Commonwealth Consolidated Acts

[Index] [Table] [Search] [Search this Act] [Notes] [Noteup] [Download] [Help]

RENEWABLE ENERGY (ELECTRICITY) ACT 2000 - NOTES

Act No. 174 of 2000 as amended

This compilation was prepared on 10 September 2009
taking into account amendments up to Act No. 78 of 2009

The text of any of those amendments not in force
on that date is appended in the Notes section

The operation of amendments that have been incorporated may be
affected by application provisions that are set out in the Notes section

Prepared by the Office of Legislative Drafting and Publishing,
Attorney‑General's Department, Canberra

  

  

  


Contents

Part 1--Preliminary                                                                                                                1

1............ Short title [see Note 1] ....................................................................... 1

2............ Commencement [see Note 1] .............................................................. 1

3............ Object/outline ..................................................................................... 1

4............ Years to which this Act applies ......................................................... 2

5............ Definitions .......................................................................................... 2

6............ Act binds Crown ................................................................................ 8

7............ Application to the external Territories ............................................... 8

7A......... Tax deductibility ................................................................................. 8

Part 2--Renewable energy certificates                                                                       9

Division 1--Preliminary                                                                                               9

8............ Overview of Part ................................................................................ 9

Division 2--Registration of persons                                                                   10

9............ Who can register ............................................................................... 10

10.......... Applying for registration .................................................................. 10

11.......... Regulator to approve or refuse application ...................................... 10

12.......... Regulator to allocate registration numbers ........................................ 10

Division 2A--Provisional accreditation of power stations                       11

12A....... Application for provisional accreditation of a power station .......... 11

12B....... Regulator may give provisional accreditation ................................... 11

12C....... Time limit for deciding applications ................................................. 12

Division 3--Accreditation of eligible power stations                                 13

13.......... Application for accreditation ............................................................ 13

14.......... Regulator to determine certain matters ............................................. 14

15.......... Regulator to approve or refuse application ...................................... 15

15A....... Time limit for deciding applications ................................................. 15

15B....... Nominated person for power station ............................................... 16

16.......... Regulator to allocate identification codes ......................................... 16

17.......... What is an eligible renewable energy source? .................................. 16

17A....... What is eligible WCMG? .................................................................. 17

Division 4--Creation of certificates                                                                     19

Subdivision A--Electricity generation                                                                   19

18.......... Creating certificates for additional renewable electricity .................. 19

19.......... When certificates may be created ..................................................... 20

20.......... Electricity generation return ............................................................. 20

20A....... Amending electricity generation returns ........................................... 20

Subdivision B--Solar water heaters                                                                       21

21.......... When a certificate may be created .................................................... 21

22.......... How many certificates may be created ............................................. 21

23.......... Who may create a certificate ............................................................. 21

23AA.... Register of solar water heaters .......................................................... 21

Subdivision BA--Small generation units                                                              22

23A....... When a certificate may be created .................................................... 22

23B....... How many certificates may be created ............................................. 22

23C....... Who may create a certificate ............................................................. 23

23D....... No other certificates to be created .................................................... 24

23E........ Election to not create certificates under this Subdivision ................. 24

Subdivision BB--Solar water heater and small generation unit return         25

23F........ Solar water heater and small generation unit return .......................... 25

Subdivision C--Improper creation of certificates                                                25

24.......... Improper creation of certificates--offences ..................................... 25

Division 5--Form and registration of certificates                                        27

25.......... Form and content of certificates--power stations ........................... 27

25A....... Form and content of certificates--solar water heaters and small generation units   27

26.......... Certificates must be registered .......................................................... 28

Division 6--Transfer of certificates                                                                     30

27.......... Certificates may be transferred ......................................................... 30

28.......... Regulator to be notified .................................................................... 30

Division 7--Retirement of certificates                                                               31

28A....... Registered owner may surrender certificate ...................................... 31

29.......... Retirement of certificates .................................................................. 31

Division 8--Suspension of registration                                                              32

30.......... Suspension of registration--conviction of offence ........................... 32

30A....... Suspension of registration--other grounds ...................................... 32

Division 9--Changing the nominated person for an accredited power station   33

30B....... Changing the nominated person for an accredited power station ..... 33

Division 10--Varying what constitutes a power station                            34

30C....... Varying what constitutes a power station ........................................ 34

Division 11--Suspending the accreditation of a power station             35

30D....... Suspending the accreditation of a power station--interconnected power stations 35

30E........ Suspending the accreditation of a power station--other grounds .... 36

Division 12--Varying 1997 eligible renewable power baselines and 2008 WCMG limits           38

30F........ Varying 1997 eligible renewable power baselines ............................. 38

30G....... Varying 2008 WCMG limits ............................................................ 38

Part 3--Acquisition of electricity                                                                                  40

31.......... What are relevant acquisitions? ........................................................ 40

32.......... Wholesale acquisitions ...................................................................... 41

33.......... Notional wholesale acquisitions ....................................................... 41

34.......... Special provision relating to transactions involving AEMO or a person or body prescribed by the regulations    42

Part 4--Renewable energy shortfall charge                                                           43

