Commonwealth Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
RENEWABLE ENERGY (ELECTRICITY) REGULATIONS 2001
- made under the Renewable Energy (Electricity) Act 2000
TABLE OF PROVISIONS
PART 1--PRELIMINARY
1. Name of Regulations [see Note 1]
2. Commencement [see Note 1]
3. Definitions
3A. Conditions for solar water heater
3B. Definition of auxiliary loss
PART 2--RENEWABLE ENERGY CERTIFICATES
Division 2.1--Accreditation
3S. Final day for including eligible WCMG in application
4. Eligibility for accreditation
5. 1997 eligible renewable power baselines
5A. 2008 WCMG limit
Division 2.2--Eligible renewable energy sources
6. Meaning of certain energy sources that are eligible renewable energy sources (Act s 17)
7. Meaning of certain energy sources that are not eligible renewable energy sources (Act s 17)
8. Meaning of wood waste
9. Energy crops (Act s 17)
10. Special requirements -- ocean, wave and tide
Division 2.2A--Eligible WCMG
10A. Eligible WCMG starting day
10B. Meaning of waste coal mine gas
10C. Limitations on eligible WCMG
Division 2.3--Eligible electricity generation
13. Working out electricity generation for a power station
14. General formula
15. Ineligible fuel component
15A. Electricity omitted from calculation
16. Supplementary generation
18. Electricity generation returns for accredited power stations (Act s 20)
Subdivision 2.3.2--Solar water heaters
19. Creation of certificates for solar water heaters (Act s 21)
19A. Number of certificates
19B. Determination of method for determining number of certificates
19BA. Determination of number of certificates
19BB. Variation of determination
19BC. Requests for determination
19BD. Invitation for requests for determination
19C. Register of solar water heaters (Act s 23AA)
Subdivision 2.3.3--Small generation units
19D. Creation of certificates for small generation units (Act s 23A)
19E. Conditions for creation of certificates
19F. Certain costs to be included in purchase and installation
19G. Publication of out-of-pocket expenses
20. Number of certificates that may be created (Act s 23B)
20AA. Multiplying number of certificates (Act s 23B)
20AB. Regulator may make determinations about particular premises
20AC. Requirements for creation of certificates
20A. Assignment of small generation unit certificates (Act s 23C)
20B. Election to not create certificates (Act s 23E)
20BA. Record keeping for small generation units
Division 2.4--Solar water heater and small generation unit returns
20C. Information to be included in return (Act s 23F)
Division 2.5--Suspending accreditation of a power station
20DA. Matters relevant to a decision to suspend the accreditation of a power station (Act s 30D)
20D. Circumstances for suspending accreditation of an accredited power station (Act s 30E)
Division 2.6--Varying 1997 eligible renewable power baseline for an accredited power station
20E. Circumstances for varying 1997 eligible renewable power baseline for an accredited power station (Act s 30F)
20F. Notification of determination under regulation 20E
Division 2.7--Varying 2008 WCMG limit for an accredited power station
20FA. Guidelines for varying 2008 WCMG limit
20FB. Circumstances for varying 2008 WCMG limit for an accredited power station
20FC. Redistribution of 2008 WCMG limits between accredited power stations
20FD. Notification of determination
PART 2A--CLEARING HOUSE FOR SMALL-SCALE TECHNOLOGY CERTIFICATES
20G. Operation of clearing house
20H. Application to enter small-scale technology certificates into clearing house
20I. Entering small-scale technology certificates into the clearing house
20J. Removing small-scale technology certificates from clearing house transfer list
20K. Regulator may withdraw small-scale technology certificates from clearing house
20L. Owner may request Regulator to withdraw small-scale technology certificates
20M. Persons not entitled to purchase small-scale technology certificates through clearing house
20N. Small-scale technology certificates to be transferred or created within 3 days
20O. Refunds
20P. GST registration
PART 3--ACQUISITION OF ELECTRICITY
21A. Prescribed person or body
21. Amount of electricity acquired
22. Capacity of grids
PART 3A--PARTIAL EXEMPTION CERTIFICATES
Division 1--Interpretation
22A. Interpretation
22B. Conditions for production to be referrable to a site
22C. Meaning of saleable quality
Division 2--Emissions-intensive trade-exposed activities
22D. Emissions-intensive trade-exposed activities
Division 3--Publication of information
22E. Information about partial exemptions to be published -- section 38C of the Act
Division 4--Applications for partial exemption certificates
Subdivision A--Who may apply -- prescribed persons
22F. Prescribed persons -- subsection 46A (1) of the Act
22G. Prescribed person -- person with contract for supply of electricity to site
22H. Prescribed person -- liable entity with operational control
22I. Prescribed person -- liable entity for future activity
22J. Prescribed person -- person with a new contract for supply of electricity
22K. Prescribed person -- nominated person
22L. Prescribed person -- liable entity changes
22M. Prescribed person -- multiple liable entities
Subdivision B--Information to be included in applications under subsection 46A (1) of the Act
22N. Information to be included
22O. Information to be included with all applications
22P. Information to be included in some applications only
