WORK HEALTH AND SAFETY REGULATION 2011

- made under the Work Health and Safety Act 2011

TABLE OF PROVISIONS

CHAPTER 1--PRELIMINARY

   PART 1.1--INTRODUCTORY MATTERS

   1.      Name of regulation  
   2.      Commencement  
   5.      Dictionary  
   6A.     Offences are offences of strict liability  
   6B.     Offences against regulation—application of Criminal Code etc  
   7.      Meaning of person conducting a business or undertaking—persons  
   8.      Meaning of supply—Act, s 6 (3) (b)  
   9.      Provisions linked to health and safety duties in Act—Act, sch 3,  
   9A.     Meaning of corresponding WHS law—Act, dict  

   PART 1.2--APPLICATION

   10.     Application of the Act to dangerous goods and high risk plant—Act,  
   11.     Application of this regulation  
   12.     Assessment of risk in relation to a class of hazards, tasks, circumstances or  

   PART 1.3--INCORPORATED DOCUMENTS

   13.     Documents incorporated as in force when incorporated  
   14.     Inconsistencies between provisions  
   15.     References to standards  

CHAPTER 2--REPRESENTATION AND PARTICIPATION

   PART 2.1--REPRESENTATION

           Division 2.1.1--Work groups

   16.     Negotiations for and determination of work groups  
   17.     Matters to be taken into account in negotiations—Act, s 52 (6) and  

           Division 2.1.2--Health and safety representatives

   18.     Procedures for election of health and safety  
   19.     Person conducting business or undertaking must not delay election  
   20.     Removal of health and safety  
   21.     Training for health and safety  

   PART 2.2--ISSUE RESOLUTION

   22.     Agreed procedure—minimum requirements  
   23.     Default procedure—Act, s 81 (2)  

   PART 2.3--CESSATION OF UNSAFE WORK

   24.     Continuity of engagement of worker—Act, s 88  

   PART 2.4--WORKPLACE ENTRY BY WHS ENTRY PERMIT-HOLDERS

   25.     Training requirements for WHS entry permits—Act, s 131 and  
   26.     Form of WHS entry permit  
   27.     Notice of entry—general  
   28.     Additional requirements—entry under Act, s 117—Act,  
   29.     Additional requirements—entry under Act, s 120—Act,  
   30.     Additional requirements—entry under Act, s 121—Act,  
   31.     Register of WHS entry permit-holders—Act, s 151  

CHAPTER 3--GENERAL RISK AND WORKPLACE MANAGEMENT

   PART 3.1--MANAGING RISKS TO HEALTH AND SAFETY

   32.     Application—pt 3.1  
   33.     Specific requirements must be complied with  
   34.     Duty to identify hazards  
   35.     Managing risks to health and safety  
   36.     Hierarchy of control measures  
   37.     Maintenance of control measures  
   38.     Review of control measures  

   PART 3.2--GENERAL WORKPLACE MANAGEMENT

           Division 3.2.1--Information, training and instruction

   39.     Provision of information, training and  

           Division 3.2.2--General working environment

   40.     Duty in relation to general workplace facilities  
   41.     Duty to provide and maintain adequate and accessible facilities  

           Division 3.2.3--First-aid

   42.     Duty to provide first-aid  

           Division 3.2.4--Emergency plans

   43.     Duty to prepare, maintain and implement emergency plan  

           Division 3.2.5--Personal protective equipment

   44.     Provision to workers and use of personal protective equipment  
   45.     Personal protective equipment used by other persons  
   46.     Duties of worker  
   47.     Duty of person other than worker  

           Division 3.2.6--Remote or isolated work

   48.     Remote or isolated work—Act, s 19  

           Division 3.2.7--Managing risks from airborne contaminants

   49.     Ensuring exposure standards for substances and mixtures not exceeded  
   50.     Monitoring airborne contaminant levels  

           Division 3.2.8--Hazardous atmospheres

   51.     Managing risks to health and safety—Act, s 19  
   52.     Ignition sources—Act, s 19  

           Division 3.2.9--Storage of flammable or combustible substances

   53.      U Flammable and combustible substances not to be accumulated [See Endnotes]  

           Division 3.2.10--Falling objects

   54.     Management of risk of falling objects—Act, s 19  
   55.     Minimising risk associated with falling objects  

CHAPTER 4--HAZARDOUS WORK

   PART 4.1--NOISE

   56.     Meaning of exposure standard for noise  
   57.     Managing risk of hearing loss from noise—Act, s 19  
   58.     Audiometric testing  
   59.     Duties of designers, manufacturers, importers and suppliers of  

   PART 4.2--HAZARDOUS MANUAL TASKS

   60.     Managing risks to health and safety—Act, s 19  
   61.     Duties of designers, manufacturers, importers and suppliers of plant or  

   PART 4.3--CONFINED SPACES

           Division 4.3.1--Preliminary

   62.     Confined spaces to which this part applies  
   63.     Application to emergency service workers  

           Division 4.3.2--Duties of designer, manufacturer, importer, supplier, installer and constructor of plant or structure

   64.     Duty to eliminate or minimise risk  

           Division 4.3.3--Duties of person conducting business or undertaking

   65.     Entry into confined space must comply with this division  
   66.     Managing risks to health and safety—Act, s 19  
   67.     Confined space entry permit  
   68.     Signage  
   69.     Communication and safety monitoring  
   70.     Specific control—connected plant and services  
   71.     Specific control—atmosphere  
   72.     Specific control—flammable gases and vapours  
   73.     Specific control—fire and explosion  
   74.     Emergency procedures  
   75.     Personal protective equipment in emergencies  
   76.     Information, training and instruction for workers  
   77.     Confined space entry permit and risk assessment must be kept  

   PART 4.4--FALLS

   78.     Management of risk of fall—Act, s 19  
   79.     Specific requirements to minimise risk of fall  
   80.     Emergency and rescue procedures  

   PART 4.5--HIGH RISK WORK

           Division 4.5.1--Licensing of high risk work

              Subdivision 4.5.1.1--Requirement to be licensed

   81.     Licence required to carry out high risk work  
   82.     Exceptions  
   83.     Recognition of high risk work licences in other jurisdictions  
   84.     Duty of person conducting business or undertaking to ensure direct  
   85.     Evidence of licence—duty of person conducting business or  

              Subdivision 4.5.1.2--Licensing process

   86.     Who may apply for a licence  
   87.     Application for high risk work licence  
   88.     Additional information  
   89.     Decision on application  
   90.     Matters to be taken into account  
   91.     Refusal to grant high risk work licence—process  
   92.     Duration of licence  
   93.     Licence document  
   94.     Licence document to be available  
   95.     Reassessment of competency of licence-holder  

              Subdivision 4.5.1.3--Amendment of licence document

   96.     Notice of change of address  
   97.     Licence-holder to return licence  
   98.     Replacement licence document  
   99.     Voluntary surrender of licence  

              Subdivision 4.5.1.4--Renewal of high risk work licence

   100.    Regulator may renew licence  
   101.    Application for renewal  
   102.    Licence continues in force until application is decided  
   103.    Renewal of expired licence  
   104.    Provisions relating to renewal of licence  
   105.    Status of licence during review  

              Subdivision 4.5.1.5--Suspension and cancellation of high risk work
              licence

   106.    Suspension or cancellation of licence  
   107.    Matters taken into account  
   108.    Notice to and submissions by licence-holder  
   109.    Notice of decision  
   110.    Immediate suspension  
   111.    Licence-holder to return licence document  
   112.    Regulator to return licence document after suspension  

   PART 4.6--DEMOLITION WORK

   142.    Notice of demolition work  

   PART 4.7--GENERAL ELECTRICAL SAFETY IN WORKPLACES AND ENERGISED ELECTRICAL WORK

           Division 4.7.1--Preliminary

   144.    Meaning of electrical equipment—pt 4.7  
   145.    Meaning of electrical installation—pt 4.7  
   146.    Meaning of electrical work—pt 4.7  

