New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
ELECTRICITY SUPPLY (SAFETY AND NETWORK MANAGEMENT) REGULATION 2008 - REG 9
Chapter 1 of plan-network safety and reliability
9 Chapter 1 of plan-network safety and reliability
(1) The object of chapter 1 of a network management plan is to ensure that the
transmission system or distribution system to which it relates provides an
adequate, reliable and safe supply of electricity of appropriate quality.
(2)
Chapter 1 of a plan must include (but is not limited to) the following: (a) a
commitment by the network operator to ensuring the safe operation of its
transmission or distribution system, and to giving safety the highest priority
over all other aspects of network management,
(b) a description of the
transmission or distribution system and its design, construction, operation
and maintenance,
(c) a description of the planning process employed for the
purpose of assessing the adequacy of the transmission or distribution system
and the need for development of the transmission or distribution system,
including if appropriate: (i) demand management methodologies, and
(ii)
system reliability planning standards on a customer class or group, or
geographic basis, for each distinct voltage level,
(d) a description of the
asset management strategies employed for the purposes of the design,
construction, operation and maintenance of the transmission or distribution
system, including: (i) risk management and public liability insurance
arrangements, and
(ii) planned customer technical service standards for
quality and reliability of supply,
(e) a description of the safety management
strategy employed for the purpose of ensuring the safe operation of the
transmission or distribution system, including: (i) an analysis of hazardous
events, and
(ii) the procedures to be implemented in the event of an
emergency, and
(iii) the procedures and standards designed to ensure that the
network operator’s employees, contractors to the network operator and their
employees and any other persons working on or near the system’s electricity
works have the competencies required to undertake the work safely, and
(iv) a
strategy to ensure adherence to safe working procedures,
(f) if the network
operator is a distribution network service provider, references to documents
outlining the strategies employed to ensure compliance with licence conditions
relating to the design, reliability and performance criteria of the
distribution network,
(g) a description of the plan’s objectives and of
appropriate performance indicators,
(h) a description of the reports to be
made to the Director-General in relation to the management and performance of
the transmission or distribution system (
"the schedule of reports"),
(i) a description of the codes, standards and
guidelines that the network operator intends to follow in the design,
installation, operation and maintenance of the transmission or distribution
system.
(3) Chapter 1 of a plan must comply with Schedule 1.
(4)
The schedule of reports must include such reports in relation to the
management and performance of the network operator’s transmission or
distribution system as the Director-General, by notice in writing to the
network operator, directs to be included.
(5) A network operator must lodge
with the Director-General, in accordance with the plan, the reports specified
in the schedule of reports.
Maximum penalty: 100 penalty units (in the case
of a corporation) and 25 penalty units (in any other case).
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]