Commonwealth Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Download] [Help]

RENEWABLE ENERGY (ELECTRICITY) REGULATIONS 2001 - NOTES

- made under the Renewable Energy (Electricity) Act 2000

Statutory Rules 2001 No. 2 as amended

This compilation was prepared on 2 April 2012
taking into account amendments up to SLI 2012 No. 33

Prepared by the Office of Legislative Drafting and Publishing,
Attorney-General's Department, Canberra


Contents

Part 1                           Preliminary                                                                 

                        1       Name of Regulations [see Note 1]                                  12

                        2       Commencement [see Note 1]                                         12

                        3       Definitions                                                                    12

                      3A       Conditions for solar water heater                                    15

                      3B       Definition of auxiliary loss                                              16

Part 2                           Renewable energy certificates                             

Division 2.1                  Accreditation                                                                  

                      3S       Final day for including eligible WCMG in application       17

                        4       Eligibility for accreditation                                             17

                        5       1997 eligible renewable power baselines                         17

                      5A       2008 WCMG limit                                                           18

Division 2.2                  Eligible renewable energy sources                                 

                        6       Meaning of certain energy sources that are eligible renewable energy sources (Act s 17)        19

                        7       Meaning of certain energy sources that are not eligible renewable energy sources (Act s 17)  19

                        8       Meaning of wood waste                                                 20

                        9       Energy crops (Act s 17)                                                 21

                       10       Special requirements -- ocean, wave and tide                21

Division 2.2A               Eligible WCMG                                                               

                    10A       Eligible WCMG starting day                                           21

                    10B       Meaning of waste coal mine gas                                     22

                    10C       Limitations on eligible WCMG                                        22

Division 2.3                  Eligible electricity generation                                         

Subdivision 2.3.1          Accredited power stations                                                                  

                       13       Working out electricity generation for a power station      22

                       14       General formula                                                             23

                       15       Ineligible fuel component                                               24

                    15A       Electricity omitted from calculation                                 24

                       16       Supplementary generation                                             24

                       18       Electricity generation returns for accredited power stations (Act s 20)            25

Subdivision 2.3.2          Solar water heaters                                                                              

                       19       Creation of certificates for solar water heaters (Act s 21) 26

                    19A       Number of certificates                                                   27

                    19B       Determination of method for determining number of certificates       28

                  19BA       Determination of number of certificates                          29

                  19BB       Variation of determination                                              30

                  19BC       Requests for determination                                            31

                  19BD       Invitation for requests for determination                          32

                    19C       Register of solar water heaters (Act s 23AA)                   32

Subdivision 2.3.3          Small generation units                                                                         

                    19D       Creation of certificates for small generation units (Act s 23A)            33

                    19E       Conditions for creation of certificates                             34

                     19F       Certain costs to be included in purchase and installation 36

                    19G       Publication of out-of-pocket expenses                           36

                       20       Number of certificates that may be created (Act s 23B)   36

                  20AA       Multiplying number of certificates (Act s 23B)                 41

                  20AB       Regulator may make determinations about particular premises          43

                  20AC       Requirements for creation of certificates                        43

                    20A       Assignment of small generation unit certificates (Act s 23C) 47

                    20B       Election to not create certificates (Act s 23E)                  47

                  20BA       Record keeping for small generation units                      47

Division 2.4                  Solar water heater and small generation unit returns      

                    20C       Information to be included in return (Act s 23F)               48

Division 2.5                  Suspending accreditation of a power station                  

                  20DA       Matters relevant to a decision to suspend the accreditation of a power station (Act s 30D)     49

                    20D       Circumstances for suspending accreditation of an accredited power station (Act s 30E)        50

Division 2.6                  Varying 1997 eligible renewable power baseline for an accredited power station  

                    20E       Circumstances for varying 1997 eligible renewable power baseline for an accredited power station (Act s 30F)                                                         51

                     20F       Notification of determination under regulation 20E          53

Division 2.7                  Varying 2008 WCMG limit for an accredited power station

                  20FA       Guidelines for varying 2008 WCMG limit                         54

                  20FB       Circumstances for varying 2008 WCMG limit for an accredited power station 54

                  20FC       Redistribution of 2008 WCMG limits between accredited power stations        56

                  20FD       Notification of determination                                          57

Part 2A                        Clearing house for small-scale technology certificates           

                    20G       Operation of clearing house                                           58

                    20H       Application to enter small-scale technology certificates into clearing house   58

                      20I       Entering small-scale technology certificates into the clearing house  59

                     20J       Removing small-scale technology certificates from clearing house transfer list          59

                    20K       Regulator may withdraw small-scale technology certificates from clearing house       60

                     20L       Owner may request Regulator to withdraw small-scale technology certificates            61

                    20M       Persons not entitled to purchase small-scale technology certificates through clearing house  61

                    20N       Small-scale technology certificates to be transferred or created within 3 days            62

                    20O       Refunds                                                                        62

                    20P       GST registration                                                            63

Part 3                           Acquisition of electricity                                         

                    21A       Prescribed person or body                                            64

                       22       Capacity of grids                                                          65

Part 3A                        Partial Exemption Certificates                               

Division 1                     Interpretation                                                                  

                    22A       Interpretation                                                                 66

                    22B       Conditions for production to be referrable to a site         71

                    22C       Meaning of saleable quality                                            72

Division 2                     Emissions-intensive trade-exposed activities                  

                    22D       Emissions-intensive trade-exposed activities                  73

Division 3                     Publication of information                                              

                    22E       Information about partial exemptions to be published -- section 38C of the Act        73