Division 1--Liability to charge                                                                               43

35.......... Liable entities .................................................................................... 43

36.......... Charge payable by liable entity ........................................................ 43

37.......... Amount of charge ............................................................................. 43

38.......... Determination of renewable energy certificate shortfall ................... 44

Division 1A--Partial exemption from liability to charge                          45

38A....... Object ............................................................................................... 45

38B....... Amount of partial exemption ........................................................... 45

38C....... Information about partial exemptions to be published on Regulator's website       45

Division 2--Renewable power percentage                                                      46

39.......... Regulations to specify renewable power percentage ........................ 46

40.......... Required GWh of renewable source electricity ................................ 47

Division 3--Other provisions related to the charge                                   49

41.......... Arrangements to avoid or reduce renewable energy shortfall charge 49

42.......... Application of Act to Commonwealth ............................................. 49

43.......... Cancellation of exemptions from charges ......................................... 50

Part 5--Statements, certificates and assessments                                             51

Division 1--Statements                                                                                              51

44.......... Annual energy acquisition statements .............................................. 51

45.......... Restrictions on certificates that can be surrendered ......................... 52

45A....... Amending annual energy acquisition statements .............................. 53

46.......... Annual renewable energy shortfall statements ................................. 53

Division 1A--Partial exemption certificates                                                   54

46A....... Application for partial exemption certificate ................................... 54

46B....... Partial exemption certificates ............................................................ 54

46C....... Amending partial exemption certificates .......................................... 55

Division 2--Assessments                                                                                         56

47.......... First renewable energy shortfall statement for year taken to be assessment            56

48.......... Default assessments ......................................................................... 56

49.......... Amendment of assessments ............................................................. 57

50.......... Refund of overpaid amounts ............................................................ 59

51.......... Amended assessment to be an assessment ....................................... 59

52.......... Notice of assessment ........................................................................ 59

53.......... Validity of assessment ...................................................................... 59

53A....... Application of Division .................................................................... 60

Part 6--Objections, reviews and appeals                                                                 61

Division 1--Objections to and review of assessments                              61

54.......... Objections ......................................................................................... 61

55.......... How objections are to be made ......................................................... 61

56.......... Limited objection rights in the case of certain amended assessments 61

57.......... Requests for extension of time ......................................................... 61

58.......... Regulator to decide objections .......................................................... 62

59.......... Person may require Regulator to make an objection decision ........... 62

60.......... Liable entity may seek review of, or appeal against, Regulator's decision               63

61.......... Grounds of objection and burden of proof ....................................... 63

62.......... Time limit for appeals ...................................................................... 63

63.......... Order of Federal Court on objection decision ................................... 64

64.......... Implementation of Federal Court order in respect of objection decision 64

65.......... Pending appeal not to affect implementation of decisions ............... 64

Division 2--Review of other decisions                                                              65

66.......... Review of decisions .......................................................................... 65

Part 7--Collection and recovery of charge                                                             68

Division 1--General rules about collection and recovery                       68

67.......... When renewable energy shortfall charge becomes due and payable . 68

68.......... When penalty charge becomes due and payable ............................... 68

69.......... Extension of time for payment ......................................................... 68

70.......... Penalty for unpaid renewable energy shortfall charge or unpaid penalty charge      68

71.......... Recovery of renewable energy shortfall charge related liability ....... 69

72.......... Service of documents if a person is absent from Australia or cannot be found        70

Division 2--Special rules about collection and recovery                         71

Subdivision A--Recovery from a third party                                                         71

73.......... Regulator may collect amounts from third party ............................. 71

74.......... Notice to Commonwealth, State or Territory .................................. 72

75.......... Indemnity ......................................................................................... 73

76.......... Offence ............................................................................................. 73

Subdivision B--Recovery from liquidator                                                             73

77.......... Liquidator's obligation ...................................................................... 73

78.......... Offence ............................................................................................. 75

79.......... Joint liability of 2 or more liquidators .............................................. 75

80.......... Liquidator's other obligation or liability ........................................... 75

Subdivision C--Recovery from receiver                                                                75

81.......... Receiver's obligation ......................................................................... 75

82.......... Offence ............................................................................................. 76

83.......... Joint liability of 2 or more receivers ................................................. 77

84.......... Receiver's other obligation or liability .............................................. 77

Subdivision D--Recovery from agent winding up business for non‑resident principal      77

85.......... Obligation of agent winding up business for non‑resident principal 77

86.......... Offence ............................................................................................. 78

87.......... Joint liability of 2 or more agents ..................................................... 78

88.......... Agent's other obligation or liability .................................................. 78

Subdivision E--Recovery from deceased person's estate                                   79

89.......... Administered estate .......................................................................... 79

90.......... Unadministered estate ...................................................................... 80

Division 3--Other matters                                                                                       81

91.......... What this Division is about .............................................................. 81

92.......... Right of recovery if another person is liable ..................................... 81

93.......... Right of contribution if persons are jointly liable ............................. 81

94.......... Regulator may authorise amount to be recovered ............................. 82

Part 8--Refunding charge                                                                                                 83

95.......... Refunding charge in later years ......................................................... 83

96.......... Value of certificates surrendered ....................................................... 83

97.......... Certificates can only be surrendered if there is no shortfall ............. 83

98.......... Refund of charge where certificates surrendered .............................. 84

Part 9--Penalty charge                                                                                                       85

99.......... Failure to provide statements or information ................................... 85

100........ False or misleading statements ......................................................... 86

101........ Penalty charge where arrangement to avoid renewable energy shortfall charge        86

102........ Assessment of penalty charge .......................................................... 87

103........ Remitting penalty charge .................................................................. 87

Part 10--Administration                                                                                                     88

104........ General administration of Act .......................................................... 88

105........ Annual report ................................................................................... 88

Part 11--Audit                                                                                                                         89

Division 1--Overview                                                                                                 89

106........ Overview of Part .............................................................................. 89

Division 2--Appointment of authorised officers and identity cards   90

107........ Appointment of authorised officers ................................................. 90

108........ Identity cards .................................................................................... 90

109........ Offences related to identity cards ..................................................... 90

Division 3--Powers of authorised officer                                                          92

Subdivision A--Monitoring powers                                                                        92

110........ Entry to premises ............................................................................. 92

111........ Monitoring powers of authorised officers ........................................ 92

Subdivision B--Power of authorised officer to ask questions and seek production in certain circumstances              94

112........ Authorised officer may request or require persons to answer questions etc.           94

113........ Failure to provide information to authorised officer ........................ 94

Division 4--Obligations and incidental powers of authorised officers 96

116........ Authorised officer must produce identity card on request ............... 96

117........ Consent ............................................................................................. 96

118........ Announcement before entry ............................................................. 96

119........ Details of monitoring warrant to be given to occupier etc. before entry 96

120........ Use of electronic equipment in exercising monitoring powers ......... 97

121........ Compensation for damage to electronic equipment .......................... 98

Division 5--Occupier's rights and responsibilities                                     99

122........ Occupier entitled to be present during execution of monitoring warrant 99

123........ Occupier to provide authorised officer with all facilities and assistance 99

124........ Offences related to warrants ............................................................. 99

Division 6--Warrants                                                                                                100

125........ Monitoring warrants ....................................................................... 100

Part 11A--Information‑gathering powers                                                              101

125A..... Regulator may obtain information and documents ......................... 101

125B..... Self‑incrimination ............................................................................ 102

125C..... Copies of documents ...................................................................... 102

125D..... Regulator may retain documents .................................................... 102

125E...... False or misleading evidence ........................................................... 103

Part 12--Secrecy                                                                                                                  104

126........ Persons to whom Part applies ........................................................ 104

127........ Information may be recorded or divulged only for purposes of Act 104

128........ Court may not require information or documents .......................... 105

129........ Information may be divulged to persons performing duties under this Act             105

130........ Information may be divulged to court for purposes of this Act .... 105

131........ Information may be divulged with consent of the subject of the information          106

132........ Information may be divulged to specified persons or bodies ......... 106

133........ Australian Bureau of Statistics to observe secrecy requirements ... 106

134........ Regulator may publish certain information .................................... 107

Part 13--Registers                                                                                                              108

Division 1--General                                                                                                   108

135........ Registers to be maintained .............................................................. 108

Division 2--The register of registered persons                                         109

136........ Contents of register of registered persons ...................................... 109

137........ Form of register .............................................................................. 109

Division 3--The register of accredited power stations                           110

138........ Contents of register of accredited power stations .......................... 110

139........ Form of register .............................................................................. 110

Division 4--The register of renewable energy certificates                  111

140........ Contents of register of renewable energy certificates ..................... 111

141........ Form of register .............................................................................. 111

Division 5--The register of applications for accredited power stations                 112

141A..... Contents of register of applications for accredited power stations 112

141B..... Form of register .............................................................................. 112

Part 14--Renewable Energy Regulator and Office of the Renewable Energy Regulator                 113

Division 1--Renewable Energy Regulator                                                    113

142........ Renewable Energy Regulator .......................................................... 113

143........ Appointment of Regulator ............................................................. 113

144........ Remuneration of Regulator ............................................................. 113

145........ Recreation leave etc. ....................................................................... 114

146........ Resignation ..................................................................................... 114

147........ Removal from office etc. ................................................................. 114

147A..... Disclosure of interests .................................................................... 115

148........ Acting appointment ........................................................................ 116

Division 2--Office of the Renewable Energy Regulator                        117

149........ Establishment ................................................................................. 117

150........ Function .......................................................................................... 117

151........ Staff ................................................................................................ 117

Part 15--Offences for failure to provide documents                                       118

154........ Failure to provide documents ......................................................... 118

Part 16--Miscellaneous                                                                                                   119

155........ Contracting outsiders ...................................................................... 119

156........ Delegation ....................................................................................... 119

157........ Appropriation ................................................................................ 120

158........ Judicial notice of signature .............................................................. 120

159........ Evidence .......................................................................................... 120

160........ Records to be kept and preserved by registered persons, liable entities and holders of partial exemption certificates ........................................................................................................ 121

161........ Regulations ..................................................................................... 122

162........ Review of operation of renewable energy legislation ..................... 122

Part 17--Application of Act to 2001                                                                          124

163........ Object of Part ................................................................................. 124

164........ Modification of references to a year ............................................... 124

165........ Modification of other references .................................................... 124

Notes                                                                                                                                           125


An Act for the establishment and administration of a scheme to encourage additional electricity generation from renewable energy sources, and for related purposes

  

Notes to the Renewable Energy (Electricity) Act 2000

Note 1

The Renewable Energy (Electricity) Act 2000 as shown in this compilation comprises Act No. 174, 2000 amended as indicated in the Tables below.

For all relevant information pertaining to application, saving or transitional provisions see Table A.

Table of Acts

Act

Number
and year

Date
of Assent

Date of commencement

Application, saving or transitional provisions

Renewable Energy (Electricity) Act 2000

174, 2000

21 Dec 2000

18 Jan 2001

 

Renewable Energy (Electricity) Amendment Act 2006

90, 2006

30 June 2006

Schedule 1: 11 Sept 2006 (see F2006L02947)
Remainder: Royal Assent

Sch. 1 (items
193-207)

Superannuation Legislation Amendment (Trustee Board and Other Measures) (Consequential Amendments) Act 2008

26, 2008

23 June 2008

Schedule 1 (items 109-112): Royal Assent

--

Statute Law Revision Act 2008

73, 2008

3 July 2008

Schedule 1 (items 41-45): (a)

--

Australian Energy Market Amendment (AEMO and Other Measures) Act 2009

17, 2009

26 Mar 2009

Schedule 1 (items 7-11): 1 July 2009
(see F2009L02489
and South Australia Gazette 25 June 2009
p3000)

--

Renewable Energy (Electricity) Amendment Act 2009

78, 2009

7 Sept 2009

Schedule 3 (items 1, 2): [see Note 2]
Schedule 3 (items 3, 5): 8 Sept 2009
Schedule 3 (items 4, 8, 9): [see Table A]
Schedule 3 (items 6, 7): [see Table A]
Remainder: Royal Assent

Sch. 1 (item 7), Sch. 2 (item 22) and Sch. 3 (items 3‑9)


(a)     Subsection 2(1) (item 29) of the Statute Law Revision Act 2008 provides as follows:

                 (1)   Each provision of this Act specified in column 1 of the table commences, or is taken to have commenced, in accordance with column 2 of the table. Any other statement in column 2 has effect according to its terms.

 

Commencement information

Column 1

Column 2

Column 3

Provision(s)

Commencement

Date/Details

29.  Schedule 1, items 41 to 45

Immediately after the commencement of the Renewable Energy (Electricity) Act 2000.

18 January 2001


Table of Amendments

ad. = added or inserted     am. = amended     rep. = repealed     rs. = repealed and substituted

Provision affected

How affected

Part 1

 

S. 3......................................

am. No. 90, 2006; No. 78, 2009

S. 4......................................

am. No. 78, 2009

S. 5......................................

am. No. 90, 2006; Nos. 17 and 78, 2009

Part 2

 

Division 1

 

S. 8......................................

am. No. 90, 2006; No. 78, 2009

Division 2

 

Heading to Div. 2 of Part 2..

rs. No. 90, 2006

S. 9......................................

am. No. 90, 2006

Division 2A

 

Div. 2A of Part 2..................

ad. No. 90, 2006

S. 12A.................................

ad. No. 90, 2006

 

am. No. 78, 2009

Ss. 12B, 12C.......................

ad. No. 90, 2006

Division 3

 

Ss. 13, 14............................

am. No. 90, 2006; No. 78, 2009

Note to s. 14(1)...................

ad. No. 90, 2006

Note to s. 14(3)...................

ad. No. 90, 2006

 

am. No. 78, 2009

Note to s. 15........................

ad. No. 90, 2006

Subhead. to s. 15A(1)........

ad. No. 78, 2009

S. 15A.................................

ad. No. 90, 2006

 

am. No. 78, 2009

S. 15B.................................

ad. No. 90, 2006

S. 17....................................

rs. No. 90, 2006

S. 17A.................................

ad. No. 78, 2009

Division 4

 

Subdivision A

 

S. 18....................................

am. No. 90, 2006; No. 78, 2009

S. 19....................................

rs. No. 90, 2006

S. 20....................................

am. No. 90, 2006; No. 78, 2009

S. 20A.................................

ad. No. 90, 2006

Subdivision B

 

Ss. 21, 22............................

am. No. 90, 2006

S. 23AA..............................

ad. No. 90, 2006

Subdivision BA

 

S. 23A.................................

am. No. 90, 2006

Subhead. to s. 23B(1).........

ad. No. 78, 2009

S. 23B.................................

am. No. 90, 2006; No. 78, 2009

Ss. 23C, 23D.......................

am. No. 90, 2006

S. 23E..................................

ad. No. 90, 2006

Subdivision BB

 

