WENTWORTH LOCAL ENVIRONMENTAL PLAN 1993 - REG 27
Dwelling setback along river
27 Dwelling setback along river
(1) The aim of this clause is to ensure dwellings are setback far enough from
a river: (a) to protect water quality by reducing nutrient accessions to the
river,
(b) to protect the river bank from erosion by retaining native
vegetation,
(c) to screen dwellings from view from the river while allowing
water views from dwellings,
(d) to minimise disturbance to wildlife and
aquatic habitat.
(2) State Environmental Planning Policy No 1-Development
Standards may not be used to vary setbacks under this clause.
(3) The setback
must be measured from the pool level of the river.
(4) The minimum setback on
land within Zone No 1 (c) is shown as a line on the map.
(5) The minimum
setback on land within Zone No 1 (a), 1 (d) or 2 (v) is 30 metres.
(6) The
Council may consent to the erection of a dwelling which is setback between 30
and 100 metres from pool level on land within Zone No 1 (a) or 1 (d) but only
if the Council is satisfied the development furthers the aim of this clause.
In satisfying itself, the Council may consult any relevant public authority
and take into account its advice and may consider any relevant plan, study or
work and take it into account.
(7) Subclause (6) applies to the erection of a
dwelling on land within Zone No 1 (a) even though it is setback more than 100
metres from the river, if (in the opinion of the Council) the use of the
dwelling may contribute nutrient to the river.
(8) The Council must not
consent to the erection of a dwelling within 100 metres of a river unless it
has considered a plan that shows how the site will be landscaped.
(9)
Subclauses (4) and (5) do not apply to the erection of a single dwelling on
each of Lots 1-5, Section 27, DP 758456, Parish of Gol Gol and County of
Wentworth, if the development is carried out in accordance with the
requirements set out in the final report prepared for the Council titled
Floodplain Management Plan Gol Gol to Abbotsford Bridge , dated May 1995,
deposited in the office of the Council.