Division 4                     Applications for partial exemption certificates                

Subdivision A                Who may apply -- prescribed persons                                            

                     22F       Prescribed persons -- subsection 46A (1) of the Act      74

                    22G       Prescribed person -- person with contract for supply of electricity to site     74

                    22H       Prescribed person -- liable entity with operational control 75

                      22I       Prescribed person -- liable entity for future activity         75

                     22J       Prescribed person -- person with a new contract for supply of electricity      76

                    22K       Prescribed person -- nominated person                         77

                     22L       Prescribed person -- liable entity changes                     79

                    22M       Prescribed person -- multiple liable entities                    80

Subdivision B                Information to be included in applications under subsection 46A (1) of the Act     

                    22N       Information to be included                                             81

                    22O       Information to be included with all applications               81

                    22P       Information to be included in some applications only      83

                    22Q       Information to be included in applications for new entrant site           84

                    22R       Information to be included in applications for significantly expanded site      85

                    22S       Information to be included if prescribed person is a person prescribed under regulation 22L  87

                     22T       Information to be included if prescribed person is a person prescribed under regulation 22M 88

                    22U       Information to be verified                                               88

Subdivision BA             Reports to accompany certain applications                                  

                  22UA       Reports to accompany certain applications                    88

                  22UB       Application to be accompanied by audit report               89

                  22UC       Application of National Greenhouse and Energy Reporting (Audit) Determination 2009 91

Subdivision C                Time and manner of lodging applications under section 46A of the Act   

                    22V       Time for lodging                                                            91

                    22X       Time for lodging -- applications after 2010                     91

                    22Y       Manner of lodging                                                         92

Division 5                     Calculating amount of partial exemption                        

Subdivision A                General                                                                                                     

                     22Z       Method for calculating amount of partial exemption        92

Subdivision B                Method for calculation                                                                          

                  22ZA       Method                                                                         93

Subdivision C                Matters relating to factor ASP                                                           

                  22ZB       Factor -- ASP                                                               96

                  22ZC       Regulator must be satisfied about amount or volume      98

                  22ZD       Factor -- EASPiatfincurr                                                   100

Subdivision D                Matters relating to factor G                                                                 

                  22ZE       Factor -- G                                                                 103

Subdivision E                Method for calculation if liable entity changes and new certificate is issued          

                   22ZF       Prescribed method if liable entity changes and new certificate is issued -- paragraph 46B (1) (a) of the Act                                                                    104

                  22ZG       Prescribed method if there is a second liable entity and new certificate is issued -- paragraph 46B (1) (a) of the Act                                                   105

Subdivision F                 Regulator to estimate and publish volume weighted average market price for REC           

                  22ZH       Regulator must estimate and publish weighted average market price for REC            106

Division 6                     Form of partial exemption certificate                              

                    22ZI       Prescribed information -- paragraph 46B (1) (b) of the Act 107

                   22ZJ       Partial exemption certificate information                       107

Division 7                     Prescribed period for issuing partial exemption certificates         

                  22ZK       Prescribed period                                                        108

                   22ZL       Prescribed period for issuing partial exemption certificate for 2010 and subsequent years     108

Division 8                     Amending partial exemption certificates                         

Subdivision A                Amendment of partial exemption certificates on application -- paragraph 46C (2) (a) of the Act     

                  22ZN       Amendment upon request                                            109

Subdivision B                Amendment of partial exemption certificate on Regulator's own initiative -- subsection 46C (3) of the Act                                                                                                             

                  22ZO       Amendment of partial exemption certificate -- subsection 46A (3) of the Act 109

                  22ZP       Circumstance -- if change of liable entity                     110

                  22ZQ       Circumstances -- if there is a second liable entity         111

                  22ZR       Circumstance -- if activity ceases at site                      112

                  22ZS       Circumstance -- if partial exemption certificate is inaccurate 113

Division 8A                  Information for partial exemption certificates                  

                22ZSA       Requirement to give information                                   114

Division 9                     Record keeping                                                              

                   22ZT       Records to be kept by persons issued with a partial exemption certificate     114

Part 4                           Renewable energy shortfall charge                    

Division 1                     Liability to charge -- small-scale technology shortfall charge      

                  22ZU       Prescribed percentage                                                 116

                  22ZV       Energy acquisition statement lodged -- requirements for Regulator exercising powers or functions                                                                     116

                  22ZW       No energy acquisition statement lodged -- requirements for Regulator exercising powers or functions                                                                     116