22Q. Information to be included in applications for new entrant site
22R. Information to be included in applications for significantly expanded site
22S. Information to be included if prescribed person is a person prescribed under regulation 22L
22T. Information to be included if prescribed person is a person prescribed under regulation 22M
22U. Information to be verified
Subdivision BA--Reports to accompany certain applications
22UA. Reports to accompany certain applications
22UB. Application to be accompanied by audit report
22UC. Application of National Greenhouse and Energy Reporting (Audit) Determination 2009
Subdivision C--Time and manner of lodging applications under section 46A of the Act
22V. Time for lodging
22X. Time for lodging -- applications after 2010
22Y. Manner of lodging
Division 5--Calculating amount of partial exemption
Subdivision A--General
22Z. Method for calculating amount of partial exemption
Subdivision B--Method for calculation
22ZA. Method
Subdivision C--Matters relating to factor ASP
22ZB. Factor -- ASP
22ZC. Regulator must be satisfied about amount or volume
22ZD. Factor -- EASPiatfincurr
Subdivision D--Matters relating to factor G
22ZE. Factor -- G
Subdivision E--Method for calculation if liable entity changes and new certificate is issued
22ZF. Prescribed method if liable entity changes and new certificate is issued -- paragraph 46B (1) (a) of the Act
22ZG. Prescribed method if there is a second liable entity and new certificate is issued -- paragraph 46B (1) (a) of the Act
Subdivision F--Regulator to estimate and publish volume weighted average market price for REC
22ZH. Regulator must estimate and publish weighted average market price for REC
Division 6--Form of partial exemption certificate
22ZI. Prescribed information -- paragraph 46B (1) (b) of the Act
22ZJ. Partial exemption certificate information
Division 7--Prescribed period for issuing partial exemption certificates
22ZK. Prescribed period
22ZL. Prescribed period for issuing partial exemption certificate for 2010 and subsequent years
Division 8--Amending partial exemption certificates
Subdivision A--Amendment of partial exemption certificates on application -- paragraph 46C (2) (a) of the Act
22ZN. Amendment upon request
Subdivision B--Amendment of partial exemption certificate on Regulator's own initiative -- subsection 46C (3) of the Act
22ZO. Amendment of partial exemption certificate -- subsection 46A (3) of the Act
22ZP. Circumstance -- if change of liable entity
22ZQ. Circumstances -- if there is a second liable entity
22ZR. Circumstance -- if activity ceases at site
22ZS. Circumstance -- if partial exemption certificate is inaccurate
Division 8A--Information for partial exemption certificates
22ZSA. Requirement to give information
Division 9--Record keeping
22ZT. Records to be kept by persons issued with a partial exemption certificate
PART 4--RENEWABLE ENERGY SHORTFALL CHARGE
Division 1--Liability to charge -- small-scale technology shortfall charge
22ZU. Prescribed percentage
22ZV. Energy acquisition statement lodged -- requirements for Regulator exercising powers or functions
22ZW. No energy acquisition statement lodged -- requirements for Regulator exercising powers or functions
22ZX. Applications under section 38AF of Act
22ZY. Applications under section 38AG of Act
Division 2--Large-scale generation shortfall charge
23. Renewable power percentage
Division 3--Small-scale technology shortfall charge
23A. Small-scale technology percentage
PART 5--STATEMENTS AND ASSESSMENTS
24. Annual energy acquisition statements
24A. Surrender of small-scale technology certificates
24B. Surrender of additional certificates
25. Annual large-scale generation shortfall statements
25A. Annual small-scale technology shortfall statements
PART 6--ADMINISTRATION
26. Seizing and disposing of property
27. Identity cards for authorised officers
28. Fees
PART 7--INSPECTIONS OF SMALL GENERATION UNITS
Division 1--General
29. Purpose of Part
30. General requirements for inspections
31. Part 7 not to limit other inspections
32. Publication of inspections
Division 2--Appointment of inspectors
33. Appointment of inspectors
34. Identity cards
35. Offence for not returning identity card
36. Inspector must not have conflict of interest
Division 3--Powers of inspectors
37. Entry to premises
38. Consent
39. Matters for inspection
40. Conduct of inspection
41. Dealing with imminent safety risks
Division 4--Reports
42. Inspector to prepare a report
43. Procedural fairness
44. Copy of final report to be provided to interested parties
45. Copy of report to be provided to Clean Energy Council
46. Copy of report to be provided to relevant State or Territory Regulators
47. Regulator may declare person ineligible to design and install small generation units
48. Matters to consider before making declaration
PART 8--REVIEW
49. Review of decisions
SCHEDULE 1 Guidelines for determining components of electricity generation system that are taken to be part of a power station
SCHEDULE 3 Guidelines for determining 1997 eligible renewable power baseline for a power station
SCHEDULE 3A Guidelines for determining 2008 WCMG limit
SCHEDULE 4 Determination of solar water heater certificates
SCHEDULE 5 Zone ratings and zones for solar (photovoltaic) systems
SCHEDULE 6 Emissions-intensive trade-exposed activities
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback