(b) all
conditions of the planning approval that are required to be complied with
before a strata certificate may be issued have been complied with, and
(ii) each proposed lot in the plan substantially
corresponds with a part of any such building shown in the building plans
accompanying the construction certificate and is designated in the building
plans as being intended for separate occupation,
(iii) each building referred
to in subparagraph (i) was completed not more than 12 months, or a longer
period fixed by the relevant local council in any particular case, before the
application for the strata certificate was made,
(v) any
consent required under that Act or instrument has been given in relation to
the separate occupation of the proposed lots,
(vi) the land proposed to be
subdivided is not the subject of an outstanding order, requirement or notice,
(vii) if an order of the kind referred to in item 6 of the table to section
121B of the Environmental Planning and Assessment Act 1979 is in force in
relation to the land proposed to be subdivided--the order has been complied
with.