           Division 4.7.2--General risk management

   147.    Risk management—Act, s 19  

           Division 4.7.3--Electrical equipment and electrical installations

   148.    Electrical equipment and electrical installations—div 4.7.3  
   149.    Unsafe electrical equipment  
   150.    Inspection and testing of electrical equipment  
   151.    Untested electrical equipment not to be used  

           Division 4.7.4--Electrical work on energised electrical equipment

   152.     U Application—div 4.7.4 [See Endnotes]  
   153.     U Persons conducting a business or undertaking—div 4.7.4 [See Endnotes]  
   154.     U Electrical work on energised electrical equipment—prohibited [See Endnotes]  
   155.     U Duty to determine whether equipment is energised [See Endnotes]  
   156.     U De-energised equipment must not be inadvertently re-energised [See Endnotes]  
   157.     U Electrical work on energised electrical equipment—when permitted [See Endnotes]  
   158.     U Preliminary steps [See Endnotes]  
   159.     U Unauthorised access to equipment being worked on [See Endnotes]  
   160.     U Contact with equipment being worked on [See Endnotes]  
   161.     U How the work is to be carried out [See Endnotes]  
   162.     U Record keeping [See Endnotes]  

           Division 4.7.5--Electrical equipment and installations and construction work—additional duties

   163.    Duty of person conducting business or undertaking  

           Division 4.7.6--Residual current devices

   164.     U Use of socket outlets in hostile operating environment [See Endnotes]  
   165.     U Testing of residual current devices [See Endnotes]  

           Division 4.7.7--Overhead and underground electric lines

   166.    Duty of person conducting a business or undertaking  

   PART 4.8--DIVING WORK

           Division 4.8.1--Preliminary

   167.    Purpose—pt 4.8  

           Division 4.8.2--General diving work—fitness and competence of worker

   168.     U Person conducting business or undertaking must ensure fitness of [See Endnotes]  
   169.     U Certificate of medical fitness [See Endnotes]  
   170.     U Duty to keep certificate of medical fitness [See Endnotes]  
   171.     U Competence of worker—general diving [See Endnotes]  
   172.     U Competence of worker—incidental diving [See Endnotes]  
   173.     U Competence of worker—limited scientific diving [See Endnotes]  
   174.     U Competence of competent person supervising general diving [See Endnotes]  
   175.     U Evidence of competence—duty of person conducting business or [See Endnotes]  

           Division 4.8.3--Managing risks—general diving work

   176.     U Management of risks to health and safety—Act, s 19 [See Endnotes]  
   177.     U Appointment of competent person to supervise diving work [See Endnotes]  
   178.     U Additional control—dive plan [See Endnotes]  
   179.     U Dive plan must be complied with [See Endnotes]  
   180.     U Additional control—dive safety log to be kept [See Endnotes]  
   181.     U Use of dive safety log [See Endnotes]  
   182.     U Record keeping [See Endnotes]  

           Division 4.8.4--High risk diving work

   183.     U Duties of person conducting business or [See Endnotes]  
   184.     U Duty of worker—competence—Act, s 44 [See Endnotes]  

CHAPTER 5--PLANT AND STRUCTURES

   PART 5.1--GENERAL DUTIES FOR PLANT AND STRUCTURES

           Division 5.1.1--Preliminary

   185.    Application—pt 5.1 to plant  
   186.    Application—pt 5.1 to structures  

           Division 5.1.2--Duties of persons conducting businesses or undertakings that design plant

   187.    Provision of information to manufacturer  
   188.    Hazard identified in design during manufacture  
   189.    Guarding  
   190.    Operational controls  
   191.    Emergency stop controls  
   192.    Warning devices  

           Division 5.1.3--Duties of persons conducting businesses or undertakings that manufacture plant

   193.    Control of risk—Act, s 23  
   194.    Guarding  
   195.    Information must be obtained and provided  

           Division 5.1.4--Duties of persons conducting businesses or undertakings that import plant

