New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
OCCUPATIONAL HEALTH AND SAFETY REGULATION 2001 - REG 259
Particular risk control measures
259 Particular risk control measures
(1) An employer must ensure that
asbestos work is carried out, in a manner appropriate to that work, in
accordance with the following documents published by the NOHS Commission, as
in force from time to time: (a) Code of Practice for the Management and
Control of Asbestos in the Workplace[NOHSC: 2018 (2005)] ,
(b) Code of
Practice for the Safe Removal of Asbestos[NOHSC: 2002 (2005)] .
(If a
requirement of clause 51 (Atmospheric contaminants-particular risk control
measures) is inconsistent with a requirement of this subclause, the clause 51
requirement prevails).
(2) An employer must ensure that: (a) employees and
other persons contracted to carry out asbestos work are informed of the
dangers involved and of any precautions that should be taken in connection
with the work, and
(b) employees, workplace owners and plant owners are
informed when asbestos work is being carried out, and
(c) persons are warned,
by the use of signs, labels or other similar measures, of the presence of
asbestos or asbestos-containing material in a place at which construction work
is being carried out.
(3) An employer must identify, and implement, measures
to prevent the uncontrolled disturbance of asbestos-containing material while
construction work is being carried out.
(4) An employer must ensure that
procedures are in place for: (a) the cleaning of premises at which asbestos
work is carried out, and
(b) the laundering and cleaning of personal
protective equipment used for asbestos work, and
(c) the containment of
asbestos waste, and
(d) the disposal of asbestos and asbestos-containing
material.
(5) An employer must ensure that no asbestos-containing material,
including asbestos cement, is reused in connection with the carrying out of
construction work.
(6) An employer must ensure that no high-pressure
processes are used to clean the surface of asbestos-containing material,
including asbestos cement or any structures that consist of or contain
asbestos, during the carrying out of construction work.
Maximum penalty:
Level 4.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]