WATER SHARING PLAN FOR THE DORRIGO PLATEAU SURFACE WATER SOURCE AND DORRIGO BASALT GROUNDWATER SOURCE 2003 - REG 73
Very low flow access conditions in the surface water source
73 Very low flow access conditions in the surface water source
(1) Notwithstanding any cease to pump conditions established on the licence,
during periods of very low flows, holders of access licences in the surface
water source listed on Schedule 6 may continue to access water to comply with
the requirements of the Food Production (Safety) Act or the Prevention of
Cruelty to Animals Act for the following purposes: (a) fruit and vegetable
washing,
(b) cleaning of dairy plant and equipment for the purpose of
hygiene,
(c) poultry watering and misting, and
(d) cleaning of enclosures
used for intensive animal production for the purposes of hygiene.
(2) The
maximum daily volume that can extracted under subclause (1) will be the
minimum required to satisfy the purposes in that subclause, will be
individually assessed and specified on each access licence within 12 months of
the commencement of this Plan, will not exceed 20 kilolitres per day, and will
not be increased.
(3) Upon written request by the holder of an access
licence, the Minister may add a licence to Schedule 6, but only if the licence
meets the purpose requirements established in subclause (1), and the purpose
existed prior to 1 July 2004.
(4) A licence will be removed from the Schedule
if: (a) any access licence dealing results in the water being extracted from a
different location,
(b) an alternative water supply is obtained, that
satisfies the requirements of subclause (1), or
(c) the licence is
surrendered, cancelled, or not renewed.
(5) Notwithstanding subclauses (1) to
(4), extraction of water by an approved water supply work in the surface water
source is only permitted if there is visible flow in the river in the vicinity
of the work.
(6) An assessment of the continuing requirements for access
under this clause will be undertaken before the end of the Plan, and the
Schedule amended or deleted at the end of the Plan, if such a review
determines that this concessional access is no longer required.
(7) The
assessment made under subclause (6) will be undertaken for the Plan as a
whole, and for each individual licence on the Schedule.