• Specific Year
    Any

WATER SHARING PLAN FOR THE GREATER METROPOLITAN REGION UNREGULATED RIVER WATER SOURCES 2011 - REG 34 Environmental flow releases in the Hawkesbury and Lower Nepean Rivers Water Source

WATER SHARING PLAN FOR THE GREATER METROPOLITAN REGION UNREGULATED RIVER WATER SOURCES 2011 - REG 34

Environmental flow releases in the Hawkesbury and Lower Nepean Rivers Water Source

34 Environmental flow releases in the Hawkesbury and Lower Nepean Rivers Water Source

(1) Subject to subclause (8), a daily release of water must be made from Menangle Weir in the Menangle Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7) plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.9 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.9 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Menangle Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.8 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.8 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Menangle Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(2) Subject to subclause (8), a daily release of water must be made from Camden Weir in the Camden Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7), plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.878 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.878 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Camden Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.761 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.761 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Camden Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(3) Subject to subclause (8), a daily release of water must be made from Sharpes Weir in the Sharpes Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7), plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.871 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.871 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Sharpes Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.748 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.748 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Sharpes Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(4) Subject to subclause (8), a daily release of water must be made from Cobbity Weir in the Cobbity Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7), plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.863 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.863 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Cobbity Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.734 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.734 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Cobbity Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(5) Subject to subclause (8), a daily release of water must be made from Mount Hunter Rivulet Weir in the Mount Hunter Rivulet Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7), plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.858 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.858 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Mount Hunter Rivulet Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.726 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.726 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Mount Hunter Rivulet Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(6) Subject to subclause (8), a daily release of water must be made from Brownlow Hill Weir in the Brownlow Hill Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7), plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.856 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.856 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Brownlow Hill Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.721 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.721 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Brownlow Hill Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(7) Subject to subclause (8), a daily release of water must be made from Theresa Park Weir in the Theresa Park Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7), plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.837 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.837 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Theresa Park Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.687 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.687 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Theresa Park Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(8) Daily releases of water under subclauses (1)-(7) are not required to be made for the respective weir when:
(a) the release requirements cannot be met due to an emergency situation at that weir or an upstream weir and the holder of the water supply work approval notifies the Minister in writing within 7 days of becoming aware of the emergency,
(b) the Minister is satisfied that the release requirements cannot be met due to water supply work capacity constraints or necessary maintenance, refurbishment or modification work, at that weir or an upstream weir, that has the potential to temporarily affect the flow rate or behaviour of water for a period of more than 24 hours and has granted permission in writing,
(c) the Minister requires an alternate release to be made due to an emergency situation or a maintenance activity at that weir or an upstream weir and has notified this in writing,
(d) the stage of the weir is less than the stage necessary to deliver the required environmental release at that weir or an upstream weir over the 24-hour period, or
(e) the respective weir is spilling at a rate that equals or exceeds the respective release requirement specified in subclause (1)-(7), or
(f) from Years 1 to 5 of this Plan, the release requirements cannot reasonably be met despite the best endeavours of the holder of the water supply work approval to meet them.
(9) Subject to subclause (10), a daily release of water must be made from Wallacia Weir in the Wallacia Weir Management Zone in the Hawkesbury and Lower Nepean River Water Source which is equal to the volume of water released in the prior 24-hour period from Pheasants Nest Weir under clause 32 (7), plus the volume of water released in the prior 24-hour period from Broughtons Pass Weir under clause 32 (8), multiplied by:
(a) 1 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are greater than the 80 th percentile of the total daily inflows to those dams,
(b) 0.810 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams, or
Note : The factor 0.810 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Wallacia Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 80 th percentile and greater than the 95 th percentile of the total daily inflows to those dams.
(c) 0.640 when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
Note : The factor 0.640 in the paragraph above accounts for the current best estimate of the natural transmission loss that occurs between Pheasants Nest Weir and Broughtons Pass Weir and the Wallacia Weir Management Zone flow reference point when the total daily inflows to Cataract Dam, Cordeaux Dam, Avon Dam and Nepean Dam are equal to or less than the 95 th percentile of the total daily inflows to those dams.
(10) Daily releases of water under subclause (9) are not required to be made when:
(a) the release requirements cannot be met due to an emergency situation at that weir or an upstream weir and the holder of the water supply work approval notifies the Minister in writing within 7 days of becoming aware of the emergency,
(b) the Minister is satisfied that the release requirements cannot be met due to water supply work capacity constraints or necessary maintenance, refurbishment or modification work, at that weir or an upstream weir, that has the potential to temporarily affect the flow rate or behaviour of water for a period of more than 24 hours and has granted permission in writing,
(c) the Minister requires an alternate release to be made due to an emergency situation or a maintenance activity at that weir or an upstream weir and has notified this in writing,
(d) the stage of the weir is less than the stage necessary to deliver the required environmental release at that weir or an upstream weir over the 24-hour period, or
(e) Wallacia Weir is spilling at a rate that equals or exceeds the applicable release requirement specified in subclause (9), or
(f) from Years 1 to 5 of this Plan, the release requirements cannot reasonably be met despite the best endeavours of the holder of the water supply work approval to meet them.
(11) If the Minister determines that any of the release requirements specified in this clause cannot reasonably be met despite the best endeavours of the holder of the water supply work approval to meet them, the Minister is to conduct a review by the end of Year 5 of this Plan of the factors that prevent the release requirements from being met and the ways in which those factors can be addressed, for the purposes of determining how those those factors should be addressed, whether the system operation rules specified in this clause should be amended and/or whether the water supply works specified in this clause require modification in order to pass the required releases.