CANADA BAY LOCAL ENVIRONMENTAL PLAN 2008 - REG 6.1

Acid sulfate soils

6.1 Acid sulfate soils

(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works, except as provided by this clause.

Class of land Works
1 Any works.
2 Works below the natural ground surface.
Works by which the watertable is likely to be lowered.
3 Works more than 1 metre below the natural ground surface.
Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface.
4 Works more than 2 metres below the natural ground surface.
Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface.
5 Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land.
(3) Development consent must not be granted under this clause for the carrying out of works unless:
(a) an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority, and
(b) a copy of the plan and a copy of the development application have been provided to the Director-General of the Department of Environment and Climate Change and the consent authority has considered any comments of the Director-General made within 21 days after those copies were provided to the Director-General.
(4) Development consent is not required under this clause for the carrying out of works if:
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan need not be carried out for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Also, development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power):
(a) emergency work, being the repair or replacement of the works of the public authority required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine management work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Development consent is not required under this clause to carry out any works unless:
(a) the works involve the disturbance of more than 1 tonne of soil, such as occurs in carrying out agriculture, the construction or maintenance of drains, extractive industries, dredging, the construction of artificial water bodies (including canals, dams and detention basins) or foundations or flood mitigation works, or
(b) the works are likely to lower the watertable.