New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WOLLONGONG CITY CENTRE LOCAL ENVIRONMENTAL PLAN 2007 - REG 33A
Development on flood prone land
33A Development on flood prone land
(1) The objectives of this clause are:
(a) to maintain the existing flood regime and flow conveyance capacity, and
(b) to enable safe occupation of flood prone land, and
(c) to avoid
significant adverse impacts upon flood behaviour, and
(d) to avoid
significant adverse effects on the floodplain environment that would cause
avoidable erosion, siltation, destruction of riparian vegetation or a
reduction in the stability of the river bank or watercourse, and
(e) to limit
uses to those compatible with flow conveyance function and flood hazard.
(2)
Before determining an application for consent to carry out development on
flood prone land, the consent authority must consider: (a) the impact of that
development on: (i) flood behaviour, including the flood peak at any point
upstream or downstream of the site of the development, and
(ii) the flow of
floodwater on adjoining lands, and
(iii) the flood hazard or risk of flood
damage to property and persons, and
(iv) erosion, siltation or destruction of
riparian vegetation in the area, and
(v) the water table on any adjoining
land, and
(vi) riverbank stability, and
(vii) the safety in time of flood of
the site of the development and of any buildings or works intended to be
erected or carried out, and
(viii) the hydraulic capacity of flood prone land
in the locality, and
(ix) the provision of emergency equipment, personnel,
welfare facilities or other resources that might be needed for an evacuation
resulting from flooding, and
(x) the risk to life and personal safety of any
emergency service and rescue personnel who might be involved in any such
evacuation, and
(xi) the cumulative impact of further development on
flooding, and
(xii) the potential for pollution during flooding, and
(b) the
impact that flooding will have on the proposed development, including the
flood liability of access to the site of the proposed development, and
(c)
the provisions of any floodplain management plan adopted by the Council that
apply to the land.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]