Subdiv. BB of Div. 4 of........
Part 2

ad. No. 90, 2006

S. 23F..................................

ad. No. 90, 2006

Subdivision C

 

S. 24....................................

am. No. 90, 2006

Division 5

 

Heading to s. 25..................

am. No. 90, 2006

S. 25....................................

am. No. 90, 2006; No. 78, 2009

S. 25A.................................

ad. No. 90, 2006

 

am. No. 78, 2009

Division 7

 

S. 28A.................................

ad. No. 90, 2006

S. 29....................................

am. No. 90, 2006

Division 8

 

Heading to s. 30..................

rs. No. 90, 2006

S. 30A.................................

ad. No. 90, 2006

Division 9

 

Div. 9 of Part 2....................

ad. No. 90, 2006

S. 30B.................................

ad. No. 90, 2006

Division 10

 

Div. 10 of Part 2..................

ad. No. 90, 2006

S. 30C.................................

ad. No. 90, 2006

Division 11

 

Div. 11 of Part 2..................

ad. No. 90, 2006

S. 30D.................................

ad. No. 90, 2006

 

am. No. 78, 2009

S. 30E..................................

ad. No. 90, 2006

Division 12

 

Heading to Div. 12 of Part 2.

rs. No. 78, 2009

Div. 12 of Part 2..................

ad. No. 90, 2006

S. 30F..................................

ad. No. 90, 2006

S. 30G.................................

ad. No. 78, 2009

Part 3

 

Ss. 31, 32............................

am. No. 90, 2006; No. 17, 2009

S. 33....................................

am. No. 90, 2006

Heading to s. 34..................

am. No. 90, 2006; No. 17, 2009

S. 34....................................

am. No. 90, 2006; No. 17, 2009

Part 4

 

Division 1

 

S. 38....................................

am. No. 90, 2006; No. 78, 2009

Division 1A

 

Div. 1A of Part 4..................

ad. No. 78, 2009

Ss. 38A-38C.......................

ad. No. 78, 2009

Division 2

 

Ss. 39, 40............................

am. No. 90, 2006; No. 78, 2009

Division 3

 

Note to s. 41........................

ad. No. 90, 2006

S. 42....................................

am. No. 90, 2006

Part 5

 

Heading to Part 5.................

rs. No. 78, 2009

Division 1

 

S. 44....................................

am. No. 90, 2006; No. 78, 2009

Note to s. 44(1)...................

ad. No. 90, 2006

S. 45....................................

am. No. 90, 2006

S. 45A.................................

ad. No. 90, 2006

S. 46....................................

am. No. 90, 2006

Division 1A

 

Div. 1A of Part 5..................

ad. No. 78, 2009

Ss. 46A-46C.......................

ad. No. 78, 2009

Division 2

 

Ss. 47-49............................

am. No. 90, 2006

Note to s. 49(1)...................

ad. No. 90, 2006

S. 50....................................

am. No. 90, 2006

S. 52....................................

am. No. 90, 2006

S. 53A.................................

ad. No. 90, 2006

Part 6

 

Division 1

 

Ss. 54, 55............................

am. No. 90, 2006

Heading to s. 57..................

am. No. 90, 2006

Ss. 57, 58............................

am. No. 90, 2006

S. 62....................................

am. No. 90, 2006

S. 65....................................

am. No. 90, 2006

Division 2

 

S. 66....................................

am. No. 90, 2006; No. 78, 2009

Part 7

 

Heading to Part 7.................

rs. No. 90, 2006

Division 1

 

Heading to s. 68..................

am. No. 90, 2006

S. 68....................................

am. No. 90, 2006

S. 70....................................

rs. No. 90, 2006

Division 2

 

Subdivision C

 

Ss. 81, 82............................

am. No. 90, 2006

Subdivision D

 

Ss. 85, 86............................

am. No. 90, 2006

Subdivision E

 

S. 89....................................

am. No. 90, 2006

Part 8

 

Ss. 95, 96............................

am. No. 90, 2006

Part 9

 

Ss. 99, 100..........................

am. No. 90, 2006

Heading to s. 101................

am. No. 90, 2006

S. 101..................................

am. No. 90, 2006

Heading to s. 102................

am. No. 90, 2006

S. 102..................................

am. No. 90, 2006

Heading to s. 103................

am. No. 90, 2006

S. 103..................................

am. No. 90, 2006

Part 11

 

Division 2

 

S. 107..................................

am. No. 90, 2006

S. 109..................................

am. No. 90, 2006

Division 3

 

Subdivision A

 

Heading to s. 110................

rs. No. 90, 2006

Ss. 110, 111........................

am. No. 90, 2006

Subdivision B

 

Ss. 112, 113........................

am. No. 90, 2006

Ss. 114, 115........................

rep. No. 90, 2006

Division 4

 

Ss. 119, 120........................

am. No. 90, 2006

Division 5

 

S. 124..................................

am. No. 90, 2006

Division 6

 

S. 125..................................

am. No. 90, 2006

Part 11A

 

Part 11A..............................

ad. No. 90, 2006

Ss. 125A-125E...................

ad. No. 90, 2006

Part 12

 

