• Specific Year
    Any

OFFSHORE PETROLEUM AND GREENHOUSE GAS STORAGE (SAFETY) REGULATIONS 2009

- made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

Table of Provisions

CHAPTER 1--Preliminary

  • 1.1 Name of Regulations
  • 1.4 Objects
  • 1.5 Definitions
  • 1.6 Vessels and structures that are not facilities
  • 1.7 Vessels and structures that are not associated offshore places
  • 1.8 Forms, notices and reports
  • 1.9 Relationship with other regulations made under the Act

CHAPTER 2--Offshore facilities

PART 1--OPERATORS

  • 2.1 Nomination of operator--general
  • 2.3 Acceptance or rejection of nomination of operator
  • 2.4 Register of operators

PART 2--SAFETY--CASES

Division 1--Contents of safety cases

Subdivision A--Contents of a safety case
  • 2.5 Facility description, formal safety assessment and safety management system
  • 2.6 Implementation and improvement of the safety management system
  • Subdivision B--Safety measures
  • 2.7 Standards to be applied
  • 2.8 Command structure
  • 2.9 Members of the workforce must be competent
  • 2.10 Permit to work system for safe performance of various activities
  • 2.11 Involvement of members of the workforce
  • 2.12 Design, construction, installation, maintenance and modification
  • 2.13 Medical and pharmaceutical supplies and services
  • 2.14 Machinery and equipment
  • 2.15 Drugs and intoxicants
  • Subdivision C--Emergencies
  • 2.16 Evacuation, escape and rescue analysis
  • 2.17 Fire and explosion risk analysis
  • 2.18 Emergency communications systems
  • 2.19 Control systems
  • 2.20 Emergency preparedness
  • 2.21 Pipes
  • 2.22 Vessel and aircraft control
  • Subdivision D--Record keeping
  • 2.23 Arrangements for records

Division 2--Submission and acceptance of safety cases

  • 2.24 Safety case to be submitted to NOPSEMA
  • 2.25 NOPSEMA may request more information
  • 2.26 Acceptance or rejection of a safety case
  • 2.27 Notice of decision on safety case
  • 2.28 Consent to undertake work in a manner different from safety case
  • 2.29 Duties under Part 2 of Schedule 3 to the Act

Division 3--Revised safety cases

  • 2.30 Revision of a safety case because of a change of circumstances or operations
  • 2.31 Revision on request by NOPSEMA
  • 2.32 Revision after 5 years
  • 2.33 NOPSEMA may request more information
  • 2.34 Acceptance or rejection of a revised safety case
  • 2.35 Notice of decision on revised safety case
  • 2.36 Effect of rejection of revised safety case

Division 4--Withdrawal of acceptance of a safety case

  • 2.37 Grounds for withdrawal of acceptance
  • 2.38 Notice before withdrawal of acceptance

Division 5--Exemptions

  • 2.39 NOPSEMA may give an exemption

PART 3--VALIDATION

  • 2.40 Validation of design, construction and installation, significant modification or decommissioning of a facility

PART 4--NOTIFYING--AND REPORTING ACCIDENTS AND DANGEROUS OCCURRENCES

  • 2.41 Interpretation
  • 2.42 Notices and reports of accidents and dangerous occurrences

PART 5--PENALTY--PROVISIONS

  • 2.43 Facility must have operator
  • 2.44 Safety case required for the relevant stage in the life of a facility
  • 2.45 Work on a facility must comply with the safety case
  • 2.46 New health and safety risk
  • 2.47 Maintaining records
  • 2.48 Person on a facility must comply with safety case
  • 2.49 Interference with accident sites

PART 6--MISCELLANEOUS

  • 2.50 Details in applications or submissions

PART 7--APPLICATION--OF THESE REGULATIONS IF A REMEDIAL DIRECTION IS IN FORCE

  • 2.51 Application of these Regulations if a remedial direction is in force

CHAPTER 3--Occupational health and safety

PART 1--HEALTH--AND SAFETY

PART 2--ELECTION--OF HEALTH AND SAFETY REPRESENTATIVES

Division 1--Returning officer

  • 3.8 Appointment of returning officer

Division 2--The poll

  • 3.9 Number of votes
  • 3.10 Right to secret ballot
  • 3.11 Conduct of poll by secret ballot
  • 3.12 Conduct of poll if no request made for secret ballot
  • 3.13 If no candidate is elected

