Commonwealth Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
NAVIGATION (CONSTRUCTION) REGULATIONS 1968 - REG 14
Well not to be constructed in double bottom
- (1)
- Subject to subregulation (3) of this regulation, a well shall not be
constructed in a double bottom fitted to a ship in pursuance of this Division
unless the Authority exempts the ship from the requirements of this
subregulation.
- (2)
- The Authority shall not exempt a ship from the requirements of the last
preceding subregulation unless it is satisfied that the protection given to
the ship by the double bottom will not be diminished by reason of the
exemption.
- (3)
- A well may be constructed in the double bottom of a ship for the purposes
of drainage in the after end of the shaft tunnel, if the ship is a screw ship,
and in any other position, if:
- (a)
- the well is not larger, and does not
extend downwards further, than is necessary for that purpose;
- (b)
- the depth
of the well is not, except in the case of a well at the after end of the shaft
tunnel, more than the depth less eighteen inches of the double bottom at the
centreline; and
- (c)
- the well does not, except in the case of a well at the
after end of the shaft tunnel, extend below the horizontal plane referred to
in subregulation (2) of the last preceding regulation.
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback