety of dam
infrastructure.
(2) Providing it is consistent with subclause (1), operation
: (a) should leave the storage at full supply level at the completion of the
flood or spilling of water,
(b) during floods should ensure the general rate
of increase of outflow does not exceed the rate of increase of inflow,
(c)
should aim to lessen downstream flood damage where possible, and
(d) may
involve temporary storage of water above the normal maximum available storage
level to reduce flood effects, and management of the rate of release of this
water to avoid aggravating downstream flood damage.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]