GOULBURN MULWAREE LOCAL ENVIRONMENTAL PLAN 2009 - REG 7.1
Flood planning land
7.1 Flood planning land
(1) The objectives of this clause are as follows:
(a) to maintain the existing flood regime and flow conveyance capacity,
(b)
to enable safe occupation and evacuation of land subject to flooding,
(c) to
avoid significant adverse impacts on flood behaviour,
(d) to avoid
significant effects on the environment that would cause avoidable erosion,
siltation, destruction of riparian vegetation or a reduction in the stability
of river banks or watercourses,
(e) to limit uses to those compatible with
flow conveyance function and flood hazard.
(2) This clause applies to land
shown as “flood planning land” on the Flood Planning Land Map .
(3)
Development consent is required for any development on land to which this
clause applies.
(4) Development consent must not be granted for development
on land to which this clause applies unless the consent authority is satisfied
that the development will not: (a) adversely affect flood behaviour resulting
in detrimental increases in the potential flood affectation of other
development or properties, or
(b) significantly alter flow distributions and
velocities to the detriment of other properties or the environment of the
floodplain, or
(c) affect the safe occupation or evacuation of the land, or
(d) significantly detrimentally affect the floodplain environment or cause
avoidable erosion, siltation, destruction of riparian vegetation or a
reduction in the stability of river banks or watercourses, or
(e) be likely
to result in unsustainable social and economic costs to the community as a
consequence of flooding, or
(f) if located in a floodway: (i) be incompatible
with the flow conveyance function of the floodway, or
(ii) cause or increase
a flood hazard in the floodway.