For this Part, a program management plan must include at least the following:
- (a)
- a description of the holder's or applicant's strategies for operating the
relevant launch facility and relevant launch vehicles using the launch
facility;
- (b)
- a description of the holder's or applicant's practices and procedures to
control the operation of the launch facility and the launch vehicles and a
description of the arrangements for reporting on their operation;
- (c)
- a description of the quality assurance plan or plans covering the
operation of the launch facility and the launch vehicles and, if the launch
facility is not yet constructed, the construction of the launch facility;
- (d)
- a description of the system for maintaining documents and records relating
to the operation of the launch facility and the launch vehicles;
(e) a description of the arrangements for the maintenance and servicing of the
launch facility and the launch vehicles, including:
- (i)
- a description of the
system for recording scheduled and unscheduled maintenance that is carried out
on the launch facility and the launch vehicles; and
- (ii)
- the procedures for reporting on failures, malfunctions or defects in the
launch facility and the launch vehicles;
(f) a description of how the holder or applicant conducts, or proposes to
conduct, the launch activities:
- (i)
- so as to reduce risks to third parties
to a level that is as low as is reasonably possible; and
- (ii)
- so as to satisfy the launch safety standards set out in the Flight Safety
Code;
- (g)
- a description of any additional arrangements of the holder or applicant to
enhance the safety of the launch activities.