                  22ZX       Applications under section 38AF of Act                        117

                  22ZY       Applications under section 38AG of Act                       118

Division 2                     Large-scale generation shortfall charge                          

                       23       Renewable power percentage                                       119

Division 3                     Small-scale technology shortfall charge                         

                    23A       Small-scale technology percentage                              119

Part 5                           Statements and assessments                               

                       24       Annual energy acquisition statements                           120

                    24A       Surrender of small-scale technology certificates            121

                    24B       Surrender of additional certificates                               121

                       25       Annual large-scale generation shortfall statements         121

                    25A       Annual small-scale technology shortfall statements       122

Part 6                           Administration                                                           

                       26       Seizing and disposing of property                                123

                       27       Identity cards for authorised officers                            123

                       28       Fees                                                                           124

Part 7                           Inspections of small generation units                 

Division 1                     General                                                                           

                       29       Purpose of Part                                                           127

                       30       General requirements for inspections                            127

                       31       Part 7 not to limit other inspections                              127

                       32       Publication of inspections                                            128

Division 2                     Appointment of inspectors                                             

                       33       Appointment of inspectors                                           128

                       34       Identity cards                                                              129

                       35       Offence for not returning identity card                          129

                       36       Inspector must not have conflict of interest                   129

Division 3                     Powers of inspectors                                                      

                       37       Entry to premises                                                        130

                       38       Consent                                                                      130

                       39       Matters for inspection                                                  130

                       40       Conduct of inspection                                                 132

                       41       Dealing with imminent safety risks                                133

Division 4                     Reports                                                                           

                       42       Inspector to prepare a report                                        134

                       43       Procedural fairness                                                      135

                       44       Copy of final report to be provided to interested parties 135

                       45       Copy of report to be provided to Clean Energy Council 136

                       46       Copy of report to be provided to relevant State or Territory Regulators         136

                       47       Regulator may declare person ineligible to design and install small generation units   136

                       48       Matters to consider before making declaration              137

Part 8                           Review                                                                         

                       49       Review of decisions                                                    138

Schedule 1                   Guidelines for determining components of electricity generation system that are taken to be part of a power station                                                140

Schedule 3                   Guidelines for determining 1997 eligible renewable power baseline for a power station    146

Schedule 3A                Guidelines for determining 2008 WCMG limit             151

Schedule 4                   Determination of solar water heater certificates          155

Schedule 5                   Zone ratings and zones for solar (photovoltaic) systems 156

Part 1                              Zone ratings                                                                156

Part 2                              Zones                                                                         156

Schedule 6                   Emissions-intensive trade-exposed activities             159

Part 1                              Preliminary                                                                  159

Part 2                              Production of glass containers                                     160

Part 3                              Production of bulk flat glass                                        161

Part 4                              Production of methanol                                               162

Part 5                              Production of carbon black                                          163

Part 6                              Production of white titanium dioxide (TiO2) pigment       164

Part 7                              Production of silicon                                                   165

Part 8                              Smelting zinc                                                               166

Part 9                              Integrated production of lead and zinc                          167

Part 10                            Aluminium smelting                                                      169

Part 11                            Production of high purity ethanol                                  170

Part 12                            Production of magnesia                                               171

Part 13                            Manufacture of newsprint                                             173

Part 14                            Dry pulp manufacturing                                                175

Part 15                            Cartonboard manufacturing                                          177

Part 16                            Packaging and industrial paper manufacturing              179

Part 17                            Printing and writing paper manufacturing                       181

Part 18                            Alumina refining                                                           183

Part 19                            Tissue paper manufacturing                                         184

Part 20                            Integrated iron and steel manufacturing                         186

Part 21                            Manufacture of carbon steel from cold ferrous feed      191

Part 22                            Petroleum refining                                                       195

Part 23                            Production of ethene (ethylene)                                    199

Part 24                            Production of polyethylene                                          200

Part 25                            Production of synthetic rutile                                        201

Part 26                            Production of manganese                                            202

Part 27                            Production of clinker                                                   204

Part 28                            Production of lime                                                       205

Part 29                            Production of fused alumina                                        207

Division 1                      Production of fused alumina                                        207

Division 2                      Classification of activity                                               207

Division 3                      Electricity baseline for calculating partial exemption      207

Part 30                            Production of copper                                                  208

Division 1                      Production of copper                                                  208

Division 2                      Classification of activity                                               209

Division 3                      Electricity baseline for calculating partial exemption      209

Part 31                            Production of carbamide (urea)                                    210

Division 1                      Production of carbamide (urea)                                    210

Division 2                      Classification of activity                                               211

Division 3                      Electricity baseline for calculating partial exemption      211

Part 32                            Production of sodium carbonate (soda ash) and sodium bicarbonate           211

Division 1                      Production of sodium carbonate (soda ash) and sodium bicarbonate           211

Division 2                      Classification of activity                                               212

Division 3                      Electricity baseline for calculating partial exemption      212

Part 33                            Production of ammonia                                               213

Division 1                      Production of ammonia                                               213

Division 2                      Classification of activity                                               213

Division 3                      Electricity baseline for calculating partial exemption      214

Part 34                            Production of ammonium nitrate                                   214

Division 1                      Production of ammonium nitrate                                   214

Division 2                      Classification of activity                                               214

Division 3                      Electricity baseline for calculating partial exemption      215

Part 35                            Production of chlorine gas and sodium hydroxide (caustic soda) solution     215

Division 1                      Production of chlorine gas and sodium hydroxide (caustic soda) solution     215

Division 2                      Classification of activity                                               216

Division 3                      Electricity baseline for calculating partial exemption      216

Part 36                            Production of fused zirconia                                        217

Division 1                      Production of fused zirconia                                        217

Division 2                      Classification of activity                                               217

Division 3                      Electricity baseline for calculating partial exemption      217

Part 37                            Production of iron ore pellets                                       218

Division 1                      Production of iron ore pellets                                       218

Division 2                      Classification of activity                                               218

Division 3                      Electricity baseline for calculating partial exemption      218

Part 38                            Production of liquefied natural gas                               219

Division 1                      Production of liquefied natural gas                               219

Division 2                      Classification of activity                                               219

Division 3                      Electricity baseline for calculating partial exemption      220

Part 39                            Production of magnetite concentrate                            220

Division 1                      Production of magnetite concentrate                            220

Division 2                      Classification of activity                                               221

Division 3                      Electricity baseline for calculating partial exemption      221

Notes                                                                                                        222

 


  

Notes to the Renewable Energy (Electricity) Regulations 2001

Note 1

The Renewable Energy (Electricity) Regulations 2001 (in force under the Renewable Energy (Electricity) Act 2000) as shown in this compilation comprise Statutory Rules 2001 No. 2 amended as indicated in the Tables below.