S. 126..................................

am. No. 90, 2006

S. 127..................................

am. No. 90, 2006; No. 73, 2008

S. 128..................................

am. No. 90, 2006

S. 129..................................

am. No. 73, 2008

S. 130..................................

am. No. 90, 2006; No. 73, 2008

S. 131..................................

am. No. 73, 2008

S. 132..................................

am. No. 90, 2006; No. 73, 2008

S. 134..................................

am. No. 90, 2006

Part 13

 

Division 3

 

S. 138..................................

am. No. 90, 2006; No. 78, 2009

Division 4

 

S. 140..................................

am. No. 90, 2006; No. 78, 2009

Division 5

 

S. 141A...............................

am. No. 90, 2006; No. 78, 2009

Part 14

 

Division 1

 

S. 147..................................

am. No. 90, 2006; No. 26, 2008

S. 147A...............................

ad. No. 90, 2006

S. 148..................................

am. No. 90, 2006

Part 15

 

Heading to Part 15...............

rs. No. 90, 2006

Ss. 152, 153........................

rep. No. 90, 2006

S. 154..................................

am. No. 90, 2006

Part 16

 

Heading to s. 160................

am. No. 78, 2009

S. 160..................................

am. No. 90, 2006; No. 78, 2009

S. 161..................................

am. No. 90, 2006

S. 162..................................

rs. No. 78, 2009


Note 2

Renewable Energy (Electricity) Amendment Act 2009 (No. 78, 2009)

The following amendments commence on 1 July 2011 unless proclaimed earlier:

Schedule 3

1  Subsection 5(1)

Insert:

constitutional corporation means a corporation to which paragraph 51(xx) of the Constitution applies.

2  At the end of Part 1

Add:

7B  Constitutional basis

                   To the extent that this Act applies in relation to a constitutional corporation, the operation of this Act is based on the following legislative powers:

                     (a)  the legislative power that the Commonwealth Parliament has under paragraph 51(xx) of the Constitution;

                     (b)  any other legislative power that the Commonwealth Parliament has under the Constitution.

7C  Immunity from State laws

                   A constitutional corporation need not comply with any law of a State that substantially corresponds to this Act.

As at 10 September 2009 the amendments are not incorporated in this compilation.


Table A

Application, saving or transitional provisions

Renewable Energy (Electricity) Amendment Act 2006 (No. 90, 2006)

Schedule 1

193  Application--creation of renewable energy certificates

The amendments made by items 4, 44, 45, 46, 69, 70, 71, 72, 73, 179 and 180 apply in relation to certificates created after the commencement of those items.

194  Application--charges

The amendments made by items 7, 15, 19, 114, 125, 130, 131, 133, 134, 135 and 145 to 152 apply in relation to amounts that a liable entity becomes liable to pay after the commencement of those items.

195  Application--applications for accreditation of a power station

The amendments made by items 30, 31, 32, 34, 38 and 181 apply in relation to applications made after the commencement of those items.

196  Application--time limit for deciding applications

The amendment made by item 42 (in so far as it inserts section 15A of the Renewable Energy (Electricity) Act 2000) applies in relation to applications made after the commencement of that item.

197  Application--electricity generation

The amendments made by items 43 and 49 apply in relation to electricity generated after the commencement of those items.

198  Transitional--electricity generated before commencement

A person is not entitled to create a certificate under section 18 of the Renewable Energy (Electricity) Act 2000, in respect of electricity generated before this item commences, at any time after the end of the year after the year in which this item commences.

Note:       Section 24 of that Act creates offences for the improper creation of certificates.

199  Application--solar water heaters and small generation units

Creation of solar water heater certificates etc.

(1)        The amendments made by items 54, 55, 57 and 58 apply in relation to solar water heaters installed after the commencement of those items.

Creation of small generation unit certificates

(2)        The amendments made by items 59, 60 (in so far as it inserts subsection 23A(2) of the Renewable Energy (Electricity) Act 2000), 65 and 66 apply in relation to small generation units installed after the commencement of those items.

(3)        The amendments made by items 60 (in so far as it inserts subsection 23A(3) of the Renewable Energy (Electricity) Act 2000), 61 and 62 apply in relation to small generation units installed before or after the commencement of those items.

Assignment of right to create small generation unit certificates

(4)        The amendments made by items 63 and 64 apply in relation to assignments made after the commencement of those items in relation to small generation units installed before or after that commencement.

Returns

(5)        The amendment made by item 67 applies in relation to years ending after the commencement of that item.

200  Application--surrender of certificates

The amendment made by item 74 applies in relation to certificates created before or after the commencement of that item.

201  Application--relevant acquisitions of electricity

The amendments made by items 81 and 84 apply in relation to acquisitions of electricity occurring in the year ending 31 December 2006 or in any later year.

202  Saving--fees for surrender of certificates

Regulations in force for the purposes of subsection 44(5) of the Renewable Energy (Electricity) Act 2000 immediately before the commencement of this item have effect after that commencement as if they were regulations made for the purposes of that subsection after that commencement.

203  Application--secrecy

The amendments made by items 172, 173 and 174 apply in relation to proceedings instituted after the commencement of those items.

