New South Wales Consolidated RegulationsThe standards specified for that development are that the development must:
(a) be carried out within 6 months of the declaration being made, and
(b) not change the configuration of the floor space of the building or structure being repaired, and
(c) not increase the floor space of the building or structure being repaired, and
(d) be to make the building or structure weatherproof and, if a dwelling, suitable for habitation.