The Renewable Energy (Electricity) Regulations 2001 was amended by the Renewable Energy (Electricity) Amendment Act 2010 (No. 69, 2010). The amendment has been incorporated in this compilation.

For all relevant information pertaining to application, saving or transitional provisions see Table A.

Table of Instruments

Year and
number

Date of notification
in Gazette or
FRLI Registration

Date of
commencement

Application, saving or
transitional provisions

2001 No. 2

6 Feb 2001

6 Feb 2001

 

2001 No. 219

23 Aug 2001

23 Aug 2001

R. 4

2002 No. 48

15 Mar 2002

Rr. 1-3 and Schedule 1: 1 Apr 2001
Schedule 2: 1 Jan 2002
Remainder: 15 Mar 2002

--

2002 No. 232

4 Oct 2002

Rr. 1-3 and Schedule 1: 1 July 2002
Remainder: 4 Oct 2002

--

2002 No. 339

20 Dec 2002

Rr. 1-3 and Schedule 1: 27 Aug 2002
Remainder: 1 Jan 2003

--

2003 No. 96

29 May 2003

29 May 2003

--

2003 No. 315

11 Dec 2003

11 Dec 2003

--

2004 No. 322

25 Nov 2004

25 Nov 2004

--

2005 No. 5

14 Feb 2005 (see F2005L00222)

15 Feb 2005

--

2005 No. 72

29 Apr 2005 (see F2005L00954)

Rr. 1-3 and Schedule 1: 25 Nov 2004
Remainder: 30 Apr 2005

--

2005 No. 255

11 Nov 2005 (see F2005L03467)

14 Nov 2005

--

2005 No. 256

14 Nov 2005 (see F2005L03271)

15 Nov 2005

--

2005 No. 310

19 Dec 2005 (see F2005L04003)

20 Dec 2005

--

2006 No. 120

7 June 2006 (see F2006L01653)

8 June 2006

--

2006 No. 248

21 Sept 2006 (see F2006L03049)

21 Sept 2006

--

2006 No. 344

15 Dec 2006 (see F2006L03994)

16 Dec 2006

--

2006 No. 345

15 Dec 2006 (see F2006L03960)

16 Dec 2006

--

2007 No. 218

24 July 2007 (see F2007L02204)

25 July 2007

--

2007 No. 308

27 Sept 2007 (see F2007L03761)

28 Sept 2007

--

2007 No. 336

5 Oct 2007 (see
F2007L03953)

Rr. 1-3 and Schedule 1: 6 Oct 2007
Schedule 2: 5 Nov 2007 (see r. 2 (b))

--

2008 No. 263

18 Dec 2008 (see F2008L04657)

19 Dec 2008

--

2009 No. 131

25 June 2009 (see F2009L02502)

1 July 2009 (see r. 2 and F2009L02489)

--

2009 No. 221

8 Sept 2009 (see F2009L03474)

9 Sept 2009

--

2009 No. 222

8 Sept 2009 (see F2009L03475)

9 Sept 2009

R. 4

2009 No. 379

16 Dec 2009 (see F2009L04571)

17 Dec 2009

--

2010 No. 46

12 Mar 2010 (see F2010L00654)

13 Mar 2010

--

2010 No. 52

26 Mar 2010 (see F2010L00713)

27 Mar 2010

--

2010 No. 142

18 June 2010 (see F2010L01597)

21 June 2010

R. 4

2010 No. 204

9 July 2010 (see F2010L01954)

10 July 2010

--

2010 No. 239

30 Sept 2010 (see F2010L02544)

1 Oct 2010

R. 4

2010 No. 246

15 Oct 2010 (see F2010L02641)

16 Oct 2010

--

2010 No. 256

29 Oct 2010 (see F2010L02806)

30 Oct 2010

--

2010 No. 320

13 Dec 2010 (see F2010L03206)

Rr. 1-3, 5 (1), 5 (4)
and Schedule 1:
14 Dec 2010
Rr. 4, 5 (2), 5 (3) and
Schedule 2: 1 Jan 2011

R. 5

2010 No. 321

13 Dec 2010 (see F2010L03159)

1 Jan 2011 (see r. 2)

--

2011 No. 11

1 Mar 2011 (see F2011L00332)

2 Mar 2011

--

2011 No. 88

21 June 2011 (see F2011L01090)

1 July 2011

--

2011 No. 116

30 June 2011 (see F2011L01381)

1 July 2011

R. 4

2011 No. 177

5 Oct 2011 (see F2011L02025)

6 Oct 2011

--

2011 No. 222

23 Nov 2011 (see F2011L02410)

24 Nov 2011

R. 4

2011 No. 270

12 Dec 2011 (see F2011L02649)

13 Dec 2011

--

2012 No. 13

24 Feb 2012 (see F2012L00399)

25 Feb 2012

--

2012 No. 14

24 Feb 2012 (see F2012L00400)

Ss. 1-3 and Schedule 1:
25 Feb 2012
Schedule 2: (a)

--

2012 No. 15

24 Feb 2012 (see F2012L00402)

25 Feb 2012

--

2012 No. 33

23 Mar 2012 (see F2012L00672)

2 Apr 2012 (see s. 2 and F2011L02617)

--

(a)    Section 2 of SLI 2012 No. 14 provides as follows:

This regulation commences as follows:

   (a)       on the day after it is registered -- sections 1 to 3 and Schedule 1;

   (b)       immediately after the commencement of Schedule 1 -- Schedule 2.

Table of Amendments

ad. = added or inserted      am. = amended      rep. = repealed      rs. = repealed and substituted

Provision affected

How affected

Part 1

 

R. 3.........................................

am. 2001 No. 219; 2002 Nos. 48, 232 and 339; 2003 Nos. 96 and 315; 2004 No. 322; 2005 Nos. 255 and 256; 2006 Nos. 248 and 345; 2007 No. 336; 2010 Nos. 239 and 320; 2012 No. 13

R. 3A.......................................

ad. 2006 No. 345

 

am. 2010 No. 320

Note to r. 3A..........................

rs. 2012 No. 33

R. 3B.......................................

ad. 2007 No. 336

Part 2

 

Division 2.1

 

R. 3S.......................................

ad. 2012 No. 15

R. 4.........................................

am. 2007 No. 336

Note to r. 5.............................

ad. 2007 No. 336

R. 5A.......................................

ad. 2012 No. 15

Division 2.2

 

R. 6.........................................

rs. 2007 No. 336

R. 7.........................................

am. 2001 No. 219

 

rs. 2007 No. 336

R. 8.........................................

rs. 2007 No. 336; 2011 No. 222

R. 9.........................................

rs. 2005 No. 255; 2007 No. 336

R. 11.......................................

rep. 2001 No. 219

R. 12.......................................

rep. 2007 No. 336

Division 2.2A

 

Div. 2.2A of Part 2................

ad. 2011 No. 270

R. 10A....................................

ad. 2011 No. 270

R. 10B....................................

ad. 2011 No. 270

R. 10C....................................

ad. 2011 No. 270

Division 2.3

 

Subdivision 2.3.1

 

Heading to Subdiv. 2.3.1....

rs. 2007 No. 336

R. 13.......................................

am. 2007 No. 336

R. 14.......................................

am. 2001 No. 219

 

rs. 2007 No. 336

 

am. 2009 No. 131; 2011 No. 270

R. 15.......................................

rs. 2007 No. 336

 

am. 2011 No. 270

R. 15A....................................

ad. 2007 No. 336

 

am. 2011 No. 270

R. 16.......................................

am. 2011 No. 270

R. 17.......................................

rep. 2007 No. 336

R. 18.......................................

rs. 2007 No. 336

 

am. 2011 No. 270; 2012 No. 33

Subdivision 2.3.2

 

R. 19.......................................

am. 2001 No. 219; 2002 Nos. 48 and 232; 2003 No. 96

 

rs. 2005 No. 256

 

am. 2006 No. 345

 

rs. 2007 No. 336

R. 19A....................................

ad. 2007 No. 336

 

am. 2009 No. 222

 

rs. 2010 No. 320

R. 19B....................................

ad. 2007 No. 336

 

rs. 2010 No. 320

R. 19BA..................................

ad. 2010 No. 320

R. 19BB..................................

ad. 2010 No. 320

R. 19BC.................................

ad. 2010 No. 320

R. 19BD.................................

ad. 2010 No. 320

R. 19C....................................

ad. 2007 No. 336

 

am. 2010 No. 320

Subdivision 2.3.3

 

R. 19D....................................

ad. 2007 No. 336

 

am. 2010 No. 142

R. 19E....................................

ad. 2010 No. 320

R. 19F.....................................

ad. 2010 No. 320

R. 19G....................................

ad. 2010 No. 320

Heading to r. 20...................

rs. 2007 No. 336

R. 20.......................................

am. 2002 No. 232; 2004 No. 322; 2005 No. 255; 2007 No. 336; 2009 No. 221; 2010 Nos. 142 and 204; 2011 No. 88

Note to r. 20 (1)....................

ad. 2002 No. 232

R. 20AA..................................

ad. 2009 No. 221

 

am. 2010 Nos. 204 and 320; 2011 No. 88

R. 20AB..................................

ad. 2009 No. 221

R. 20AC.................................

ad. 2010 No. 142

 

am. 2010 Nos. 239 and 320

R. 20A....................................

ad. 2007 No. 336

R. 20B....................................

ad. 2007 No. 336

R. 20BA..................................

ad. 2010 No. 142

Division 2.4

 

Div. 2.4 of Part 2..................

ad. 2007 No. 336

R. 20C....................................

ad. 2007 No. 336

Division 2.5

 

Div. 2.5 of Part 2..................

ad. 2007 No. 336

R. 20DA.................................

ad. 2009 No. 379

R. 20D....................................

ad. 2007 No. 336

 

am. 2011 No. 270

Division 2.6

 

Div. 2.6 of Part 2..................

ad. 2007 No. 336

R. 20E....................................

ad. 2007 No. 336

 

am. 2011 No. 270

R. 20F.....................................

ad. 2007 No. 336

Division 2.7

 

Div. 2.7 of Part 2..................

ad. 2012 No. 15

R. 20FA..................................

ad. 2012 No. 15

R. 20FB..................................

ad. 2012 No. 15

R. 20FC..................................

ad. 2012 No. 15

R. 20FD..................................

ad. 2012 No. 15

Part 2A

 

R. 20G....................................

ad. 2010 No. 320

R. 20H....................................

ad. 2010 No. 320

 

am. 2012 No. 33

R. 20I......................................

ad. 2010 No. 320

R. 20J.....................................

ad. 2010 No. 320

R. 20K....................................

ad. 2010 No. 320

 

am. 2012 No. 33

R. 20L.....................................

ad. 2010 No. 320

R. 20M....................................

ad. 2010 No. 320

 

am. 2012 No. 33

R. 20N....................................

ad. 2010 No. 320

R. 20O....................................

ad. 2010 No. 320

R. 20P....................................

ad. 2010 No. 320

Part 3

 