204  Application--publication

The amendment made by item 175 applies in relation to years ending after the commencement of that item.

205  Application--register of accredited power stations

The amendment made by item 178 applies in relation to power stations accredited before or after the commencement of that item.

206  Transitional--accredited power stations

(1)        This item applies in relation to a power station that was accredited under Division 3 of Part 2 of the Renewable Energy (Electricity) Act 2000 before the commencement of this item.

(2)        The Regulator must, within 28 days after the commencement of that item, approve a person as the nominated person for the power station.

Note:       The register of accredited power stations is to contain the name of the nominated person for an accredited power station: see section 138 of the Renewable Energy (Electricity) Act 2000.

(3)        The person approved must be a stakeholder in relation to the power station.

Note:       Another stakeholder in relation to the power station may later apply to the Regulator to become the nominated person for the power station: see section 30B of the Renewable Energy (Electricity) Act 2000.

(4)        The approval must be in writing and is taken to be an approval given under section 30B of the Renewable Energy (Electricity) Act 2000.

(5)        For the purposes of section 66 of the Renewable Energy (Electricity) Act 2000:

                     (a)  the approval is taken to be a reviewable decision; and

                     (b)  the affected person in relation to that decision is taken to be any other stakeholder in relation to the power station.

(6)        For the purposes of this item, stakeholder, in relation to a power station, means:

                     (a)  a person who operates the power station (whether alone or together with one or more other persons); or

                     (b)  a person who owns all, or a part, of the power station (whether alone or together with one or more other persons).

207  Transitional--relevant acquisitions of electricity

(1)        This item applies if:

                     (a)  a person has lodged an energy acquisition statement for the year (the applicable year) ending on 31 December 2001, 31 December 2002, 31 December 2003, 31 December 2004 or 31 December 2005; and

                     (b)  the amount of electricity specified in the statement as having been acquired under relevant acquisitions is greater than the amount that would have been acquired under relevant acquisitions if the amendments made by items 81 and 84 had applied to the applicable year.

(2)        If this item applies, the amount of electricity acquired under relevant acquisitions during the applicable year is taken to be the amount that would have been acquired under relevant acquisitions if the amendments made by items 81 and 84 had applied to the applicable year.

(3)        If, after the application of this item, the person has a carried forward surplus at the end of the applicable year, the Regulator may, upon written application by the person:

                     (a)  reduce the carried forward surplus of the person for the applicable year (which may be to nil); and

                     (b)  reduce the renewable energy certificate shortfall of another person for the applicable year by a corresponding amount.

 

Renewable Energy (Electricity) Amendment Act 2009 (No. 78, 2009)

Schedule 1

7  Application of amendments of section 23B

The amendments made by items 4 to 6 apply to small generation units installed on or after 9 June 2009.

Schedule 2

22  Transitional regulations

The Governor‑General may make regulations of a transitional nature relating to the transition from the application of paragraph (b) of the definition of emissions‑intensive trade‑exposed activity in subsection 5(1) of the Renewable Energy (Electricity) Act 2000 (as inserted by item 2 of this Schedule) to the application of paragraph (a) of the definition of that expression.

Schedule 3

3  Definitions

In this Part:

accredited power station has the same meaning as in the Commonwealth Act.

Commonwealth Act means the Renewable Energy (Electricity) Act 2000.

Commonwealth regulator:

                     (a)  at any time before section 3 of the Carbon Pollution Reduction Scheme Act 2009 commences--means the Regulator (within the meaning of the Commonwealth Act); and

                     (b)  at any time after the Carbon Pollution Reduction Scheme Act 2009 commences--means the Authority (within the meaning of the Australian Climate Change Regulatory Authority Act 2009).

renewable energy certificate has the same meaning as in the Commonwealth Act.

small generation unit has the same meaning as in the Commonwealth Act.

State Act means a law of a State that substantially corresponds to the Commonwealth Act.

State certificate means a certificate, created under a State Act, that is substantially the same as a renewable energy certificate.

State regulator means a person or body appointed under a State Act that has substantially the same kind of functions under the State Act as the Commonwealth regulator has under the Commonwealth Act.

5  Existing accreditations not to continue if notice given

A nominated person for a power station under a State Act may notify the Commonwealth regulator, in writing by 30 November 2009, that subitems 4(1) and (3) of this Schedule do not apply in relation to the power station. A notice has effect accordingly.

The following provisions commence on 1 February 2010:

Schedule 3

4  Continuation of existing accreditations

(1)        If a power station was, immediately before the day on which this item commences, accredited under a State Act and not already accredited under the Commonwealth Act:

                     (a)  the power station is taken to be eligible for accreditation under section 15 of the Commonwealth Act; and

                     (b)  the Commonwealth regulator is taken to have made a determination under paragraph 14(1)(a) of the Commonwealth Act that the components of the power station (as accredited under the State Act) are to be taken to be a power station for the purposes of the Commonwealth Act; and

                     (c)  the Commonwealth regulator is taken to have approved an application for accreditation on the day on which this item commences.