   196.    Information to be obtained and provided by importer  
   197.    Control of risk  

           Division 5.1.5--Duties of persons conducting businesses or undertakings that supply plant

   198.    Information to be obtained and provided by supplier  
   199.    Supply of second-hand plant—duties of supplier  
   200.    Second-hand plant to be used for scrap or spare parts  

           Division 5.1.6--Duties of persons conducting businesses or undertakings that install, construct or commission plant or structures

   201.    Duties of persons conducting businesses or undertakings that install, construct or  
   202.    Duties of persons conducting businesses or undertakings that install, construct or  

           Division 5.1.7--General duties of a person conducting a business or undertaking involving the management or control of plant

              Subdivision 5.1.7.1--Management of risks

   203.    Management of risks to health and safety—Act, s 21  

              Subdivision 5.1.7.2--Additional control measures for general plant

   204.    Control of risks arising from installation or commissioning  
   205.    Preventing unauthorised alterations to or interference with plant  
   206.    Proper use of plant and controls  
   207.    Plant not in use  
   208.    Guarding  
   209.    Guarding and insulation from heat and cold  
   210.    Operational controls  
   211.    Emergency stops  
   212.    Warning devices  
   213.    Maintenance and inspection of plant  

              Subdivision 5.1.7.3--Additional control measures for certain plant

   214.    Powered mobile plant—general control of  
   215.    Powered mobile plant—specific control measures  
   216.    Roll-over protection on tractors  
   217.    Protective structures on earthmoving machinery  
   218.    Industrial lift trucks  
   219.    Plant that lifts or suspends loads  
   220.    Exception—plant not specifically designed to lift or suspend a person  
   221.    Plant used in connection with tree lopping  
   222.    Industrial robots  
   223.    Lasers  
   224.    Pressure equipment  
   225.    Scaffolds  
   226.    Plant with presence-sensing safeguarding system—records  

   PART 5.2--ADDITIONAL DUTIES RELATING TO REGISTERED PLANT AND PLANT DESIGNS

           Division 5.2.1--Application—pt 5.2

   227.    Application—pt 5.2  

           Division 5.2.2--Duty of person conducting a business or undertaking who designs plant to record plant design

   228.     U Records and information [See Endnotes]  
   229.     U Record of standards or engineering principles used [See Endnotes]  
   230.     U Records to be available for inspection [See Endnotes]  

           Division 5.2.3--Duties of a person conducting a business or undertaking

   231.     U Duty of persons conducting businesses or undertakings that manufacture [See Endnotes]  
   232.     U Duty of persons conducting businesses or undertakings that import [See Endnotes]  
   233.     U Duty of persons conducting businesses or undertakings that supply [See Endnotes]  
   234.     U Duty of persons conducting businesses or undertakings that commission [See Endnotes]  

           Division 5.2.4--Duties of a person conducting a business or undertaking involving the management or control of plant

              Subdivision 5.2.4.1--Control measures for registered plant

   235.     U Major inspection of registered mobile cranes and tower cranes [See Endnotes]  
   236.    Lifts  
   237.    Records of plant  

              Subdivision 5.2.4.2--Control measures for amusement devices

   238.    Operation of amusement devices  
   239.    Storage of amusement devices  
   240.    Maintenance, inspection and testing of amusement device  
   241.    Annual inspection of amusement device  
   242.    Log book and manuals for amusement device  

   PART 5.3--REGISTRATION OF PLANT DESIGNS AND ITEMS OF PLANT

           Division 5.3.1--Plant designs to be registered

   243.     U Plant design to be registered—Act, s 42 [See Endnotes]  
   244.     U Altered plant designs to be registered—Act, s 42 [See Endnotes]  
   245.     U Recognition of designs registered by corresponding regulator [See Endnotes]  

           Division 5.3.2--Items of plant to be registered

   246.     U Items of plant to be registered—Act, s 42 [See Endnotes]  
   247.     U Recognition of plant registered by corresponding regulator [See Endnotes]  