R. 21.......................................

rs. 2007 No. 336

 

am. 2009 No. 131

R. 21A....................................

ad. 2006 No. 248

Part 3A

 

Part 3A...................................

ad. 2010 No. 46

Division 1

 

R. 22A....................................

ad. 2010 No. 46

 

am. 2010 Nos. 246 and 320; 2011 No. 11; 2012 No. 13

R. 22B....................................

ad. 2010 No. 46

R. 22C....................................

ad. 2010 No. 46

Division 2

 

R. 22D....................................

ad. 2010 No. 46

Note 1 to r. 22D....................

rep. 2012 No. 13

Note 2 to r. 22D....................

am. 2010 No. 204

 

rep. 2012 No. 13

Note 3 to r. 22D....................

rep. 2012 No. 13

Note to r. 22D.......................

ad. 2012 No. 13

Division 3

 

R. 22E....................................

ad. 2010 No. 46

Division 4

 

Subdivision A

 

R. 22F.....................................

ad. 2010 No. 46

R. 22G....................................

ad. 2010 No. 46

R. 22H....................................

ad. 2010 No. 46

R. 22I......................................

ad. 2010 No. 46

R. 22J.....................................

ad. 2010 No. 46

 

am. 2010 No. 320

R. 22K....................................

ad. 2010 No. 46

R. 22L.....................................

ad. 2010 No. 46

R. 22M....................................

ad. 2010 No. 46

Subdivision B

 

R. 22N....................................

ad. 2010 No. 46

R. 22O....................................

ad. 2010 No. 46

 

am. 2010 No. 320

R. 22P....................................

ad. 2010 No. 46

 

am. 2012 No. 13

R. 22Q....................................

ad. 2010 No. 46

R. 22R....................................

ad. 2010 No. 46

R. 22S....................................

ad. 2010 No. 46

R. 22T.....................................

ad. 2010 No. 46

R. 22U....................................

ad. 2010 No. 46

Subdivision BA

 

R. 22UA.................................

ad. 2010 No. 320

R. 22UB.................................

ad. 2010 No. 320

R. 22UC.................................

ad. 2010 No. 320

Subdivision C

 

R. 22V....................................

ad. 2010 No. 46

R. 22W...................................

ad. 2010 No. 46

 

am. 2010 No. 239

 

rep. 2012 No. 13

R. 22X....................................

ad. 2010 No. 46

 

am. 2010 No. 239; 2012 No. 13

R. 22Y.....................................

ad. 2010 No. 46

Division 5

 

Subdivision A

 

R. 22Z.....................................

ad. 2010 No. 46

 

am. 2010 No. 320

Subdivision B

 

R. 22ZA..................................

ad. 2010 No. 46

 

am. Act No. 69, 2010; 2010 No. 320; 2011 No. 116

Note to r. 22ZA (2)...............

ad. 2011 No. 11

Subdivision C

 

R. 22ZB..................................

ad. 2010 No. 46

 

am. 2010 No. 246

R. 22ZC..................................

ad. 2010 No. 46

 

am. 2012 No. 13

R. 22ZD..................................

ad. 2010 No. 46

Subdivision D

 

R. 22ZE..................................

ad. 2010 No. 46

Subdivision E

 

R. 22ZF..................................

ad. 2010 No. 46

R. 22ZG..................................

ad. 2010 No. 46

Subdivision F

 

R. 22ZH..................................

ad. 2010 No. 46

 

am. 2010 No. 320

Division 6

 

R. 22ZI....................................

ad. 2010 No. 46

R. 22ZJ...................................

ad. 2010 No. 46

Division 7

 

R. 22ZK..................................

ad. 2010 No. 46

Heading to r. 22ZL...............

rs. 2010 No. 320

R. 22ZL..................................

ad. 2010 No. 46

 

am. 2010 No. 320

R. 22ZM.................................

ad. 2010 No. 46

 

rep. 2010 No. 320

Division 8

 

Subdivision A

 

R. 22ZN..................................

ad. 2010 No. 46

Subdivision B

 

R. 22ZO..................................

ad. 2010 No. 46

R. 22ZP..................................

ad. 2010 No. 46

R. 22ZQ..................................

ad. 2010 No. 46

R. 22ZR..................................

ad. 2010 No. 46

R. 22ZS..................................

ad. 2010 No. 46

Division 8A

 

Div. 8A of Part 3A................

ad. 2010 No. 239

R. 22ZSA...............................

ad. 2010 No. 239

Division 9

 

R. 22ZT..................................

ad. 2010 No. 46

Part 4

 

Heading to Part 4.................

rs. 2007 No. 336

Division 1

 

Heading to Div. 1 of............
Part 4

ad. 2012 No. 14

R. 23A....................................

ad. 2010 No. 320

Renumbered r. 22ZU.......

2012 No. 14

R. 23B....................................

ad. 2010 No. 320

Renumbered r. 22ZV.......

2012 No. 14

R. 23C....................................

ad. 2010 No. 320

Renumbered 22ZW..........

2012 No. 14

R. 23D....................................

ad. 2010 No. 320

Renumbered 22ZX...........

2012 No. 14

R. 23E....................................

ad. 2010 No. 320

Renumbered 22ZY...........