(2)        To avoid doubt, subsection 14(3) of the Commonwealth Act applies in relation to an application mentioned in paragraph (1)(b) of this item.

(3)        If a person was, immediately before the day on which this item commences, a nominated person for a power station under a State Act:

                     (a)  the person is taken to be:

                              (i)  a registered person (unless the person is already a registered person under the Commonwealth Act); and

                             (ii)  a nominated person for the power station;

                            under the Commonwealth Act on and after the day on which this item commences; and

                     (b)  the Commonwealth regulator is taken to have approved an application for the person to be registered on the day on which this item commences (unless the person is already a registered person under the Commonwealth Act).

(4)        To avoid doubt, section 12 of the Commonwealth Act applies in relation to an application mentioned in paragraph (3)(b) of this item as if the person were the applicant.

Renewable energy certificate must not be created if State certificate created

Despite section 18 of the Commonwealth Act, a nominated person (within the meaning of the Commonwealth Act) for an accredited power station must not create a renewable energy certificate for any electricity generated by the power station if a State certificate has been created in relation to that electricity.

9  Transitional regulations

(1)        The Governor‑General may make regulations prescribing matters:

                     (a)  required or permitted by this Part to be prescribed; or

                     (b)  necessary or convenient to be prescribed for carrying out or giving effect to this Part.

(2)        Without limiting subitem (1), regulations of a transitional nature may be made in relation to the following matters:

                     (a)  matters arising from the amendment or repeal of a State Act;

                     (b)  exemptions from fees payable under regulations;

                     (c)  the number of renewable energy certificates that may be created in relation to a small generation unit.

The following provisions commence on 7 June 2010 unless proclaimed earlier:

Schedule 3

6  Conversion of State certificates to renewable energy certificates

(1)        If, before 15 May 2010, a State regulator for a State gives written notice to the Commonwealth regulator that a State certificate has been surrendered:

                     (a)  under a provision of the State Act of the State that substantially corresponds to section 28A of the Commonwealth Act; and

                     (b)  after 1 April 2010; and

                     (c)  for the purposes of this subitem;

then the Commonwealth regulator must, before 15 June 2010:

                     (d)  create a renewable energy certificate in respect of the State certificate; and

                     (e)  register the renewable energy certificate under section 26 of the Commonwealth Act.

(2)        If, on or after 15 May 2010 but before 2 November 2010, a State regulator for a State gives written notice to the Commonwealth regulator that a State certificate has been surrendered:

                     (a)  under a provision of the State Act of the State that substantially corresponds to section 28A of the Commonwealth Act; and

                     (b)  after 1 April 2010; and

                     (c)  for the purposes of this subitem;

then the Commonwealth regulator must, before 1 December 2010:

                     (d)  create a renewable energy certificate in respect of the State certificate; and

                     (e)  register the renewable energy certificate under section 26 of the Commonwealth Act.

(3)        A notice under subitem (1) or (2) must:

                     (a)  be in the prescribed form; and

                     (b)  include any information prescribed by the regulations.

(4)        Despite subitems (1) and (2), a renewable energy certificate may only be created for a State certificate once.

(5)        For the purposes of a renewable energy certificate created in respect of a State certificate under subitem (1) or (2):

                     (a)  the renewable energy certificate is treated as if it had been created under a prescribed provision of the Commonwealth Act; and

                     (b)  the person who created the State certificate is treated as having created the renewable energy certificate; and

                     (c)  subject to paragraph (6)(c), the person who owned the State certificate, immediately before it was surrendered under the State Act, is treated as the owner of the renewable energy certificate.

(6)        Section 26 of the Commonwealth Act applies in relation to a renewable energy certificate created under subitem (1) or (2) as if:

                     (a)  subsections (2), (3), (3A), (5) and (6) were ignored; and

                     (b)  the Commonwealth regulator had determined that the renewable energy certificate is eligible for registration under subsection (4); and

                     (c)  for the purposes of recording the ownership of the renewable energy certificate as mentioned in subsection (4)--the owner of the renewable energy certificate had created the certificate.

(7)        A renewable energy certificate created in respect of a State certificate under subitem (1) or (2) is not a certificate for the purpose of section 23F of the Commonwealth Act.

(8)        If a renewable energy certificate is created in respect of a State certificate under subitem (1) or (2), the register of renewable energy certificates maintained under section 135 of the Commonwealth Act must also contain the year in which the State certificate was created.

Notice of conversion to be given by Commonwealth regulator

(9)        The Commonwealth regulator must notify, in writing, the following persons that a renewable energy certificate has been created in respect of a State certificate and registered under section 26 of the Commonwealth Act:

                     (a)  the creator of the State certificate;

                     (b)  the relevant State regulator;

                     (c)  if the owner of the renewable energy certificate is not the creator of the State certificate--the owner of the renewable energy certificate.

(10)      The Commonwealth regulator must provide the notice as soon as practicable after the renewable energy certificate has been registered under section 26 of the Commonwealth Act.

7  No criminal liability for Commonwealth regulator

Nothing in item 6 makes the Commonwealth regulator liable to be prosecuted for an offence.