• Specific Year
    Any

ENERGY AND UTILITIES ADMINISTRATION ACT 1987 - SECT 34R Contents of draft savings action plans

ENERGY AND UTILITIES ADMINISTRATION ACT 1987 - SECT 34R

Contents of draft savings action plans

34R Contents of draft savings action plans

(1) A draft water savings action plan must include the following--
(a) a description of the designated water user's current water usage,
(b) a list of individual water savings measures prioritised in terms of water saved, cost effectiveness and potential benefits,
(c) a statement concerning the water savings measures included on that list that the designated water user proposes to implement in the 4-year period following approval of the action plan (including initial set up costs and annual costs for each measure and time frames for implementation),
(d) any other matter prescribed by a savings order.
(2) A draft energy savings action plan must include the following--
(a) a description of the designated energy user's current energy usage,
(b) a list of individual energy savings measures prioritised in terms of energy saved, cost effectiveness and potential benefits,
(c) a statement concerning the energy savings measures included on that list that the designated energy user proposes to implement in the 4-year period following approval of the action plan (including initial set up costs and annual costs for each measure and time frames for implementation),
(d) any other matter prescribed by a savings order.
(3) A draft savings action plan must be prepared in accordance with such guidelines concerning the preparation of savings action plans as may be issued by the Minister from time to time and published in the Gazette.