2012 No. 14

Heading to Div. 1 of............
Part 4

ad. 2010 No. 321
rep. 2012 No. 14

Div. 1 of Part 4......................

rep. 2012 No. 14

R. 23.......................................

am. 2002 Nos. 48 and 339; 2003 No. 315; 2005 Nos. 5 and 310; 2006 No. 344; 2007 No. 308; 2008 No. 263; 2010 Nos. 52 and 321

 

rep. 2012 No. 14

Division 2

 

Div. 2 of Part 4......................

ad. 2010 No. 321

 

rs. 2012 No. 14

R. 23A (second occurring).

ad. 2010 No. 321

 

rep. 2012 No. 14

R. 23.......................................

ad. 2012 No. 14

Division 3

 

Div. 3 of Part 4......................

ad. 2012 No. 14

R. 23A....................................

ad. 2012 No. 14

Part 5

 

R. 24.......................................

am. 2007 No. 336

 

am. 2009 No. 131

 

rs. 2010 No. 320

 

am. 2012 No. 33

R. 24A....................................

ad. 2010 No. 320

R. 24B....................................

ad. 2010 No. 320

R. 25.......................................

am. 2007 No. 336

 

am. 2009 No. 131

 

rs. 2010 No. 320

 

am. 2012 No. 33

R. 25A....................................

ad. 2010 No. 320

 

am. 2012 No. 33

Part 6

 

R. 28.......................................

am. 2001 No. 219; 2007 No. 336; 2010 No. 320; 2011 No. 177

R. 29.......................................

rep. 2007 No. 336

Part 7

 

Part 7......................................

ad. 2010 No. 320

Division 1

 

R. 29.......................................

ad. 2010 No. 320

R. 30.......................................

ad. 2010 No. 320

R. 31.......................................

ad. 2010 No. 320

R. 32.......................................

ad. 2010 No. 320

Division 2

 

R. 33.......................................

ad. 2010 No. 320

R. 34.......................................

ad. 2010 No. 320

R. 35.......................................

ad. 2010 No. 320

R. 36.......................................

ad. 2010 No. 320

Division 3

 

R. 37.......................................

ad. 2010 No. 320

R. 38.......................................

ad. 2010 No. 320

R. 39.......................................

ad. 2010 No. 320

R. 40.......................................

ad. 2010 No. 320

R. 41.......................................

ad. 2010 No. 320

Division 4

 

R. 42.......................................

ad. 2010 No. 320

R. 43.......................................

ad. 2010 No. 320

R. 44.......................................

ad. 2010 No. 320

R. 45.......................................

ad. 2010 No. 320

R. 46.......................................

ad. 2010 No. 320

R. 47.......................................

ad. 2010 No. 320

R. 48.......................................

ad. 2010 No. 320

Part 8

 

R. 49.......................................

ad. 2010 No. 320

Schedule 1

 

Heading to Schedule 1.......

rs. 2007 No. 336

Schedule 1............................

am. 2001 No. 219; 2007 No. 336; 2011 No. 270; 2012 No. 15

Schedule 2............................

rep. 2007 No. 336

Schedule 3

 

Heading to Schedule 3.......

rs. 2007 No. 336

Schedule 3............................

am. 2001 No. 219; 2007 No. 336; 2012 No. 15

Schedule 3A

 

Schedule 3A.........................

ad. 2012 No. 15

Schedule 4

 

Heading to Schedule 4.......

rs. 2010 No. 320

Schedule 4............................

rep. 2004 No. 322

 

ad. 2007 No. 336

 

am. 2010 No. 320

Schedule 5

 

Heading to Schedule 5.......

rs .2007 No. 336

Schedule 5............................

rs. 2002 No. 232

 

am. 2007 No. 336; 2009 No. 379

Schedule 6

 

Schedule 6............................

rep. 2004 No. 322

 

ad. 2010 No. 46

 

am. 2010 Nos. 204, 239, 246 and 256; 2011 No. 11; 2012 No. 13

Schedule 7

 

Schedule 7............................

am. 2001 No. 219; 2002 Nos. 48 and 232; 2003 Nos. 96 and 315; 2004 No. 322; 2005 Nos. 72, 256 and 310; 2006 Nos. 120 and 345; 2007 No. 218

 

rep. 2007 No. 336

Table A                  Application, saving or transitional provisions

Statutory Rules 2001 No. 219

4              Transitional

                Items 14 to 17, 34 and 35 of Part 2 of Schedule 7 of the Renewable Energy (Electricity) Regulations 2001 as in force immediately before 23 August 2001 continue to apply to solar hot water heaters, mentioned in those items, that were installed before gazettal.

 

Select Legislative Instrument 2009 No. 222

4              Application

                The amendments made by Schedule 1 apply in relation to solar water heaters that are installed after the commencement of these Regulations.

 

Select Legislative Instrument 2010 No. 142

4              Transitional

         (1)   The amendments made by Schedule 1 apply to a small generation unit that is a solar (photovoltaic) system installed on or after 20 August 2010.        

         (2)   The amendments made by Schedule 1 apply to a small generation unit, other than a solar (photovoltaic) system, installed on or after 20 December 2010.

 

Select Legislative Instrument 2010 No. 239

4              Transitional

         (1)   The amendments made by items [2] to [4] of Schedule 1 apply to a small generation unit that is a solar (photovoltaic) system installed after 31 October 2010.

         (2)   The amendments made by items [2] to [4] of Schedule 1 apply to a small generation unit, other than a solar (photovoltaic) system, installed after 19 December 2010.