           Division 5.3.3--Registration process for plant designs

   248.     U Application—div 5.3.3 [See Endnotes]  
   249.     U Who can apply to register a plant design [See Endnotes]  
   250.     U Application for registration [See Endnotes]  
   251.     U Design verification statement [See Endnotes]  
   252.     U Who can be the design verifier [See Endnotes]  
   253.     U Duty of design verifier [See Endnotes]  
   254.     U Design verification statements not to be made in certain [See Endnotes]  
   255.     U Additional information [See Endnotes]  
   256.     U Decision on application [See Endnotes]  
   257.     U Refusal of registration—process [See Endnotes]  
   258.     U Conditions of registration [See Endnotes]  
   259.     U Duration of registration of plant design [See Endnotes]  
   260.     U Plant design registration number [See Endnotes]  
   261.     U Registration document [See Endnotes]  
   262.     U Registration document to be available [See Endnotes]  
   263.     U Disclosure of design information [See Endnotes]  

           Division 5.3.4--Registration process for an item of plant

   264.     U Application—div 5.3.4 [See Endnotes]  
   265.     U Who can apply to register an item of plant [See Endnotes]  
   266.     U Application for registration [See Endnotes]  
   267.     U When is a person competent to inspect plant [See Endnotes]  
   268.     U Additional information [See Endnotes]  
   269.     U Decision on application [See Endnotes]  
   270.     U Refusal of registration—process [See Endnotes]  
   271.     U Conditions of registration [See Endnotes]  
   272.     U Duration of registration [See Endnotes]  
   273.     U Plant registration number [See Endnotes]  
   274.     U Registration document [See Endnotes]  
   275.     U Registration document to be available [See Endnotes]  
   276.     U Regulator may renew registration [See Endnotes]  
   277.     U Application for renewal [See Endnotes]  
   278.     U Registration continues in force until application is decided [See Endnotes]  
   279.     U Decision on application [See Endnotes]  
   280.     U Status of registration during review [See Endnotes]  

           Division 5.3.5--Changes to registration and registration documents

   281.     U Application—div 5.3.5 [See Endnotes]  
   282.     U Changes to information [See Endnotes]  
   283.     U Amendment of registration imposed by regulator [See Endnotes]  
   284.     U Amendment on application by registration holder [See Endnotes]  
   285.     U Minor corrections to registration [See Endnotes]  
   286.     U Regulator to give amended registration document [See Endnotes]  
   287.     U Registration holder to return registration document [See Endnotes]  
   288.     U Replacement registration document [See Endnotes]  

CHAPTER 6--CONSTRUCTION WORK

   PART 6.1--PRELIMINARY

   289.    Meaning of construction work—ch 6  
   290.    Meaning of structure—ch 6  
   291.    Meaning of high risk construction work—ch 6  
   292.    Meaning of construction project—ch 6  
   293.    Meaning of principal contractor—ch 6  

   PART 6.2--DUTIES OF DESIGNER OF STRUCTURE AND PERSON WHO COMMISSIONS CONSTRUCTION WORK

   294.    Person who commissions work must consult with designer  
   295.    Designer must give safety report to person who commissions design  
   296.    Person who commissions project must give information to principal  

   PART 6.3--DUTIES OF PERSON CONDUCTING BUSINESS OR UNDERTAKING

           Division 6.3.1--General

   297.    Management of risks to health and safety—Act, s 19  
   298.    Security of workplace  

           Division 6.3.2--High risk construction work—safe work method statements

   299.    Safe work method statement required for high risk construction  
   300.    Compliance with safe work method statement  
   301.    Safe work method statement—copy to be given to principal  
   302.    Review of safe work method statement  
   303.    Safe work method statement must be kept  

           Division 6.3.3--Excavation Work

   304.    Excavation work—underground essential services information  
   305.    Management of risks to health and safety associated with excavation  
   306.    Additional controls—trenches  

