New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
ELECTRICITY SUPPLY (SAFETY AND NETWORK MANAGEMENT) REGULATION 2008 - REG 15
Plan to be audited
15 Plan to be audited
(1) A network operator must ensure that its plan is audited in accordance with
this Regulation at such times as the Director-General may specify by notice in
writing to the network operator.
(2) A network operator must lodge with the
Director-General a report prepared by the auditor in relation to that audit,
as soon as practicable after the completion of the audit or within such other
time as may be specified by the Director-General by notice in writing to the
network operator.
Maximum penalty: 100 penalty units (in the case of a
corporation) and 25 penalty units in any other case.
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]