STATE ENVIRONMENTAL PLANNING POLICY (MINING, PETROLEUM PRODUCTION AND EXTRACTIVE INDUSTRIES) 2007
- Made under the Environmental Planning and Assessment Act 1979
- As at 26 June 2020
- Reg 65 of 2007
Table of Provisions
PART 1 - PRELIMINARY
- 1 Name of Policy
- 2 Aims of Policy
- 3 Interpretation
- 3A Consent authority
- 3B Interpretation--references to named land use zones and equivalent land use zones
- 4 Land to which Policy applies
- 5 Relationship with other environmental planning instruments
- 5A Maps
PART 2 - PERMISSIBLE DEVELOPMENT
- 6 Development permissible without consent
- 7 Development permissible with consent
- 8 Determination of permissibility under local environmental plans
- 9 Prohibited development
- 9A Coal seam gas development prohibited in certain exclusion zones
- 10 Exempt development
- 10A Additional exempt development for land that is not within an environmentally sensitive area of State significance
- 11 Complying development
PART 3 - DEVELOPMENT APPLICATIONS--MATTERS FOR CONSIDERATION
12AA. (Repealed)
- 12AB Non-discretionary development standards for mining
- 12 Compatibility of proposed mine, petroleum production or extractive industry with other land uses
- 12A Consideration of voluntary land acquisition and mitigation policy
- 13 Compatibility of proposed development with mining, petroleum production or extractive industry
- 14 Natural resource management and environmental management
- 15 Resource recovery
- 16 Transport
- 17 Rehabilitation
PART 4AA - MINING AND PETROLEUM DEVELOPMENT ON STRATEGIC AGRICULTURAL LAND
Division 1 - Preliminary
- 17A Meaning of "mining or petroleum development"
Division 2 - Development applications
Note
- 17B Assessment of development applications
Division 3 - Site verification certificates
Note
- 17C Site verification certificates--biophysical strategic agricultural land
- 17D Applications for site verification certificates
- 17E Notification of applications for and issue of site verification certificates
Division 4 - Gateway certificates
Note
- 17F Applications for gateway certificates
- 17G Referral of applications
- 17H Determination of applications
- 17I Time for determination of applications
- 17J Gateway Panel may request further information before determining application
- 17K Duration of gateway certificates
- 17L Amendment of gateway certificates
- 17M Notification of gateway certificates
Division 5 - Gateway Panel
- 17N Constitution of Gateway Panel
- 17O Functions of Gateway Panel
- 17P Members of Gateway Panel
- 17Q Constitution of Gateway Panel for particular matters
- 17R Term and other conditions of office
- 17S Pecuniary interests
- 17T Procedure at meetings
- 17U Quorum
PART 4 - MISCELLANEOUS
- 18 Receipt and disposal of waste
- 18A Designated development
- 19 Savings and transitional--general
- 20 Savings and transitional--coal seam gas development in certain exclusion zones
- 20A SEPP to be reviewed by Minister
- 21 Savings and transitional--mining and petroleum development on strategic agricultural land
- 22 Savings and transitional--Jerrys Plains open cut mining prohibition
- 23 Savings and transitional--air and noise impacts
- 24 Savings and transitional--Gateway certificates