ELECTRICITY SUPPLY (SAFETY AND NETWORK MANAGEMENT) REGULATION 2008 - REG 14

Network operators to review plans

14 Network operators to review plans

(1) A network operator is to review and, if necessary, revise its network management plan:
(a) as soon as practicable after any significant change (including any significant incremental change) occurs in relation to the operation or maintenance of the electricity network, and
(b) in any case, at least once every 2 years (starting from the date of lodgment of the network management plan under clause 8).
Maximum penalty: 100 penalty units (in the case of a corporation) and 25 penalty units (in any other case).
(2) For the purposes of subclause (1) (a), a significant change includes (but is not limited to):
(a) any upgrade or modification in the engineering design of the electricity network, and
(b) any other change in the risks to be managed by the network operator in relation to the electricity network or in relation to the measures to be taken to manage such risks.