   PART 6.4--ADDITIONAL DUTIES OF PRINCIPAL CONTRACTOR

   307.    Application—pt 6.4  
   308.    Specific control measure—signage identifying principal  
   309.     U WHS management plan—preparation [See Endnotes]  
   310.     U WHS management plan—duty to inform [See Endnotes]  
   311.     U WHS management plan—review [See Endnotes]  
   312.    High risk construction work—safe work method statements  
   313.     U Copy of WHS management plan must be kept [See Endnotes]  
   314.    Further health and safety duties—specific regulations  
   315.    Further health and safety duties—specific  

   PART 6.5--GENERAL CONSTRUCTION INDUCTION TRAINING

           Division 6.5.1--General construction induction training requirements

   316.    Duty to provide general construction induction training  
   317.    Duty to ensure worker has been trained  
   318.    Recognition of general construction induction training cards issued in other  

           Division 6.5.2--General construction induction training cards

   319.    Issue of card  
   320.    Content of card  
   321.    Replacement card  
   322.    Refusal to issue or replace card  
   323.    Cancellation of card—grounds  
   324.    Cancellation of card—process  

           Division 6.5.3--Duties of workers

   326.    Duties of workers  
   327.    Alteration of general construction induction training card  

CHAPTER 11--GENERAL

   PART 11.1--REVIEW OF DECISIONS UNDER THIS REGULATION

           Division 11.1.1--Reviewable decisions

   676.    Which decisions under this regulation are reviewable  

           Division 11.1.2--Internal review

   677.    Application  
   678.    Application for internal review  
   679.    Internal reviewer  
   680.    Decision of internal reviewer  
   681.    Decision on internal review  
   682.    Internal review—reviewable decision continues  

           Division 11.1.3--External review

   683.    Application for external review  

   PART 11.2--EXEMPTIONS

           Division 11.2.1--General

   684.    General power to grant exemptions  
   685.    Matters to be considered in granting exemptions  

           Division 11.2.2--High risk work licences

   686.    High risk work licence—exemption  
   687.    High risk work licence—regulator to be satisfied about certain  

           Division 11.2.4--Exemption process

   691.    Conditions of exemption  
   692.    Form of exemption document  
   693.    Compliance with conditions of exemption  
   694.    Notice of decision in relation to exemption  
   695.    Publication of notice of exemption  
   696.    Notice of refusal of exemption  
   697.    Amendment or cancellation of exemption  
   698.    Notice of amendment or cancellation  

   PART 11.3--MISCELLANEOUS

   699.    Incident notification—prescribed serious  
   700.    Inspectors' identity cards—Act, s 157 (1) (e)  
   701.    Review of decisions under the Act—stay of decision—Act, s  
   702.    Confidentiality of information—exception relating administration or enforcement of other  

CHAPTER 20--TRANSITIONAL

   PART 20.1--DEFINITIONS

   800.    Definitions—ch 20  

   PART 20.2--GENERAL

   801.    Duty to prepare emergency plan  
   802.    Audiometric testing  
   803.    Confined space entry permit to be completed by competent person  
   804.    High risk work licences—competency requirements  
   805.    High risk work licences—VET courses  

   PART 20.3--WORK SAFETY REGULATION 2009

   806.    Old entry permit to be confined space entry permit  
   807.    Old high risk work licences to be new high risk work licences  
   808.    Old statement of attainment taken to be certification  
   809.    Old construction induction training cards to be general construction induction  
   810.    Expiry—pt 20.3  

   PART 20.4--OCCUPATIONAL HEALTH AND SAFETY (CERTIFICATION OF PLANT USERS AND OPERATORS) REGULATION 2000

   811.    Definitions—pt 20.4  
   812.    Continuing application of repealed regulation in relation to scheduled work  
   813.    Application of regulation in relation to scheduled work etc  
   814.    Certificates of competency  
   815.    Converting certificate of competency to licence  
   816.    Expiry—pt 20.4  

   PART 20.4A--MODIFICATION OF ACT

   816A.   Modification of Act, pt 20—Act, s 306  

   PART 20.5--EXPIRY

   817.    Expiry—ch 20  
           SCHEDULE 3
           SCHEDULE 4
           SCHEDULE 5
           DICTIONARY
           ENDNOTES