Division 3--Polling by secret ballot

  • 3.14 Ballot - papers
  • 3.15 Distribution of ballot papers
  • 3.16 Manner of voting by secret ballot

Division 4--The count

  • 3.17 Envelopes given to returning officer
  • 3.18 Scrutineers
  • 3.19 Returning officer to be advised of scrutineers
  • 3.20 Persons present at the count
  • 3.21 Conduct of the count
  • 3.22 Informal ballot - papers
  • 3.23 Completion of the count
  • 3.24 Destruction of election material

Division 5--Result of election

  • 3.25 Request for recount
  • 3.26 Irregularities at election
  • 3.27 Result of poll

PART 3--ADVICE--, INVESTIGATIONS AND INQUIRIES

  • 3.28 OHS inspectors--identity cards
  • 3.29 Taking samples for testing etc
  • 3.30 Form of certain notices

PART 4--EXEMPTIONS--FROM THE REQUIREMENTS IN PART 3 OF SCHEDULE 3 TO THE ACT

  • 3.31 Orders under clause 46 of Schedule 3 to the Act

PART 5--STATE--AND NORTHERN TERRITORY LAWS THAT DO NOT APPLY

  • 3.32 Laws or parts of laws that do not apply

CHAPTER 4--Diving

PART 1--PRELIMINARY

  • 4.1 Meaning of diving
  • 4.2 When a diving operation begins and ends

PART 2--DIVING--SAFETY MANAGEMENT SYSTEMS

  • 4.3 No diving without DSMS
  • 4.4 Contents of DSMS
  • 4.5 Acceptance of new DSMS
  • 4.6 Acceptance of revised DSMS
  • 4.7 Grounds for rejecting DSMS
  • 4.8 Notice of reasons
  • 4.9 Register of DSMSs
  • 4.10 Revision of DSMS
  • 4.11 Notice to revise DSMS

PART 3--DIVING--PROJECT PLANS

  • 4.12 Diving project plan to be approved
  • 4.13 Diving project plan to NOPSEMA if there is no operator
  • 4.14 Diving project plan to NOPSEMA if requested
  • 4.15 Updating diving project plan
  • 4.16 Contents of diving project plan
  • 4.17 No diving without approved diving project plan

PART 4--INVOLVEMENT--OF DIVERS AND MEMBERS OF THE WORKFORCE

PART 5--SAFETY--RESPONSIBILITIES

  • 4.19 Safety responsibilities of diving contractors
  • 4.20 Safety in the diving area
  • 4.21 Diving depths

PART 6--DIVING--SUPERVISORS

  • 4.22 Appointment of diving supervisors
  • 4.23 Duties of diving supervisors

PART 7--START---UP NOTICES

  • 4.24 Start - up notice

PART 8--DIVING--OPERATIONS

  • 4.25 Divers in diving operations
  • 4.26 Medical certificates

PART 9--RECORDS

  • 4.27 Diving operations record
  • 4.28 Divers' log books

CHAPTER 5--Transitional

PART 1--PRELIMINARY

PART 2--OPERATORS

PART 3--SAFETY--CASES

  • 5.4 Existing safety cases remain in force

PART 4--PIPELINES

  • 5.6 Existing pipeline management plans remain in force
  • 5.8 Operator of a pipeline before 1 January 2010

PART 5--DIVING--SAFETY MANAGEMENT SYSTEMS AND DIVING PROJECT PLANS

  • 5.10 Existing DSMS remain in force
  • 5.13 Existing diving project plans remain in force

PART 7--EXEMPTIONS--FROM REQUIREMENTS IN PART 3 OF SCHEDULE 3 TO THE ACT

Navigate