WATER INDUSTRY COMPETITION (GENERAL) REGULATION 2008 - REG 19B
Phasing-in of requirements relating to infrastructure formerly exempt under clause 7 or 13 of Schedule 3
19B Phasing-in of requirements relating to infrastructure formerly exempt
under clause 7 or 13 of Schedule 3
(1) This clause applies to: (a) water industry infrastructure referred to in
clause 7 (a) of Schedule 3 that has been able to be connected to water
industry infrastructure operated by a public water utility for more than one
year, and
(b) water infrastructure referred to in clause 13 (a) of Schedule
3, that has been able to be connected to water infrastructure operated by a
public water utility for more than one year.
(2) In their application to such
infrastructure: (a) clauses 6 (1) and 7 (1) of Schedule 1 are to be construed
as if the words “Before commencing to operate water infrastructure
commercially” were replaced by the words “Within 6 months after being
granted a network operator’s licence for water infrastructure”, and
(b)
clauses 13 (1) and 14 (1) of Schedule 1 are to be construed as if the words
“Before commencing to operate sewerage infrastructure commercially” were
replaced by the words “Within 6 months after being granted a network
operator’s licence for sewerage infrastructure”.