New South Wales Consolidated ActsFor the purposes of section 15D, the Roads and Traffic Authority may use the part of the revested land shown as “Pump station” on Sheet 1 of the plan for the following purposes:
(a) the maintenance, repair, removal or replacement of a pump station for the purposes of the Eastern Distributor,
(b) the laying, maintenance, repair, removal or replacement of pipes and other connections between the pump station and underground drainage systems, between the pump station and the Eastern Distributor, and between the pump station and detention basins,
(c) the laying, maintenance, repair, removal or replacement of service connections for the purposes of the pump station,
(d) carrying out inspections of works on the land,
(e) cleaning any works, buildings or other structures on the land,
(f) any purpose ancillary to a purpose specified in paragraphs (a)-(e).