 

Select Legislative Instrument 2010 No. 320

5              Transitional

         (1)   The amendments made by items [6] and [7] of Schedule 1 apply to a transitional solar water heater on and from 31 December 2011.

         (2)   Despite the amendment made by item [3] of Schedule 2, regulations 24 and 25 of the Renewable Energy (Electricity) Regulations 2001, as in force immediately before the commencement of this subregulation, continue to apply to liabilities incurred for 2010 and earlier years.

         (3)   Despite the amendment made by item [4] of Schedule 2, subregulation 28 (4) of the Renewable Energy (Electricity) Regulations 2001, as in force immediately before the commencement of this subregulation, continues to apply to liabilities incurred for 2010 and earlier years

         (4)   In this regulation:

transitional solar water heater means a solar water heater included in the Register of solar water heaters on the day this subregulation commences.

 

Select Legislative Instrument 2011 No. 116

4              Transitional

         (1)   The amendments made by items [1] to [5] of Schedule 1 to the Renewable Energy (Electricity) Amendment Regulations 2011 (No. 2) do not apply to the creation of a certificate for a small generation unit installed on or after 1 July 2011 and before 30 June 2012 if:

                 (a)     the unit was installed under a contract entered into before 5 May 2011; and

                (b)     the parties to the contract were legally bound to proceed with the contract on and after 5 May 2011; and

                 (c)     if the contract was conditional on any event happening, the event happened before 5 May 2011; and

                (d)     the person who became the owner of the unit following its installation was a party to the contract; and

                 (e)     the contract documentation identifies:

                          (i)     the date the contract was entered into; and

                         (ii)     the identity of each party to the contract; and

                        (iii)     the address at which the unit was installed; and

                        (iv)     the size, make and model of the unit; and

                 (f)     the person entitled to create certificates for the unit (the entitled person) meets the requirements of subregulation (2) before creating certificates for the unit.

         (2)   For paragraph (1) (f), the entitled person must:

                 (a)     possess contract documentation identifying the matters mentioned in paragraph (1) (e); and

                (b)     provide to the Regulator a statutory declaration made by the entitled person:

                          (i)     describing the contract documentation; and

                         (ii)     stating that the entitled person can provide the contract documentation to the Regulator if requested by the Regulator; and

                        (iii)     stating that the contract meets the requirements of paragraphs (1) (a) to (d); and      

                        (iv)     stating:

                        (A)     the date on which the contract was entered into; and

                        (B)     the identity of each party to the contract; and

                        (C)     the address at which the unit was installed; and

                        (D)     the size, make and model of the unit; and

                         (v)     stating that the contract documentation in the entitled person's possession identifies the matters mentioned in subparagraph (iv); and

                 (c)     if the contract is an oral contract -- provide to the Regulator a statutory declaration made by each party to the contract stating:

                          (i)     the date on which the contract was entered into; and

                         (ii)     the identity of each party to the contract; and

                        (iii)     the address at which the unit was installed; and

                        (iv)     the size, make and model of the unit; and

                (d)     provide to the Regulator any other information or documents requested by the Regulator.

         (3)   An entitled person may provide one statutory declaration under paragraph (2) (b) setting out the information required by that paragraph for more than one unit, including where:

                 (a)     the units were installed under different contracts; or

                (b)     the contracts for the installations of the units involve different parties; or

                 (c)   the units were installed at different addresses.

         (4)   However a statutory declaration provided under paragraph (2) (c) must relate to one unit only.

         (5)   For paragraph (2) (c), if the entitled person is a party to the contract, he or she only needs to provide statutory declarations from the other parties to the contract.

         (6)   In this regulation:

contract documentation means:

                 (a)     for a written contract -- the written documents setting out the terms and conditions of the contract and evidencing the offer and acceptance of those terms and conditions; and

                (b)     for an oral contract -- means written documentation that was created and dated before 10 June 2011, evidencing the existence of the contract.

 

Select Legislative Instrument 2011 No. 222

4              Transitional

         (1)   Subregulation (2) applies in relation to a power station that:

                 (a)     was accredited under Division 3 of Part 2 of the Renewable Energy (Electricity) Act 2000 on or before 10 July 2011; and

                (b)     listed, in the application for accreditation, wood waste as an eligible energy source from which power was intended to be generated; and

                 (c)     has created at least one renewable energy certificate that:

                          (i)     was created because of electricity generated using wood waste; and

                         (ii)     was registered by the Regulator on or before 10 July 2011.

         (2)   Despite the amendment made by Schedule 1, regulation 8 of the Renewable Energy (Electricity) Regulations 2001, as in force immediately before the commencement of this regulation (previous regulation 8), continues to apply to a power station in the following circumstances:

                 (a)     if the power station has a generation capacity that is equal to or less than the generation capacity the power station had on 10 July 2011 -- previous regulation 8 continues to apply to the power station until the earlier of the following:

                          (i)     the generation capacity of the power station exceeds the generation capacity the power station had on 10 July 2011;

                         (ii)     31 December 2020;

                (b)     if the power station has a generation capacity that is greater than the generation capacity the power station had on 10 July 2011 -- previous regulation 8 continues to apply to the power station until 31 December 2020, but only in relation to any electricity the power station generates using wood waste in a calendar year up to the contingent annual cap.

         (3)   For this regulation:

contingent annual cap means the maximum amount of electricity generated using wood waste that a power station has previously generated over a full calendar year that:

                 (a)     commenced after the power station was accredited to use wood waste to generate electricity; and

                (b)     ended on 31 December 2011, or on 31 December of an earlier year.

_______________

 


 



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback